46 resultados para limited power supply

em Aston University Research Archive


Relevância:

100.00% 100.00%

Publicador:

Resumo:

For many decades, the Kingdom of Saudi Arabia has been widely known for being a reliable oil exporter. This fact, however, has not exempted it from facing significant domestic energy challenges. One of the most pressing of these challenges involves bridging the widening electricity supply-demand gap where, currently, the demand is growing at a very fast rate. One crucial means to address this challenge is through delivering power supply projects with maximum efficiency. Project delivery delay, however, is not uncommon in this highly capital-intensive industry, indicating electricity supplies are not coping with the demand increases. To provide a deeper insight into the challenges of project implementation and efficient practice, this research adopts a pragmatic approach by triangulating literature, questionnaires and semi-structured interviews. The research was conducted in the Saudi Arabian power supply industry – Western Operating Area. A total of 105 usable questionnaires were collected, and 28 recorded, semi-structured interviews were conducted, analysed and synthesised to produce a conceptual model of what constitutes the project implementation challenges in the investigated industry. This was achieved by conducting a comprehensive ranking analysis applied to all 58 identified and surveyed factors which, according to project practitioners in the investigated industry, contribute to project delay. 28 of these project delay factors were selected as the "most important" ones. Factor Analysis was employed to structure these 28 most important project delay factors into the following meaningful set of 7 project implementation challenges: Saudi Electricity Company's contractual commitments, Saudi Electricity Company's communication and coordination effectiveness, contractors' project planning and project control effectiveness, consultant-related aspects, manpower challenges and material uncertainties, Saudi Electricity Company's tendering system, and lack of project requirements clarity. The study has implications for industry policy in that it provides a coherent assessment of the key project stakeholders' central problems. From this analysis, pragmatic recommendations are proposed that, if enacted, will minimise the significance of the identified problems on future project outcomes, thus helping to ensure the electricity supply-demand gap is diminished.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

A single-stage, three-phase AC-to-DC converter topology is proposed for high-frequency power supply applications. The principal features of the circuit include continuous current operation of the three AC input inductors, inherent shaping of the input currents, resulting in high power factor, a transformer isolated output, and only two active devices are required, both soft-switched. Resonant conversion techniques are used, and a high power factor is achieved by injecting high-frequency currents into the three-phase rectifier, producing a high frequency modulation of the rectifier input voltages. The current injection principle is explained and the system operation is confirmed by a combination of simulation and experimental results.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Ad hoc wireless sensor networks (WSNs) are formed from self-organising configurations of distributed, energy constrained, autonomous sensor nodes. The service lifetime of such sensor nodes depends on the power supply and the energy consumption, which is typically dominated by the communication subsystem. One of the key challenges in unlocking the potential of such data gathering sensor networks is conserving energy so as to maximize their post deployment active lifetime. This thesis described the research carried on the continual development of the novel energy efficient Optimised grids algorithm that increases the WSNs lifetime and improves on the QoS parameters yielding higher throughput, lower latency and jitter for next generation of WSNs. Based on the range and traffic relationship the novel Optimised grids algorithm provides a robust traffic dependent energy efficient grid size that minimises the cluster head energy consumption in each grid and balances the energy use throughout the network. Efficient spatial reusability allows the novel Optimised grids algorithm improves on network QoS parameters. The most important advantage of this model is that it can be applied to all one and two dimensional traffic scenarios where the traffic load may fluctuate due to sensor activities. During traffic fluctuations the novel Optimised grids algorithm can be used to re-optimise the wireless sensor network to bring