4 resultados para manned and unmanned aircraft

em Aston University Research Archive


Relevância:

40.00% 40.00%

Publicador:

Resumo:

The simulation of a power system such as the More Electric Aircraft is a complex problem. There are conflicting requirements of the simulation, for example in order to reduce simulation run-times, power ratings that need to be established over long periods of the flight can be calculated using a fairly coarse model, whereas power quality is established over relatively short periods with a detailed model. An important issue is to establish the requirements of the simulation work at an early stage. This paper describes the modelling and simulation strategy adopted for the UK TIMES project, which is looking into the optimisation of the More Electric Aircraft from a system level. Essentially four main requirements of the simulation work have been identified, resulting in four different types of simulation. Each of the simulations is described along with preliminary models and results.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

A status report of the modelling and simulation work that is being undertaken as part of the TIMES (Totally Integrated More Electric Systems) project is presented. Dynamic power quality simulations have been used to asses the performance of the electrical system of a EMA based actuation system for an Airbus A330 size aircraft, for both low voltage 115 V, and high voltage 230 V three-phase AC systems. The high voltage system is shown to have benefits in terms of power quality and reduced size and weight of equipment.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Discrepancies of materials, tools, and factory environments, as well as human intervention, make variation an integral part of the manufacturing process of any component. In particular, the assembly of large volume, aerospace parts is an area where significant levels of form and dimensional variation are encountered. Corrective actions can usually be taken to reduce the defects, when the sources and levels of variation are known. For the unknown dimensional and form variations, a tolerancing strategy is typically put in place in order to minimize the effects of production inconsistencies related to geometric dimensions. This generates a challenging problem for the automation of the corresponding manufacturing and assembly processes. Metrology is becoming a major contributor to being able to predict, in real time, the automated assembly problems related to the dimensional variation of parts and assemblies. This is done by continuously measuring dimensions and coordinate points, focusing on the product's key characteristics. In this paper, a number of metrology focused activities for large-volume aerospace products, including their implementation and application in the automation of manufacturing and assembly processes, are reviewed. This is done by using a case study approach within the assembly of large-volume aircraft wing structures.