Non-preemptive two-machine flow-shop scheduling problem with uncertain processing times of n jobs is studied. In an uncertain version of a scheduling problem, there may not exist a unique schedule that remains optimal for all possible realizations of the job processing times. We find necessary and sufficient conditions (Theorem 1) when there exists a dominant permutation that is optimal for all possible realizations of the job processing times. Our computational studies show the percentage of the problems solvable under these conditions for the cases of randomly generated instances with n ≤ 100 . We also show how to use additional information about the processing times of the completed jobs during optimal realization of a schedule (Theorems 2 – 4). Computational studies for randomly generated instances with n ≤ 50 show the percentage of the two- machine flow-shop scheduling problems solvable under the sufficient conditions given in Theorems 2 – 4.
Resumo:
The problem of preparation of a program to perform it on multiprocessor system of a cluster type is considered. When developing programs for a cluster computer the technology based on use of the remote terminal is applied. The situation when such remote terminal is the computer with operational system Windows is considered. The set of the tool means, allowing carrying out of editing program texts, compiling and starting programs on a cluster computer, is suggested. Advantage of an offered way of preparation of programs to execution is that it allows as much as possible to use practical experience of programmers used to working in OS Windows environment.
Resumo:
The usual assumption that the processing times of the operations are known in advance is the strictest one in scheduling theory. This assumption essentially restricts practical aspects of deterministic scheduling theory since it is not valid for the most processes arising in practice. The paper is devoted to a stability analysis of an optimal schedule, which may help to extend the significance of scheduling theory for decision-making in the real-world applications. The term stability is generally used for the phase of an algorithm, at which an optimal solution of a problem has already been found, and additional calculations are performed in order to study how solution optimality depends on variation of the numerical input data.
Resumo:
Доклад, поместен в сборника на Националната конференция "Образованието в информационното общество", Пловдив, май, 2011 г.