49 resultados para supply lead time

em Aston University Research Archive


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The research, which was given the terms of reference, "To cut the lead time for getting new products into volume production", was sponsored by a company which develops and manufactures telecommunications equipment. The research described was based on studies made of the development of two processors which were designed to control telephone exchanges in the public network. It was shown that for each of these products, which were large electronic systems containing both hardware and software, most of their lead time was taken up with development. About half of this time was consumed by activities associated with redesign resulting from changes found to be necessary after the original design had been built. Analysing the causes of design changes showed the most significant to be Design Faults. The reasons why these predominated were investigated by seeking the collective opinion from design staff and their management using a questionnaire. Using the results from these studies to build upon the works of other authors, a model of the development process of large hierarchical systems is derived. An important feature of this model is its representation of iterative loops due to design changes. In order to reduce the development time, two closely related philosophies are proposed: By spending more time at the early stages of development (detecting and remedying faults in the design) even greater savings can be made later on, The collective performance of the development organisation would be improved by increasing the amount and speed of feedback about that performance. A trial was performed to test these philosophies using readily available techniques for design verification. It showed that about an 11 per cent saving would be made on the development time and that the philosophies might be equally successfully applied to other products and techniques.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The amplification of demand variation up a supply chain widely termed ‘the Bullwhip Effect’ is disruptive, costly and something that supply chain management generally seeks to minimise. Originally attributed to poor system design; deficiencies in policies, organisation structure and delays in material and information flow all lead to sub-optimal reorder point calculation. It has since been attributed to exogenous random factors such as: uncertainties in demand, supply and distribution lead time but these causes are not exclusive as academic and operational studies since have shown that orders and/or inventories can exhibit significant variability even if customer demand and lead time are deterministic. This increase in the range of possible causes of dynamic behaviour indicates that our understanding of the phenomenon is far from complete. One possible, yet previously unexplored, factor that may influence dynamic behaviour in supply chains is the application and operation of supply chain performance measures. Organisations monitoring and responding to their adopted key performance metrics will make operational changes and this action may influence the level of dynamics within the supply chain, possibly degrading the performance of the very system they were intended to measure. In order to explore this a plausible abstraction of the operational responses to the Supply Chain Council’s SCOR® (Supply Chain Operations Reference) model was incorporated into a classic Beer Game distribution representation, using the dynamic discrete event simulation software Simul8. During the simulation the five SCOR Supply Chain Performance Attributes: Reliability, Responsiveness, Flexibility, Cost and Utilisation were continuously monitored and compared to established targets. Operational adjustments to the; reorder point, transportation modes and production capacity (where appropriate) for three independent supply chain roles were made and the degree of dynamic behaviour in the Supply Chain measured, using the ratio of the standard deviation of upstream demand relative to the standard deviation of the downstream demand. Factors employed to build the detailed model include: variable retail demand, order transmission, transportation delays, production delays, capacity constraints demand multipliers and demand averaging periods. Five dimensions of supply chain performance were monitored independently in three autonomous supply chain roles and operational settings adjusted accordingly. Uniqueness of this research stems from the application of the five SCOR performance attributes with modelled operational responses in a dynamic discrete event simulation model. This project makes its primary contribution to knowledge by measuring the impact, on supply chain dynamics, of applying a representative performance measurement system.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Discusses the necessity for the conscious recognition of the phenomenon known as the extended enterprise; this demands that product, process and supply chain design are all considered simultaneously. Structure must be given to the extended enterprise in order to understand and manage it efficaciously. The authors discuss multiple perspectives for doing this, and employ the notions of “3-dimensional concurrent engineering” and “holonic thinking” for conceiving what the structure may look like. Describes a current “action research” project that is investigating potential lead-time reductions within an extended enterprise’s product introduction process. This aims to produce process visualisations, a framework for structuring and sychronising phases and stage-gates within the extended enterprise, and a new simulation tool which will provide a synthetic distributed hypermedia network. These deliverables will be used to play strategic “games” to explore problem issues within the product introduction process that belongs to the extended enterprise, develop teamwork across autonomous companies, and ultimately, contribute to the design of future extended enterprise supply chains.