18 resultados para petroleum well planning
em Aston University Research Archive
Resumo:
Projects exposed to an uncertain environment must be adapted to deal with the effective integration of various planning elements and the optimization of project parameters. Time, cost, and quality are the prime objectives of a project that need to be optimized to fulfill the owner's goal. In an uncertain environment, there exist many other conflicting objectives that may also need to be optimized. These objectives are characterized by varying degrees of conflict. Moreover, an uncertain environment also causes several changes in the project plan throughout its life, demanding that the project plan be totally flexible. Goal programming (GP), a multiple criteria decision making technique, offers a good solution for this project planning problem. There the planning problem is considered from the owner's perspective, which leads to classifying the project up to the activity level. GP is applied separately at each level, and the formulated models are integrated through information flow. The flexibility and adaptability of the models lies in the ease of updating the model parameters at the required level through changing priorities and/or constraints and transmitting the information to other levels. The hierarchical model automatically provides integration among various element of planning. The proposed methodology is applied in this paper to plan a petroleum pipeline construction project, and its effectiveness is demonstrated.
Resumo:
A cross-country pipeline construction project is exposed to an uncertain environment due to its enormous size (physical, manpower requirement and financial value), complexity in design technology and involvement of external factors. These uncertainties can lead to several changes in project scope during the process of project execution. Unless the changes are properly controlled, the time, cost and quality goals of the project may never be achieved. A methodology is proposed for project control through risk analysis, contingency allocation and hierarchical planning models. Risk analysis is carried out through the analytic hierarchy process (AHP) due to the subjective nature of risks in construction projects. The results of risk analysis are used to determine the logical contingency for project control with the application of probability theory. Ultimate project control is carried out by hierarchical planning model which enables decision makers to take vital decisions during the changing environment of the construction period. Goal programming (GP), a multiple criteria decision-making technique, is proposed for model formulation because of its flexibility and priority-base structure. The project is planned hierarchically in three levels—project, work package and activity. GP is applied separately at each level. Decision variables of each model are different planning parameters of the project. In this study, models are formulated from the owner's perspective and its effectiveness in project control is demonstrated.
Resumo:
Projects that are exposed to uncertain environments can be effectively controlled with the application of risk analysis during the planning stage. The Analytic Hierarchy Process, a multiattribute decision-making technique, can be used to analyse and assess project risks which are objective or subjective in nature. Among other advantages, the process logically integrates the various elements in the planning process. The results from risk analysis and activity analysis are then used to develop a logical contingency allowance for the project through the application of probability theory. The contingency allowance is created in two parts: (a) a technical contingency, and (b) a management contingency. This provides a basis for decision making in a changing project environment. Effective control of the project is made possible by the limitation of the changes within the monetary contingency allowance for the work package concerned, and the utilization of the contingency through proper appropriation. The whole methodology is applied to a pipeline-laying project in India, and its effectiveness in project control is demonstrated.
Resumo:
Conventional project management techniques are not always sufficient for ensuring time, cost and quality achievement of large-scale construction projects due to complexity in planning and implementation processes. The main reasons for project non-achievement are changes in scope and design, changes in Government policies and regulations, unforeseen inflation) under-estimation and improper estimation. Projects that are exposed to such an uncertain environment can be effectively managed with the application of risk numagement throughout project life cycle. However, the effectiveness of risk management depends on the technique in which the effects of risk factors are analysed and! or quantified. This study proposes Analytic Hierarchy Process (AHP), a multiple attribute decision-making technique as a tool for risk analysis because it can handle subjective as well as objective factors in decision model that are conflicting in nature. This provides a decision support system (DSS) to project managenumt for making the right decision at the right time for ensuring project success in line with organisation policy, project objectives and competitive business environment. The whole methodology is explained through a case study of a cross-country petroleum pipeline project in India and its effectiveness in project1nana.gement is demonstrated.