further benefits in energy reduction and improvement in QoS parameters. As the idle energy becomes dominant at lower traffic loads, the new Sleep Optimised grids model incorporates the sleep energy and idle energy duty cycles that can be implemented to achieve further network lifetime gains in all wireless sensor network models. Another key advantage of the novel Optimised grids algorithm is that it can be implemented with existing energy saving protocols like GAF, LEACH, SMAC and TMAC to further enhance the network lifetimes and improve on QoS parameters. The novel Optimised grids algorithm does not interfere with these protocols, but creates an overlay to optimise the grids sizes and hence transmission range of wireless sensor nodes.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The development of reliable, high powered plasma generators has resulted in many plasma processes being proposed as alternatives to existing pyrometallurgical technologies. This work evaluates the advantages and disadvantages of plasma systems by reviewing plasma generators, their integration with reactors and the process economics. Many plasma systems were shown to be technically and economically superior to existing technologies, but some of the plasma system advantages quoted in the literature were found to be impractical because of other system constraints. Process applications were limited by the power inputs available from plasma generators compared to AC electric furnaces. A series of trials were conducted where chromite and steelplant baghouse dusts were smelted in the Tetronics' 2.0 MW transferred arc/open bath reactor to confirm the operating characteristics of the plasma system and its economics. Chromite smelting was technical superior to submerged arc furnace technology, but the economics were unfavourable because of the limited power available from the water-cooled plasma torch and the high electrical energy consumption. A DC graphite electrode plasma furnace using preheated and prereduced chromite concentrates will compete economically with the submerged arc furnace. Ni, Cr and Mo were economically recovered from high alloy content steelplant dusts for recycling. Five Electric Arc Furnace dusts were smelted to produce a non-toxic residue and recover the contained zinc to an enriched zinc oxide product for recycling. It should be possible to condense the zinc vapour directly in a zinc splash condenser to increase the value of the product. Because of the limited power available from plasma generators, plasma processes will be most suitable for treating high and medium value materials such as Au, Pt, Mo, Ni, Ti, V, Cr etc at small production rates, heating metals in tundishes and ladles and remelting superalloy scrap. The treatment of environmentally hazardous waste materials is a particularly interesting application because of the additional financial incentives. Non-transferred arc plasma generators will be used for air and gas preheating in blast furnaces to reduce metallurgical coke consumptions.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This work has concentrated on the testing of induction machines to determine their temperature rise at full-load without mechanically coupling to a load machine. The achievements of this work are outlined as follows. 1. Four distinct categories of mixed-frequency test using an inverter have been identified by the author. The simulation results of these tests as well as the conventional 2-supply test have been analysed in detail. 2. Experimental work on mixed-frequency tests has been done on a small (4 kW) squirrel cage induction machine using a voltage source PWM inverter. Two out of the four categories of test suggested have been tested and the temperature rise results were found to be similar to the results of a direct loading test. Further, one of the categories of test proposed has been performed on a 3.3 kW slip-ring induction machine for the conformation of the rotor values. 3. A low current supply mixed-frequency test-rig has been proposed. For this purpose, a resonant bank was connected to the DC link of the inverter in order to maintain the exchange of power between the test machine and the resonant bank instead of between the main supply and the test machine. The resonant bank was then replaced with a special electro-mechanical energy storage unit. The current of the main power supply was then reduced in amplitude. 4. A variable inertia test for full load temperature rise testing of induction machines has been introduced. This test is purely mechanical in nature and does not require any electrical connection of the test machine to any other machine. It has the advantage of drawing very little net power from the supply.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