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This thesis describes an investigation by the author into the spares operation of compare BroomWade Ltd. Whilst the complete system, including the warehousing and distribution functions, was investigated, the thesis concentrates on the provisioning aspect of the spares supply problem. Analysis of the historical data showed the presence of significant fluctuations in all the measures of system performance. Two Industrial Dynamics simulation models were developed to study this phenomena. The models showed that any fluctuation in end customer demand would be amplified as it passed through the distributor and warehouse stock control systems. The evidence from the historical data available supported this view of the system's operation. The models were utilised to determine which parts of the total system could be expected to exert a critical influence on its performance. The lead time parameters of the supply sector were found to be critical and further study showed that the manner in which the lead time changed with work in progress levels was also an important factor. The problem therefore resolved into the design of a spares manufacturing system. Which exhibited the appropriate dynamic performance characteristics. The gross level of entity presentation, inherent in the Industrial Dynamics methodology, was found to limit the value of these models in the development of detail design proposals. Accordingly, an interacting job shop simulation package was developed to allow detailed evaluation of organisational factors on the performance characteristics of a manufacturing system. The package was used to develop a design for a pilot spares production unit. The need for a manufacturing system to perform successfully under conditions of fluctuating demand is not limited to the spares field. Thus, although the spares exercise provides an example of the approach, the concepts and techniques developed can be considered to have broad application throughout batch manufacturing industry.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This paper explores demand and production management challenges in the food processing industry. The goal is to identify the main production planning constraints and secondly to explore how each of these constraints affects company’s performance in terms of costs and customer service level. A single case study methodology was preferred since it enabled the collection of in-depth data. Findings suggest that product shelf life, carcass utilization and production lead time are the main constraints affecting supply chain efficiency and hence, a single planning approach is not appropriate when different products have different technological and processing characteristics.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Cold roll forming of thin-walled sections is a very useful process in the sheet metal industry. However, the conventional method for the design and manufacture of form-rolls, the special tooling used in the cold roll forming process, is a very time consuming and skill demanding exercise. This thesis describes the establishment of a stand-alone minicomputer based CAD/CAM system for assisting the design and manufacture of form-rolls. The work was undertaken in collaboration with a leading manufacturer of thin-walled sections. A package of computer programs have been developed to provide computer aids for every aspect of work in form-roll design and manufacture. The programs have been successfully implemented, as an integrated CAD/CAM software system, on the ICL PERQ minicomputer with graphics facilities. Thus, the developed CAD/CAM system is a single-user workstation, with software facilities to help the user to perform the conventional roll design activities including the design of the finished section, the flower pattern, and the form-rolls. A roll editor program can then be used to modify, if required, the computer generated roll profiles. As far as manufacturing is concerned, a special-purpose roll machining program and postprocessor can be used in conjunction to generate the NC control part-programs for the production of form-rolls by NC turning. Graphics facilities have been incorporated into the CAD/CAM software programs to display drawings interactively on the computer screen throughout all stages of execution of the CAD/CAM software. It has been found that computerisation can shorten the lead time in all activities dealing with the design and manufacture of form-rolls, and small or medium size manufacturing companies can gain benefits from the CAD/CM! technology by developing, according to its own specification, a tailor-made CAD/CAM software system on a low cost minicomputer.