9 resultados para survey construction
em Aston University Research Archive
Resumo:
Numerous techniques have been developed to control cost and time of construction projects. However, there is limited research on issues surrounding the practical usage of these techniques. To address this, a survey was conducted on the top 150 construction companies and 100 construction consultancies in the UK aimed at identifying common project control practices and factors inhibiting effective project control in practice. It found that despite the vast application of control techniques a high proportion of respondents still experienced cost and time overruns on a significant proportion of their projects. Analysis of the survey results concluded that more effort should be geared at the management of the identified top project control inhibiting factors. This paper has outlined some measures for mitigating these inhibiting factors so that the outcome of project time and cost control can be improved in practice.
Resumo:
Purpose - The purpose of the paper is to the identify risk factors, which affect oil and gas construction projects in Vietnam and derive risk responses. Design/methodology/approach - Questionnaire survey was conducted with the involvement of project executives of PetroVietnam and statistical analysis was carried out in order to identify the major project risks. Subsequently, mitigating measures were derived using informal interviews with the various levels of management of PetroVietnam. Findings - Bureaucratic government system and long project approval procedures, poor design, incompetence of project team, inadequate tendering practices, and late internal approval processes from the owner were identified as major risks. The executives suggested various strategies to mitigate the identified risks. Reforming the government system, effective partnership with foreign collaborators, training project executives, implementing contractor evaluation using multiple criteria decision-making technique, and enhancing authorities of project people were suggested as viable approaches. Practical implications - The improvement measures as derived in this study would improve chances of project success in the oil and gas industry in Vietnam. Originality/value - There are several risk management studies on managing projects in developing countries. However, as risk factors vary considerably across industry and countries, the study of risk management for successful projects in the oil and gas industry in Vietnam is unique and has tremendous importance for effective project management.
Resumo:
The thesis addresses the economic impacts of construction safety in Greece. The research involved the development of a methodology for determining the overall costs of safety, namely the sum of the costs of accidents and the costs of safety management failures (with or without accident) including image cost. Hitherto, very little work has been published on the cost of accidents in practical case studies. Moreover, to the author’s belief, no research has been published that seeks to determine in real cases the costs of prevention. The methodology developed is new, transparent, and capable of being replicated and adapted to other employment sectors and to other countries. The methodology was applied to three construction projects in Greece to test the safety costing methodology and to offer some preliminary evidence on the business case for safety. The survey work took place between 1999 and 2001 and involved 27 months of costing work on site. The study focuses on the overall costs of safety that apply to the main (principal) contractor. The methodology is supported by 120 discrete cost categories, and systematic criteria for determining which costs are included (counted) in the overall cost of safety. A quality system (in compliance with ISO9000 series) was developed to support the work and ensure accuracy of data gathering. The results of the study offer some support for the business case for safety. Though they offer good support for the economics of safety as they demonstrate need for cost effectiveness. Subject to important caveats, those projects that appeared to manage safety more cost-effectively achieved the lowest overall safety cost. Nevertheless, results are significantly lower than of other published works for two main reasons; first costs due to damages with no potential to injury were not included and second only costs to main constructor were considered. Study’s results are discussed and compared with other publish works.
Resumo:
Despite the availability of various control techniques and project control software many construction projects still do not achieve their cost and time objectives. Research in this area so far has mainly been devoted to identifying causes of cost and time overruns. There is limited research geared towards studying factors inhibiting the ability of practitioners to effectively control their projects. To fill this gap, a survey was conducted on 250 construction project organizations in the UK, which was followed by face-to-face interviews with experienced practitioners from 15 of these organizations. The common factors that inhibit both time and cost control during construction projects were first identified. Subsequently 90 mitigating measures have been developed for the top five leading inhibiting factors—design changes, risks/uncertainties, inaccurate evaluation of project time/duration, complexities and non-performance of subcontractors were recommended. These mitigating measures were classified as: preventive, predictive, corrective and organizational measures. They can be used as a checklist of good practice and help project managers to improve the effectiveness of control of their projects.
Resumo:
Determining an appropriate research methodology is considered as an important element in a research study; especially in a doctoral research study. It involves approach to the entire process of a research study, starting from theoretical underpinnings and spanning to data collection and analysis, and extending to developing the solutions for the problems investigated. Research methodology in essence is focused around the problems to be investigated in a research study and therefore varies according to the problems investigated. Thus, identifying the research methodology that best suits a research in hand is important, not only as it will benefit achieving the set objectives of a research, but also as it will serve establishing the credibility of the work. Research philosophy, approach, strategy, choice, and techniques are inherent components of the methodology. Research strategy provides the overall direction of the research including the process by which the research is conducted. Case study, experiment, survey, action research, grounded theory and ethnography are examples for such research strategies. Case study is documented as an empirical inquiry that investigates a contemporary phenomenon within its real-life context, especially when the boundaries between phenomenon and context are not clearly evident. Case study was adopted as the overarching research strategy, in a doctoral study developed to investigate the resilience of construction Small and Medium-sized Enterprises (SMEs) in the UK to extreme weather events. The research sought to investigate how construction SMEs are affected by EWEs, respond to the risk of EWEs, and means of enhancing their resilience to future EWEs. It is argued that utilising case study strategy will benefit the research study, in achieving the set objectives of the research and answering the research questions raised, by comparing and contrasting with the alternative strategies available. It is also claimed that the selected strategy will contribute towards addressing the call for improved methodological pluralism in construction management research, enhancing the understanding of complex network of relationships pertinent to the industry and the phenomenon being studied.