Resumo:
Conventional project management techniques are not always sufficient to ensure time, cost and quality achievement of large-scale construction projects due to complexity in planning, design and implementation processes. The main reasons for project non-achievement are changes in scope and design, changes in government policies and regulations, unforeseen inflation, underestimation and improper estimation. Projects that are exposed to such an uncertain environment can be effectively managed with the application of risk management throughout the project's life cycle. However, the effectiveness of risk management depends on the technique through which the effects of risk factors are analysed/quantified. This study proposes the Analytic Hierarchy Process (AHP), a multiple attribute decision making technique, as a tool for risk analysis because it can handle subjective as well as objective factors in a decision model that are conflicting in nature. This provides a decision support system (DSS) to project management for making the right decision at the right time for ensuring project success in line with organisation policy, project objectives and a competitive business environment. The whole methodology is explained through a case application of a cross-country petroleum pipeline project in India and its effectiveness in project management is demonstrated.
Resumo:
Scenario Planning is a strategy tool with growing popularity in both academia and practical situations. Current practices in the teaching of scenario planning are largely based on existing literature which utilises scenario planning to develop strategies for the future, primarily considering the assessment of perceived macro-external environmental uncertainties. However there is a body of literature hitherto ignored by scenario planning researchers, which suggests that Perceived Environmental Uncertainty (PEU) influences micro-external or industrial environmental as well as the internal environment of the organisation. This paper provides a review of the most dominant theories on scenario planning process, demonstrates the need to consider PEU theory within scenario planning and presents how this can be done. The scope of this paper is to enhance the scenario planning process as a tool taught for Strategy Development. A case vignette is developed based on published scenarios to demonstrate the potential utilisation of the proposed process.
Resumo:
The majority of research on the pharmaceutical sector has focused on an overall micro economic, medical oriented welfare issues, whereas the marketing management role of the innovative drug manufacturer has to a large extent been disregarded. Using the case of Turkey, through a series of in-depth interviews with highly innovative companies, other marketing management possibilities to develop pricing strategies and plan for profit are explored based on broader definitions of value and transparency. Our results suggest that pharmaceutical companies as well as governments might have a too narrow focus of value and underestimate the potential long term benefits of a broader approach to marketing management and long term relationships between the various stakeholders.
Resumo:
The widespread implementation of Manufacturing Resource Planning (MRPII) systems in this country and abroad and the reported dissatisfaction with their use formed the initial basis of this piece of research which concentrates on the fundamental theory and design of the Closed Loop MRPII system itself. The dissertation concentrates on two key aspects namely; how Master Production Scheduling is carried out in differing business environments and how well the `closing of the loop' operates by checking the capcity requirements of the different levels of plans within an organisation. The main hypothesis which is tested is that in U.K. manufacturing industry, resource checks are either not being carried out satisfactorily or they are not being fed back to the appropriate plan in a timely fashion. The research methodology employed involved initial detailed investigations into Master Scheduling and capacity planning in eight diverse manufacturing companies. This was followed by a nationwide survey of users in 349 companies, a survey of all the major suppliers of Production Management software in the U.K. and an analysis of the facilities offered by current software packages. The main conclusion which is drawn is that the hypothesis is proved in the majority of companies in that only just over 50% of companies are attempting Resource and Capacity Planning and only 20% are successfully feeding back CRP information to `close the loop'. Various causative factors are put forward and remedies are suggested.
Resumo:
This thesis deals with the integration of the manpower criterion with the strategic decision making processes of technological projects in developing countries. This integration is to be achieved by ensuring the involvement of the actors, who have relevant roles and responsibilities along the whole life cycle of the project, in the strategic decision making phases of the project. The relevance of the actors is ascertained by the use of a responsibility index which relates their responsibility to the project's constituent stages. In the context of a technological project in a typical centrally-planned developing environment, the actors are identified as Arbiters, Planners, Implementors and Operators and their roles, concerns and objectives are derived. In this context, the actors are usually government and non-government organisations. Hence, decision making will involve multiple agencies as well as multiple criteria. A methodology covering the whole decision-making process, from options generation to options selection, and adopting Saaty's Analytical Hierarchy Process as an operational tool is proposed to deal with such multiple-criteria, multipleagency decision situations. The methodology is intended to integrate the consideration of the relevant criteria, the prevailing environmental and policy factors, and the concerns and objectives of the relevant actors into a unifying decision-making process which strives to facilitate enlightened decision making and to enhance learning and interaction. An extensive assessment of the methodology's feasibility, based on a specific technological project within the Iraqi oil industry is included, and indicates that the methodology should be both useful and implementable.
