18 resultados para project environment

em Aston University Research Archive


Relevância:

70.00% 70.00%

Publicador:

Resumo:

The purpose of this paper is to investigate the reasons of social impacts of projects in developing countries despite of thorough impact assessment in appraisal phase of projects. A case study approach on a sewerage project in Barbados was undertaken using primary and secondary information. The study reveals that although the impact assessment report suggested appropriate mitigation measures, but they were not implemented by the contractors. The study suggests fostering an interconnected and symbiotic relationship between appraisal and implementation phases of a project in order to manage project environment. Additionally, a more vigilant and proactive supervisory role should be instituted and strengthened over time and adapted within the dictates of environmental needs. Copyright © 2005 Inderscience Enterprises Ltd.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Projects that are exposed to uncertain environments can be effectively controlled with the application of risk analysis during the planning stage. The Analytic Hierarchy Process, a multiattribute decision-making technique, can be used to analyse and assess project risks which are objective or subjective in nature. Among other advantages, the process logically integrates the various elements in the planning process. The results from risk analysis and activity analysis are then used to develop a logical contingency allowance for the project through the application of probability theory. The contingency allowance is created in two parts: (a) a technical contingency, and (b) a management contingency. This provides a basis for decision making in a changing project environment. Effective control of the project is made possible by the limitation of the changes within the monetary contingency allowance for the work package concerned, and the utilization of the contingency through proper appropriation. The whole methodology is applied to a pipeline-laying project in India, and its effectiveness in project control is demonstrated.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The evaluation and selection of industrial projects before investment decision is customarily done using marketing, technical and financial information. Subsequently, environmental impact assessment and social impact assessment are carried out mainly to satisfy the statutory agencies. Because of stricter environment regulations in developed and developing countries, quite often impact assessment suggests alternate sites, technologies, designs, and implementation methods as mitigating measures. This causes considerable delay to complete project feasibility analysis and selection as complete analysis requires to be taken up again and again till the statutory regulatory authority approves the project. Moreover, project analysis through above process often results sub-optimal project as financial analysis may eliminate better options, as more environment friendly alternative will always be cost intensive. In this circumstance, this study proposes a decision support system, which analyses projects with respect to market, technicalities, and social and environmental impact in an integrated framework using analytic hierarchy process, a multiple-attribute decision-making technique. This not only reduces duration of project evaluation and selection, but also helps select optimal project for the organization for sustainable development. The entire methodology has been applied to a cross-country oil pipeline project in India and its effectiveness has been demonstrated. © 2005 Elsevier B.V. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The evaluation and selection of industrial projects before investment decision is customarily done using marketing, technical, and financial information. Subsequently, environmental impact assessment and social impact assessment are carried out mainly to satisfy the statutory agencies. Because of stricter environment regulations in developed and developing countries, quite often impact assessment suggests alternate sites, technologies, designs, and implementation methods as mitigating measures. This causes considerable delay to complete project feasibility analysis and selection as complete analysis requires to be taken up again and again until the statutory regulatory authority approves the project. Moreover, project analysis through the above process often results in suboptimal projects as financial analysis may eliminate better options as more environment friendly alternative will always be cost intensive. In this circumstance, this study proposes a decision support system which analyses projects with respect to market, technicalities, and social and environmental impact in an integrated framework using analytic hierarchy process, a multiple attribute decision-making technique. This not only reduces duration of project evaluation and selection, but also helps select an optimal project for the organization for sustainable development. The entire methodology has been applied to a cross-country oil pipeline project in India and its effectiveness has been demonstrated. © 2008, IGI Global.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Effective management of projects is becoming increasingly important for any type of organization to remain competitive in today’s dynamic business environment due to pressure of globalization. The use of benchmarking is widening as a technique for supporting project management. Benchmarking can be described as the search for the best practices, leading to the superior performance of an organization. However, effectiveness of benchmarking depends on the use of tools for collecting and analyzing information and deriving subsequent improvement projects. This study demonstrates how analytic hierarchy process (AHP), a multiple attribute decision-making technique, can be used for benchmarking project management practices. The entire methodology has been applied to benchmark project management practice of Caribbean public sector organizations with organizations in the Indian petroleum sector, organizations in the infrastructure sector of Thailand and the UK. This study demonstrates the effectiveness of a proposed benchmarking model using AHP, determines problems and issues of Caribbean project management in the public sector and suggests improvement measures for effective project management.