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Conventional methods of form-roll design and manufacture for Cold Roll-Forming of thin-walled metal sections have been entirely manual, time consuming and prone to errors, resulting in inefficiency and high production costs. With the use of computers, lead time can be significantly improved, particularly for those aspects involving routine but tedious human decisions and actions. This thesis describes the development of computer aided tools for producing form-roll designs for NC manufacture in the CAD/CAM environment. The work was undertaken to modernise the existing activity of a company manufacturing thin-walled sections. The investigated areas of the activity, including the design and drafting of the finished section, the flower patterns, the 10 to 1 templates, and the rolls complete with pinch-difference surfaces, side-rolls and extension-contours, have been successfully computerised by software development . Data generated by the developed software can be further processed for roll manufacturing using NC lathes. The software has been specially designed for portability to facilitate its implementation on different computers. The Opening-Radii method of forming was introduced as a subsitute to the conventional method for better forming. Most of the essential aspects in roll design have been successfully incorporated in the software. With computerisation, extensive standardisation in existing roll design practices and the use of more reliable and scientifically-based methods have been achieved. Satisfactory and beneficial results have also been obtained by the company in using the software through a terminal linked to the University by a GPO line. Both lead time and productivity in roll design and manufacture have been significantly improved. It is therefore concluded that computerisation in the design of form-rolls for automation by software development is viable. The work also demonstrated the promising nature of the CAD/CAM approach.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Investment in transport infrastructure can be highly sensitive to uncertainty. The scale and lead time of strategic transport programmes are such that they require continuing policy support and accurate forecasting. Delay, cost escalation and abandonment of projects often result if these conditions are not present. In Part One the physical characteristics of infrastructure are identified as a major constraint on planning processes. The extent to which strategies and techniques acknowledge these constraints is examined. A simple simulation model is developed to evaluate the effects on system development of variations in the scale and lead time of investments. In Part Two, two case studies of strategic infrastructure investment are analysed. The absence of a policy consensus for airport location was an important factor in the delayed resolution of the Third London Airport issue. In London itself, the traffic and environmental effects of major highway investment ultimately resulted in the abandonment of plans to construct urban motorways. In both cases, the infrastructure implications of alternative strategies are reviewed with reference to the problems of uncertainty. In conclusion, the scale of infrastructure investment is considered the most important of the constraints on the processes of transport planning. Adequate appraisal of such constraints may best be achieved by evaluation more closely aligned to policy objectives.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This thesis addresses data assimilation, which typically refers to the estimation of the state of a physical system given a model and observations, and its application to short-term precipitation forecasting. A general introduction to data assimilation is given, both from a deterministic and' stochastic point of view. Data assimilation algorithms are reviewed, in the static case (when no dynamics are involved), then in the dynamic case. A double experiment on two non-linear models, the Lorenz 63 and the Lorenz 96 models, is run and the comparative performance of the methods is discussed in terms of quality of the assimilation, robustness "in the non-linear regime and computational time. Following the general review and analysis, data assimilation is discussed in the particular context of very short-term rainfall forecasting (nowcasting) using radar images. An extended Bayesian precipitation nowcasting model is introduced. The model is stochastic in nature and relies on the spatial decomposition of the rainfall field into rain "cells". Radar observations are assimilated using a Variational Bayesian method in which the true posterior distribution of the parameters is approximated by a more tractable distribution. The motion of the cells is captured by a 20 Gaussian process. The model is tested on two precipitation events, the first dominated by convective showers, the second by precipitation fronts. Several deterministic and probabilistic validation methods are applied and the model is shown to retain reasonable prediction skill at up to 3 hours lead time. Extensions to the model are discussed.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

With new and emerging e-business technologies to transform business processes, it is important to understand how those technologies will affect the performance of a business. Will the overall business process be cheaper, faster and more accurate or will a sub-optimal change have been implemented? The use of simulation to model the behaviour of business processes is well established, and it has been applied to e-business processes to understand their performance in terms of measures such as lead-time, cost and responsiveness. This paper introduces the concept of simulation components that enable simulation models of e-business processes to be built quickly from generic e-business templates. The paper demonstrates how these components were devised, as well as the results from their application through case studies.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