For remote, semi-arid areas, brackish groundwater (BW) desalination powered by solar energy may serve as the most technically and economically viable means to alleviate the water stresses. For such systems, high recovery ratio is desired because of the technical and economical difficulties of concentrate management. It has been demonstrated that the current, conventional solar reverse osmosis (RO) desalination can be improved by 40–200 times by eliminating unnecessary energy losses. In this work, a batch-RO system that can be powered by a thermal Rankine cycle has been developed. By directly recycling high pressure concentrates and by using a linkage connection to provide increasing feed pressures, the batch-RO has been shown to achieve a 70% saving in energy consumption compared to a continuous single-stage RO system. Theoretical investigations on the mass transfer phenomena, including dispersion and concentration polarization, have been carried out to complement and to guide experimental efforts. The performance evaluation of the batch-RO system, named DesaLink, has been based on extensive experimental tests performed upon it. Operating DesaLink using compressed air as power supply under laboratory conditions, a freshwater production of approximately 300 litres per day was recorded with a concentration of around 350 ppm, whilst the feed water had a concentration range of 2500–4500 ppm; the corresponding linkage efficiency was around 40%. In the computational aspect, simulation models have been developed and validated for each of the subsystems of DesaLink, upon which an integrated model has been realised for the whole system. The models, both the subsystem ones and the integrated one, have been demonstrated to predict accurately the system performance under specific operational conditions. A simulation case study has been performed using the developed model. Simulation results indicate that the system can be expected to achieve a water production of 200 m3 per year by using a widely available evacuated tube solar collector having an area of only 2 m2. This freshwater production would satisfy the drinking water needs of 163 habitants in the Rajasthan region, the area for which the case study was performed.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper proposes an in situ diagnostic and prognostic (D&P) technology to monitor the health condition of insulated gate bipolar transistors (IGBTs) used in EVs with a focus on the IGBTs' solder layer fatigue. IGBTs' thermal impedance and the junction temperature can be used as health indicators for through-life condition monitoring (CM) where the terminal characteristics are measured and the devices' internal temperature-sensitive parameters are employed as temperature sensors to estimate the junction temperature. An auxiliary power supply unit, which can be converted from the battery's 12-V dc supply, provides power to the in situ test circuits and CM data can be stored in the on-board data-logger for further offline analysis. The proposed method is experimentally validated on the developed test circuitry and also compared with finite-element thermoelectrical simulation. The test results from thermal cycling are also compared with acoustic microscope and thermal images. The developed circuitry is proved to be effective to detect solder fatigue while each IGBT in the converter can be examined sequentially during red-light stopping or services. The D&P circuitry can utilize existing on-board hardware and be embedded in the IGBT's gate drive unit.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Purpose - To develop a systems strategy for supply chain management in aerospace maintenance, repair and overhaul (MRO). Design/methodology/approach - A standard systems development methodology has been followed to produce a process model (i.e. the AMSCR model); an information model (i.e. business rules) and a computerised information management capability (i.e. automated optimisation). Findings - The proof of concept for this web-based MRO supply chain system has been established through collaboration with a sample of the different types of supply chain members. The proven benefits comprise new potential to minimise the stock holding costs of the whole supply chain whilst also minimising non-flying time of the aircraft that the supply chain supports. Research limitations/implications - The scale of change needed to successfully model and automate the supply chain is vast. This research is a limited-scale experiment intended to show the power of process analysis and automation, coupled with strategic use of management science techniques, to derive tangible business benefit. Practical implications - This type of system is now vital in an industry that has continuously decreasing profit margins; which in turn means pressure to reduce servicing times and increase the mean time between them. Originality/value - Original work has been conducted at several levels: process, information and automation. The proof-of-concept system has been applied to an aircraft MRO supply chain. This is an area of research that has been neglected, and as a result is not well served by current systems solutions. © Emerald Group Publishing Limited.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Purpose: Short product life cycle and/or mass customization necessitate reconfiguration of operational enablers of supply chain (SC) from time to time in order to harness high levels of performance. The purpose of this paper is to identify the key operational enablers under stochastic environment on which practitioner should focus while reconfiguring a SC network. Design/methodology/approach: The paper used interpretive structural modeling (ISM) approach that presents a hierarchy-based model and the mutual relationships among the enablers. The contextual relationship needed for developing structural self-interaction matrix (SSIM) among various enablers is realized by conducting experiments through simulation of a hypothetical SC network. Findings: The research identifies various operational enablers having a high driving power towards assumed performance measures. In this regard, these enablers require maximum attention and of strategic importance while reconfiguring SC. Practical implications: ISM provides a useful tool to the SC managers to strategically adopt and focus on the key enablers which have comparatively greater potential in enhancing the SC performance under given operational settings. Originality/value: The present research realizes the importance of SC flexibility under the premise of reconfiguration of the operational units in order to harness high value of SC performance. Given the resulting digraph through ISM, the decision maker can focus the key enablers for effective reconfiguration. The study is one of the first efforts that develop contextual relations among operational enablers for SSIM matrix through integration of discrete event simulation to ISM. © Emerald Group Publishing Limited.