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Time, cost and quality achievements on large-scale construction projects are uncertain because of technological constraints, involvement of many stakeholders, long durations, large capital requirements and improper scope definitions. Projects that are exposed to such an uncertain environment can effectively be managed with the application of risk management throughout the project life cycle. Risk is by nature subjective. However, managing risk subjectively poses the danger of non-achievement of project goals. Moreover, risk analysis of the overall project also poses the danger of developing inappropriate responses. This article demonstrates a quantitative approach to construction risk management through an analytic hierarchy process (AHP) and decision tree analysis. The entire project is classified to form a few work packages. With the involvement of project stakeholders, risky work packages are identified. As all the risk factors are identified, their effects are quantified by determining probability (using AHP) and severity (guess estimate). Various alternative responses are generated, listing the cost implications of mitigating the quantified risks. The expected monetary values are derived for each alternative in a decision tree framework and subsequent probability analysis helps to make the right decision in managing risks. In this article, the entire methodology is explained by using a case application of a cross-country petroleum pipeline project in India. The case study demonstrates the project management effectiveness of using AHP and DTA.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Indian petroleum industry is passing through a very dynamic business environment due to the liberalisation of many government policies, vertical integration among organisations and the presence of multinational companies. This caused a competitive environment among the organisations in the Indian petroleum industry in the public sector. Effective project management for developing new infrastructures and maintaining the existing facilities has been considered one of the means for remaining competitive in this business environment. However, present project management practices suffer from many shortcomings, as time, cost and quality non-achievements are part and parcel of almost every project. This study focuses on identifying the issues in managing projects of the organisation in the Indian petroleum sector with the involvement of the executives in a workshop environment. This also suggests some remedial measures for resolving those issues through identifying critical success factors and enablers. The enablers not only resolve the present issues but also ensure superior performance. These are analysed in a quantitative framework to derive improvement measures in project management practices.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Healthcare professionals routinely deploy various quality management tools and techniques in order to improve performance of healthcare delivery. However, they are characterised by fragmented approach i.e., they are not linked with the strategic intent of the organisation. This study introduces a holistic quality improvement method, which integrates all quality improvement projects with the strategic intent of the healthcare organisations. It first identifies a healthcare system and its environment. The Strengths, Weaknesses, Opportunities and Threats (SWOT) of the system are then derived with the involvement of the concerned stakeholders. This leads to developing the strategies in order to satisfy customers in line with the organisation's competitive position. These strategies help identify a few projects, the implementation of which ensures achievement of desired quality. The projects are then prioritised with the involvement of the concerned stakeholders and implemented in order to improve the system performance. The effectiveness of the method has been demonstrated using a case study of an intensive care unit at the Eric Williams Medical Sciences Complex Hospital in Trinidad. Copyright © 2007 Inderscience Enterprises Ltd.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper describes a project aimed at assessing the experience of a virtual learning environment (VLE) among students studying courses in operations management. The project was supported by the Higher Education Funding Council for England (HEFCE) under its Teaching Quality Enhancement Fund (TQEF). The main aim of the project was through the use of a questionnaire to establish the student experience of using a VLE through an examination of the learning and technical features which they encountered. The study also examines the approaches to learning adopted by the students, through the inclusion of a shortened version of the approaches and study skills inventory for students (ASSIST) which the students were asked to complete.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The technique of remote sensing provides a unique view of the earth's surface and considerable areas can be surveyed in a short amount of time. The aim of this project was to evaluate whether remote sensing, particularly using the Airborne Thematic Mapper (ATM) with its wide spectral range, was capable of monitoring landfill sites within an urban environment with the aid of image processing and Geographical Information Systems (GIS) methods. The regions under study were in the West Midlands conurbation and consisted of a large area in what is locally known as the Black Country containing heavy industry intermingled with residential areas, and a large single active landfill in north Birmingham. When waste is collected in large volumes it decays and gives off pollutants. These pollutants, landfill gas and leachate (a liquid effluent), are known to be injurious to vegetation and can cause stress and death. Vegetation under