3 resultados para methodist mission
em Aston University Research Archive
Resumo:
This paper first analyses the Performance Related Pay (PRP) schemes developed from 1992/3 to 2002/3 in a large Business School in England and then the School’s mission and strategic objectives in that period. The PRP schemes changed to include more specific performance indicators and these were increasingly linked to the objectives. The School’s resources allocated to PRP increased from £44,000 in 1992/93 to £355,000 in 2002/3 and from 1.08% in 1995/96 to 2.37% of the School’s income in 2002/3. As well as examining the changing strategic objectives and PRP schemes, the paper charts the development of the School’s reputation and resources and the role which staff motivation via PRP played at different stages. The paper concludes that the PRP scheme was at its most effective when it was clearly linked with the School’s strategic objectives, but that the relationship between objectives and motivation may be more complex than apparent from this study. Although the PRP scheme under consideration also applies to academic related staff, this paper concentrates on the effect on academic staff.
Resumo:
Rework strategies that involve different checking points as well as rework times can be applied into reconfigurable manufacturing system (RMS) with certain constraints, and effective rework strategy can significantly improve the mission reliability of manufacturing process. The mission reliability of process is a measurement of production ability of RMS, which serves as an integrated performance indicator of the production process under specified technical constraints, including time, cost and quality. To quantitatively characterize the mission reliability and basic reliability of RMS under different rework strategies, rework model of RMS was established based on the method of Logistic regression. Firstly, the functional relationship between capability and work load of manufacturing process was studied through statistically analyzing a large number of historical data obtained in actual machining processes. Secondly, the output, mission reliability and unit cost in different rework paths were calculated and taken as the decision variables based on different input quantities and the rework model mentioned above. Thirdly, optimal rework strategies for different input quantities were determined by calculating the weighted decision values and analyzing advantages and disadvantages of each rework strategy. At last, case application were demonstrated to prove the efficiency of the proposed method.