A simulation model has been constructed of a valve manufacturing plant with the aim of assessing capacity requirements in response to a forecast increase in demand. The plant provides a weekly cycle of valves of varying types, based on a yearly production plan. Production control is provided by a just-in-time type system to minimise inventory. The simulation model investigates the effect on production lead time of a range of valve sequences into the plant. The study required the collection of information from a variety of sources, and a model that reflected the true capabilities of the production system. The simulation results convinced management that substantial changes were needed in order to meet demand. The case highlights the use of simulation in enabling a manager to quantify operational scenarios and thus provide a rational basis on which to take decisions on meeting performance criteria.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Inventory control in complex manufacturing environments encounters various sources of uncertainity and imprecision. This paper presents one fuzzy knowledge-based approach to solving the problem of order quantity determination, in the presence of uncertain demand, lead time and actual inventory level. Uncertain data are represented by fuzzy numbers, and vaguely defined relations between them are modeled by fuzzy if-then rules. The proposed representation and inference mechanism are verified using a large numbers of examples. The results of three representative cases are summarized. Finally a comparison between the developed fuzzy knowledge-based and traditional, probabilistic approaches is discussed.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Purpose - Enterprise resource planning (ERP) systems are limited due to their operation around a fixed design production process and a fixed lead time to production plan and purchasing plan. The purpose of this paper is to define the concept of informality and to describe the notion of a system combining informality and ERP systems, based on empirical research from four manufacturing case studies. Design/methodology/approach - The case studies present a range of applications of ERP and are analysed in terms of the three characteristics of informality, namely, organisation structure, communication method and leadership approach. Findings - The findings suggest that systems consisting of informality in combination with ERP systems can elicit knowledge fromfrontlineworkers leading to timely improvements in the system. This is achieved by allowing users to modify work procedures or production orders, and to support collaborative working among all employees. However it was found that informality is not required for manufacturers with a relatively stable environment who can deal with uncertainty with a proactive strategy. Research limitations/implications - This study was carried out in China, with four companies as unit of analysis. Future work can help to extend this study across countries. Originality/value - The use of Four dimensions of informality that relate to manufacturers implementing ERP are defined as "technology in practice", "user flexibility", "trusted human networks" and "positive reaction to uncertainty". This is a new construct not applied before to ERP implementations.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Despite recent research on time (e.g. Hedaa & Törnroos, 2001), consideration of the time dimension in data collection, analysis and interpretation in research in supply networks is, to date, still limited. Drawing on a body of literature from organization studies, and empirical findings from a six-year action research programme and a related study of network learning, we reflect on time, timing and timeliness in interorganizational networks. The empirical setting is supply networks in the English health sector wherein we identify and elaborate various issues of time, within the case and in terms of research process. Our analysis is wide-ranging and multi-level, from the global (e.g. identifying the notion of life cycles) to the particular (e.g. different cycle times in supply, such as daily for deliveries and yearly for contracts). We discuss the ‘speeding up’ of inter-organizational ‘e’ time and tensions with other time demands. In closing the paper, we relate our conclusions to the future conduct of the research programme and supply research more generally, and to the practice of managing supply (in) networks.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Purpose: This paper extends the use of Radio Frequency Identification (RFID) data for accounting of warehouse costs and services. Time Driven Activity Based Costing (TDABC) methodology is enhanced with the real-time collected RFID data about duration of warehouse activities. This allows warehouse managers to have accurate and instant calculations of costs. The RFID enhanced TDABC (RFID-TDABC) is proposed as a novel application of the RFID technology. Research Approach: Application of RFID-TDABC in a warehouse is implemented on warehouse processes of a case study company. Implementation covers receiving, put-away, order picking, and despatching. Findings and Originality: RFID technology is commonly used for the identification and tracking items. The use of the RFID generated information with the TDABC can be successfully extended to the area of costing. This RFID-TDABC costing model will benefit warehouse managers with accurate and instant calculations of costs. Research Impact: There are still unexplored benefits to RFID technology in its applications in warehousing and the wider supply chain. A multi-disciplinary research approach led to combining RFID technology and TDABC accounting method in order to propose RFID-TDABC. Combining methods and theories from different fields with RFID, may lead researchers to develop new techniques such as RFID-TDABC presented in this paper. Practical Impact: RFID-TDABC concept will be of value to practitioners by showing how warehouse costs can be accurately measured by using this approach. Providing better understanding of incurred costs may result in a further optimisation of warehousing operations, lowering costs of activities, and thus provide competitive pricing to customers. RFID-TDABC can be applied in a wider supply chain.