Resumo:
The research was carried out within a major public company. It sought to implement an approach to strategic planning which accounted for organisational values as well as employing a holistic value-free analysis of the firm and its environment. To this end, an 'ecological' model of the firm was formulated. A series of value-free strategic policies for its development were generated. These policies were validated by the company's top-management.They compared favourably with their own planning outcomes. The approach appeared to be diagnostically strong but lacked sufficient depth in the context of finding realistic corrective measures. However, feedback from the company showed it to be a useful complementary process to conventional procedures, in providing an explicitly different perspective. The research empirically evaluated the company's value-systems and their influence on strategy. It introduced the idea of an organisational 'self-concept' pre-determining the acceptability of various strategies.The values and the "self-concept' of the company were identified and validated, They appeared to have considerable influence on strategy. In addition, tho company's planning process within the decentralised structure was shown to be sub-optimal. This resulted from the variety of value systems maintained by different parts of the organisation. Proposals attempting to redress this situation were ofJered and several accepted. The study was postured as process-action research and the chosen perspective could be succinctly described as a 'worm's-eye view', akin to that of many real planners operating at some distance from the decision-making body. In this way, the normal strategic functionings of the firm and any changes resulting from the researcher's intervention were observed and recorded. Recurrent difficulties of the planning process resulting from the decentralised structure were identified. The overall procedure suggested as a result of the research aimed to increase the viabiIity of planning and the efficiency of the process. It is considered to be flexible enough to be applicable in a broader context.
Resumo:
This research project has developed a novel decision support system using Geographical Information Systems and Multi Criteria Decision Analysis and used it to develop and evaluate energy-from-waste policy options. The system was validated by applying it to the UK administrative areas of Cornwall and Warwickshire. Different strategies have been defined by the size and number of the facilities, as well as the technology chosen. Using sensitivity on the results from the decision support system, it was found that key decision criteria included those affected by cost, energy efficiency, transport impacts and air/dioxin emissions. The conclusions of this work are that distributed small-scale energy-from-waste facilities score most highly overall and that scale is more important than technology design in determining overall policy impact. This project makes its primary contribution to energy-from-waste planning by its development of a Decision Support System that can be used to assist waste disposal authorities to identify preferred energy-from-waste options that have been tailored specifically to the socio-geographic characteristics of their jurisdictional areas. The project also highlights the potential of energy-from-waste policies that are seldom given enough attention to in the UK, namely those of a smaller-scale and distributed nature that often have technology designed specifically to cater for this market.
Resumo:
This thesis looks at the construction of a strategic plan within a British university (Unico). After a change in leadership, the well-known strategic planning sequence was adopted to set directions according to Unico’s three Missions, followed by the development of respective goals and measures. The evolving strategic content coincided with the development of Unico’s strategic plan. I was able to follow Unico’s planning efforts over 10 months, from first planning meeting to completion of its strategic plan. The main data source provided non-participant observation (n = 25) and ten versions of Unico’s strategic plan. Additionally, seventy-six interviews were held with participants at various points. In order to examine the strategic plan’s construction, I reconceptualised strategic planning as a communicative process consisting of oral talk and written text. Through this interplay strategic planning activities come in to being. Such reconceptualisation provided a conceptual framework to study the in situ interactions without neglecting contextual characteristics embedding the communicative process. Strategic plans are currently seen as promoting inflexibility and reinforcing the institutional nature of formal strategic planning. Adopting dialogism, as advocated by Bakhtin and Ricoeur, this research provides novel insights into the dialogic of strategy talk and strategy text, such as a strategic plan. Findings illustrated that a strategic plan production cycle provided a meaning making platform for its participants. Through recurrently amending the plan, its content became increasingly specific while at the same time reflecting agreed terminology. This thesis offers an alternative view on strategic planning, elaborates on the strategy-as-practice perspective, focusing on the under-explored area of individuals’ interactions at the micro level, and elaborates on the dialogic of text and agency/conversation, distinguishing between talk and text.
