4 resultados para Process Management, Maturity Model, CMM, Delphi Study
em Bulgarian Digital Mathematics Library at IMI-BAS
Resumo:
Let V be an array. The range query problem concerns the design of data structures for implementing the following operations. The operation update(j,x) has the effect vj ← vj + x, and the query operation retrieve(i,j) returns the partial sum vi + ... + vj. These tasks are to be performed on-line. We define an algebraic model – based on the use of matrices – for the study of the problem. In this paper we establish as well a lower bound for the sum of the average complexity of both kinds of operations, and demonstrate that this lower bound is near optimal – in terms of asymptotic complexity.
Resumo:
ACM Computing Classification System (1998): D.0, D.2.11.
Resumo:
This article introduces a small setting case study about the benefits of using TSPi in a software project. An adapted process from the current process based on the TSPi was defined. The pilot project had schedule and budget constraints. The process began by gathering historical data from previous projects in order to get a measurement repository. The project was launched with the following goals: increase the productivity, reduce the test time and improve the product quality. Finally, the results were analysed and the goals were verified.
Resumo:
Our previous research about possible quality improvements in Extreme Programming (XP) led us to a conclusion that XP supports many good engineering practices but there is still place for refinements. Our proposal was to add dedicated Quality Assurance (QA) measures, which should be sufficiently effective and at the same time simpler enough in the context of XP. This paper intends to analyze the possibilities for an effective way for applying approved quality assurance practices to XP. The last should not affect negatively to the process and in the meantime must lead to better quality assurance. We aim to make changes to XP that even if would slow down a bit the development process, will make it more suitable for widest range of projects including large and very large projects as well as life critical and highly reliable systems.