Resumo:
Non-preemptive two-machine flow-shop scheduling problem with uncertain processing times of n jobs is studied. In an uncertain version of a scheduling problem, there may not exist a unique schedule that remains optimal for all possible realizations of the job processing times. We find necessary and sufficient conditions (Theorem 1) when there exists a dominant permutation that is optimal for all possible realizations of the job processing times. Our computational studies show the percentage of the problems solvable under these conditions for the cases of randomly generated instances with n ≤ 100 . We also show how to use additional information about the processing times of the completed jobs during optimal realization of a schedule (Theorems 2 – 4). Computational studies for randomly generated instances with n ≤ 50 show the percentage of the two- machine flow-shop scheduling problems solvable under the sufficient conditions given in Theorems 2 – 4.
Resumo:
The paper has been presented at the International Conference Pioneers of Bulgarian Mathematics, Dedicated to Nikola Obreshkoff and Lubomir Tschakalo ff , Sofia, July, 2006.
Resumo:
The paper treats the task for cluster analysis of a given assembly of objects on the basis of the information contained in the description table of these objects. Various methods of cluster analysis are briefly considered. Heuristic method and rules for classification of the given assembly of objects are presented for the cases when their division into classes and the number of classes is not known. The algorithm is checked by a test example and two program products (PP) – learning systems and software for company management. Analysis of the results is presented.
Resumo:
We consider an uncertain version of the scheduling problem to sequence set of jobs J on a single machine with minimizing the weighted total flow time, provided that processing time of a job can take on any real value from the given closed interval. It is assumed that job processing time is unknown random variable before the actual occurrence of this time, where probability distribution of such a variable between the given lower and upper bounds is unknown before scheduling. We develop the dominance relations on a set of jobs J. The necessary and sufficient conditions for a job domination may be tested in polynomial time of the number n = |J| of jobs. If there is no a domination within some subset of set J, heuristic procedure to minimize the weighted total flow time is used for sequencing the jobs from such a subset. The computational experiments for randomly generated single-machine scheduling problems with n ≤ 700 show that the developed dominance relations are quite helpful in minimizing the weighted total flow time of n jobs with uncertain processing times.
Resumo:
Today, due to globalization of the world the size of data set is increasing, it is necessary to discover the knowledge. The discovery of knowledge can be typically in the form of association rules, classification rules, clustering, discovery of frequent episodes and deviation detection. Fast and accurate classifiers for large databases are an important task in data mining. There is growing evidence that integrating classification and association rules mining, classification approaches based on heuristic, greedy search like decision tree induction. Emerging associative classification algorithms have shown good promises on producing accurate classifiers. In this paper we focus on performance of associative classification and present a parallel model for classifier building. For classifier building some parallel-distributed algorithms have been proposed for decision tree induction but so far no such work has been reported for associative classification.
Resumo:
* The research is supported partly by INTAS: 04-77-7173 project, http://www.intas.be
Resumo:
The parallel resolution procedures based on graph structures method are presented. OR-, AND- and DCDP- parallel inference on connection graph representation is explored and modifications to these algorithms using heuristic estimation are proposed. The principles for designing these heuristic functions are thoroughly discussed. The colored clause graphs resolution principle is presented. The comparison of efficiency (on the Steamroller problem) is carried out and the results are presented. The parallel unification algorithm used in the parallel inference procedure is briefly outlined in the final part of the paper.
Resumo:
The usual assumption that the processing times of the operations are known in advance is the strictest one in scheduling theory. This assumption essentially restricts practical aspects of deterministic scheduling theory since it is not valid for the most processes arising in practice. The paper is devoted to a stability analysis of an optimal schedule, which may help to extend the significance of scheduling theory for decision-making in the real-world applications. The term stability is generally used for the phase of an algorithm, at which an optimal solution of a problem has already been found, and additional calculations are performed in order to study how solution optimality depends on variation of the numerical input data.
Resumo:
In this paper an evolutionary algorithm is proposed for solving the problem of production scheduling in assembly system. The aim of the paper is to investigate a possibility of the application of evolutionary algorithms in the assembly system of a normally functioning enterprise producing household appliances to make the production graphic schedule.