Resumo:
The loss of habitat and biodiversity worldwide has led to considerable resources being spent for conservation purposes on actions such as the acquisition and management of land, the rehabilitation of degraded habitats, and the purchase of easements from private landowners. Prioritising these actions is challenging due to the complexity of the problem and because there can be multiple actors undertaking conservation actions, often with divergent or partially overlapping objectives. We use a modelling framework to explore this issue with a study involving two agents sequentially purchasing land for conservation. We apply our model to simulated data using distributions taken from real data to simulate the cost of patches and the rarity and co-occurence of species. In our model each agent attempted to implement a conservation network that met its target for the minimum cost using the conservation planning software Marxan. We examine three scenarios where the conservation targets of the agents differ. The first scenario (called NGO-NGO) models the situation where two NGOs are both are targeting different sets of threatened species. The second and third scenarios (called NGO-Gov and Gov-NGO, respectively) represent a case where a government agency attempts to implement a complementary conservation network representing all species, while an NGO is focused on achieving additional protection for the most endangered species. For each of these scenarios we examined three types of interactions between agents: i) acting in isolation where the agents are attempting to achieve their targets solely though their own actions ii) sharing information where each agent is aware of the species representation achieved within the other agent’s conservation network and, iii) pooling resources where agents combine their resources and undertake conservation actions as a single entity. The latter two interactions represent different types of collaborations and in each scenario we determine the cost savings from sharing information or pooling resources. In each case we examined the utility of these interactions from the viewpoint of the combined conservation network resulting from both agents' actions, as well as from each agent’s individual perspective. The costs for each agent to achieve their objectives varied depending on the order in which the agents acted, the type of interaction between agents, and the specific goals of each agent. There were significant cost savings from increased collaboration via sharing information in the NGO-NGO scenario were the agent’s representation goals were mutually exclusive (in terms of specie targeted). In the NGO-Gov and Gov-NGO scenarios, collaboration generated much smaller savings. If the two agents collaborate by pooling resources there are multiple ways the total cost could be shared between both agents. For each scenario we investigate the costs and benefits for all possible cost sharing proportions. We find that there are a range of cost sharing proportions where both agents can benefit in the NGO-NGO scenarios while the NGO-Gov and Gov-NGO scenarios again showed little benefit. Although the model presented here has a range of simplifying assumptions, it demonstrates that the value of collaboration can vary significantly in different situations. In most cases, collaborating would have associated costs and these costs need to be weighed against the potential benefits from collaboration. The model demonstrates a method for determining the range of collaboration costs that would result in collaboration providing an efficient use of scarce conservation resources.
Resumo:
The majority of research on the pharmaceutical sector has focused on an overall micro economic, medical oriented welfare issues, whereas the marketing management role of the innovative drug manufacturer has to a large extent been disregarded. Using the case of Turkey, through a series of in-depth interviews with highly innovative companies, other marketing management possibilities are explored based on broader definitions of value and transparency. Our results suggest that pharmaceutical companies as well as the government might have a too narrow focus of value and underestimate the potential long term benefits of a broader approach to marketing management and long term relationships between the various stakeholders.
Resumo:
Scenarioplanning is a strategy tool with growing popularity in both academia and practical situations. Current practices of scenarioplanning are largely based on existing literature which utilises scenarioplanning to develop strategies for the future, primarily considering the assessment of perceived macro-external environmentaluncertainties. However there is a body of literature hitherto ignored by scenarioplanning researchers, which suggests that PerceivedEnvironmentalUncertainty (PEU) influences the micro-external as well as the internal environment of the organisation. This paper reviews the most dominant theories on scenarioplanning process and PEU, developing three propositions for the practice of scenarioplanning process. Furthermore, it shows how these propositions can be integrated in the scenarioplanning process in order to improve the development of strategy.