2 resultados para Arranjos Produtivos Locais
em Universidade Federal de Uberlândia
Resumo:
Due to the growing use of social networks people no longer just consume data, they also produce and share it. Geo-tagged information, i.e., data with geographical location, have been used in many attempts to identify popular places and help tourists that will visit unfamiliar cities. This Master Thesis presents an online strategy that uses geo-tagged photos and their metadata in order to identify places of interest inside a given geographical area and retrieve relevant related information. The whole process runs automatically in real time, returning updated information about places. The proposed strategy takes into account the inherent dynamism of social media, and thus is robust under inconsistencies and/or outdated information, a common issue in solutions that rely on previously stored data. The analysis of the results showed that our approach is very promising, returning places that present high agreement with those from a popular travel website.
Resumo:
The Virtual Reality techniques applied in Electricity Environments provide a new supervisory control paradigm. The fact of existing a virtual environment (VE), geometrically similar to a real substation, reduces the difference of mental models built by field operators compared with those built by system center operation improving the communication. Beside this, those systems can be used as visualization interfaces for electricity system simulators, training systems for professors and undergraduate students, field operators and maintenance professionals. However, the development process of these systems is quite complex, combining several activities such as implementation, 3D modeling, virtual sceneries construction, usability assessment and management project techniques. In this context, this work present a GUI strategy to build field arrangements based on scene graphs, to reduce time in Virtual Electricity Substations Arrangement development. Through this, mistakes during the VE building can be avoided making this process more reliable. As an concept proof, all toolkits developed in this work were applied in the virtualization of the substations from a Brazilian power concessionary named CEMIG.