Resumo:
Purpose – The UK experienced a number of Extreme Weather Events (EWEs) during recent years and a significant number of businesses were affected as a result. With the intensity and frequency of weather extremes predicted in the future, enhancing the resilience of businesses, especially of Small and Medium-sized Enterprises (SMEs), who are considered as highly vulnerable, has become a necessity. However, little research has been undertaken on how construction SMEs respond to the risk of EWEs. In seeking to help address this dearth of research, this investigation sought to identify how construction SMEs were being affected by EWEs and the coping strategies being used. Design/methodology/approach – A mixed methods research design was adopted to elicit information from construction SMEs, involving a questionnaire survey and case study approach. Findings – Results indicate a lack of coping strategies among the construction SMEs studied. Where the coping strategies have been implemented, these were found to be extensions of their existing risk management strategies rather than radical measures specifically addressing EWEs. Research limitations/implications – The exploratory survey focused on the Greater London area and was limited to a relatively small sample size. This limitation is overcome by conducting detailed case studies utilising two SMEs whose projects were located in EWE prone localities. The mixed method research design adopted benefits the research by presenting more robust findings. Practical implications – A better way of integrating the potential of EWEs into the initial project planning stage is required by the SMEs. This could possibly be achieved through a better risk assessment model supported by better EWE prediction data. Originality/value – The paper provides an original contribution towards the overarching agenda of resilience of SMEs and policy making in the area of EWE risk management. It informs both policy makers and practitioners on issues of planning and preparedness against EWEs.
Resumo:
Determining an appropriate research methodology is considered as an important element in a research study; especially in a doctoral research study. It involves approach to the entire process of a research study, starting from theoretical underpinnings and spanning to data collection and analysis, and extending to developing the solutions for the problems investigated. Research methodology in essence is focused around the problems to be investigated in a research study and therefore varies according to the problems investigated. Thus, identifying the research methodology that best suits a research in hand is important, not only as it will benefit achieving the set objectives of a research, but also as it will serve establishing the credibility of the work. Research philosophy, approach, strategy, choice, and techniques are inherent components of the methodology. Research strategy provides the overall direction of the research including the process by which the research is conducted. Case study, experiment, survey, action research, grounded theory and ethnography are examples for such research strategies. Case study is documented as an empirical inquiry that investigates a contemporary phenomenon within its real-life context, especially when the boundaries between phenomenon and context are not clearly evident. Case study was adopted as the overarching research strategy, in a doctoral study developed to investigate the resilience of construction Small and Medium-sized Enterprises (SMEs) in the UK to extreme weather events. The research sought to investigate how construction SMEs are affected by EWEs, respond to the risk of EWEs, and means of enhancing their resilience to future EWEs. It is argued that utilising case study strategy will benefit the research study, in achieving the set objectives of the research and answering the research questions raised, by comparing and contrasting with the alternative strategies available. It is also claimed that the selected strategy will contribute towards addressing the call for improved methodological pluralism in construction management research, enhancing the understanding of complex network of relationships pertinent to the industry and the phenomenon being studied.
Resumo:
The aim of this study is to address the main deficiencies with the prevailing project cost and time control practices for construction projects in the UK. A questionnaire survey was carried out with 250 top companies followed by in-depth interviews with 15 experienced practitioners from these companies in order to gain further insights of the identified problems, and their experience of good practice on how these problems can be tackled. On the basis of these interviews and syntheses with literature, a list of 65 good practice recommendations have been developed for the key project control tasks: planning, monitoring, reporting and analysing. The Delphi method was then used, with the participation of a panel of 8 practitioner experts, to evaluate these improvement recommendations and to establish their degree of relevance. After two rounds of Delphi, these recommendations are put forward as "critical", "important", or "helpful" measures for improving project control practice.
Resumo:
This study was geared at assessing the employability skills provision within a construction project management degree programme through a questionnaire survey. Students were required to assess their level of ability in relation to the most common skills and competencies most sought after by construction project management graduate employers. The study identified team-working ability as the most sought after skill by the employers investigated followed by verbal communication, written communication and leadership ability. It was found that students were very confident of their ability in 12 of the 14 identified skills and competencies. But ironically, leadership, an important skill sought by employers is one that majority of the students felt most insecure in their ability. The study concludes that the BSc programme equips students with these employability skills and competencies, but more effort is needed to make the leadership development opportunities in the programme more conspicuous. With recommendations on how to achieve this proffered.