stress can exhibit a physiological change, detectable by the remote sensing systems used. The chemical and biological reactions that create the pollutants are exothermic and the gas and leachate, if they leave the waste, can be warmer than their surroundings. Thermal imagery from the ATM (daylight and dawn) and thermal video were obtained and used to find thermal anomalies on the area under study. The results showed that vegetation stress is not a reliable indicator of landfill gas migration, as sites within an urban environment have a cover too complex for the effects to be identified. Gas emissions from two sites were successfully detected by all the thermal imagery with the thermal ATM being the best. Although the results were somewhat disappointing, recent technical advancements in the remote sensing systems used in this project would allow geo-registration of ATM imagery taken on different occasions and the elimination of the effects of solar insolation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper reports the evaluation of the effectiveness of incentives (viz. points and prizes) and of peer-group organisers ('older people's champions') in the outcomes of a health-improvement programme for people aged 50 + years in a multi-ethnic district of the West Midlands, England. Health promotion activities Were provided, and adherence, outcome variables and barriers to adherence were assessed over six months, using a `passport' format. Those aged in the fifties and of Asian origin Were under represented, but people of Afro-Caribbean origin were well represented and proportionately most likely to stay in the project. Those of greater age and With more illness were most likely to drop out. There were significant improvements in exercise, diet and the uptake of influenza vaccines and eyesight tests, but slighter improvements in wellbeing. Positive outcomes related to the incentives and to liking the format. The number of reported barriers was associated with lower involvement and lack of change, as was finding activities too difficult, the level of understanding, and transport and mobility problems, but when these were controlled, age did not predict involvement. Enjoying the scheme was related to positive changes, and this was associated with support from the older people's champions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The main purpose of the study is to develop an integrated framework for managing project risks by analyzing risk across project, work package and activity levels, and developing responses. Design/methodology/approach: The study first reviews the literature of various contemporary risk management frameworks in order to identify gaps in project risk management knowledge. Then it develops a conceptual risk management framework using combined analytic hierarchy process (AHP) and risk map for managing project risks. The proposed framework has then been applied to a 1500 km oil pipeline construction project in India in order to demonstrate its effectiveness. The concerned project stakeholders were involved through focus group discussions for applying the proposed risk management framework in the project under study. Findings: The combined AHP and risk map approach is very effective to manage project risks across project, work package and activity levels. The risk factors in project level are caused because of external forces such as business environment (e.g. customers, competitors, technological development, politics, socioeconomic environment). The risk factors in work package and activity levels are operational in nature and created due to internal causes such as lack of material and labor productivity, implementation issues, team ineffectiveness, etc. Practical implications: The suggested model can be applied to any complex project and helps manage risk throughout the project life cycle. Originality/value: Both business and operational risks constitute project risks. In one hand, the conventional project risk management frameworks emphasize on managing business risks and often ignore operational risks. On the other hand, the studies that deal with operational risk often do not link them with business risks. However, they need to be addressed in an integrated way as there are a few risks that affect only the specific level. Hence, this study bridges the gaps. © 2010 Elsevier B.V. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Teallach project has adapted model-based user-interface development techniques to the systematic creation of user-interfaces for object-oriented database applications. Model-based approaches aim to provide designers with a more principled approach to user-interface development using a variety of underlying models, and tools which manipulate these models. Here we present the results of the Teallach project, describing the tools developed and the flexible design method supported. Distinctive features of the Teallach system include provision of database-specific constructs, comprehensive facilities for relating the different models, and support for a flexible design method in which models can be constructed and related by designers in different orders and in different ways, to suit their particular design rationales. The system then creates the desired user-interface as an independent, fully functional Java application, with automatically generated help facilities.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Indian Petroleum Industry is passing through a very dynamic business environment due to liberalization. Effective project management for developing new infrastructures and maintaining the existing facilities has been considered as one of the means for remaining competitive but these practices suffer from many shortcomings, as time, cost and quality non-achievements are part and parcel of almost every project. This study focuses on identifying the specific causes of project failure by demonstrating first the characteristics of projects in Indian Petroleum industry and suggests some remedial measures for resolving these issues. The suggested project management model is integrated through information management system and demonstrated through a case study.