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This study adopts a power perspective to investigate sustainable supply chain relationships and specifically uses resource-dependence theory (RDT) to critically analyze buyer-supplier-supplier relationships. Empirical evidence is provided, extending the RDT model in this context. The concept of power relationships is explored through a qualitative study of a multinational company and agricultural growers in the UK food industry that work together to implement sustainable practices. We look at multiple triadic relationships involving a large buyer and its small suppliers to investigate how relative power affects the implementation of sustainable supply-management practices. The study highlights that power as dependence is relevant to understanding compliance in sustainable supply chains and to identifying appropriate relationship-management strategies to build more sustainable supply chains. We show the influences of power on how players manage their relationships and how it affects organizational responses to the implementation of sustainability initiatives. Power notably influences the sharing of sustainability-related risks and value between supply chain partners. From a managerial perspective, the study contributes to developing a better understanding of how power can become an effective way to achieve sustainability goals. This article offers insights into the way in which a large organization works with small and medium size enterprises to implement sustainable practices and shows how power management-that is, the way in which power is used-can support or hinder effective cooperation around sustainability in the supply chain. © 2014 Decision Sciences Institute.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The availability of regular supply has been identified as one of the major stimulants for the growth and development of any nation and is thus important for the economic well-being of a nation. The problems of the Nigerian power sector stems from a lot of factors culminating in her slow developmental growth and inability to meet the power demands of her citizens regardless of the abundance of human and natural resources prevalent in the nation. The research therefore had the main aim of investigating the importance and contributions of risk management to the success of projects specific to the power sector. To achieve this aim it was pertinent to examine the efficacy of risk management process in practice and elucidate the various risks typically associated with projects (Construction, Contractual, Political, Financial, Design, Human resource and Environmental risk factors) in the power sector as well as determine the current situation of risk management practice in Nigeria. To address this factors inhibiting the proficiency of the overarching and prevailing issue which have only been subject to limited in-depth academic research, a rigorous mixed research method was adopted (quantitative and qualitative data analysis). A review of the Nigeria power sector was also carried out as a precursor to the data collection stage. Using purposive sampling technique, respondents were identified and a questionnaire survey was administered. The research hypotheses were tested using inferential statistics (Pearson correlation, Chi-square test, t-test and ANOVA technique) and the findings revealed the need for the development of a new risk management implementation Framework. The proposed Framework was tested within a company project, for interpreting the dynamism and essential benefits of risk management with the aim of improving the project performances (time), reducing the level of fragmentation (quality) and improving profitability (cost) within the Nigerian power sector in order to bridge a gap between theory and practice. It was concluded that Nigeria’s poor risk management practices have prevented it from experiencing strong growth and development. The study however, concludes that the successful implementation of the developed risk management framework may help it to attain this status by enabling it to become more prepared and flexible, to face challenges that previously led to project failures, and thus contributing to its prosperity. The research study provides an original contribution theoretically, methodologically and practically which adds to the project risk management body of knowledge and to the Nigerian power sector.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper develops and applies an integrated multiple criteria decision making approach to optimize the facility location-allocation problem in the contemporary customer-driven supply chain. Unlike the traditional optimization techniques, the proposed approach, combining the analytic hierarchy process (AHP) and the goal programming (GP) model, considers both quantitative and qualitative factors, and also aims at maximizing the benefits of deliverer and customers. In the integrated approach, the AHP is used first to determine the relative importance weightings or priorities of alternative locations with respect to both deliverer oriented and customer oriented criteria. Then, the GP model, incorporating the constraints of system, resource, and AHP priority is formulated to select the best locations for setting up the warehouses without exceeding the limited available resources. In this paper, a real case study is used to demonstrate how the integrated approach can be applied to deal with the facility location-allocation problem, and it is proved that the integrated approach outperforms the traditional costbased approach.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the last decade we have seen an exponential growth of functional imaging studies investigating multiple aspects of language processing. These studies have sparked an interest in applying some of the paradigms to various clinically relevant questions, such as the identification of the cortical regions mediating language function in surgical candidates for refractory epilepsy. Here we present data from a group of adult control participants in order to investigate the potential of using frequency specific spectral power changes in MEG activation patterns to establish lateralisation of language function using expressive language tasks. In addition, we report on a paediatric patient whose language function was assessed before and after a left hemisphere amygdalo-hippocampectomy. Our verb generation task produced left hemisphere decreases in beta-band power accompanied by right hemisphere increases in low beta-band power in the majority of the control group, a previously unreported phenomenon. This pattern of spectral power was also found in the patient's post-surgery data, though not her pre-surgery data. Comparison of pre and post-operative results also provided some evidence of reorganisation in language related cortex both inter- and intra-hemispherically following surgery. The differences were not limited to changes in localisation of language specific cortex but also changes in the spectral and temporal profile of frontal brain regions during verb generation. While further investigation is required to establish concordance with invasive measures, our data suggest that the methods described may serve as a reliable lateralisation marker for clinical assessment. Furthermore, our findings highlight the potential utility of MEG for the investigation of cortical language functioning in both healthy development and pathology.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Combined Heat and Power (CHP) is the simultaneous generation of usable heat and power in a single process. Despite its obvious advantages in terms of increased efficiency when compared to a single heat or power generation unit, there are a number of technical and economic reasons that have limited their selection. Biomass resources can be, and actually are used as fuel in CHP installations; however several hurdles have to be sorted beforehand, among the most important is the fact that biomass energy sources are not as energy intense as conventional CHP fuels. The ultimate outcome is a limited number of CHP units making use of biomass as fuel. Even fewer CHP units use bioliquids (e.g.: fast pyrolysis biomass liquids, biodiesel and vegetable oil). The Bioliquid-CHP project is carried out by a consortium of seven European and Russian complementary partners, funded by the EU and by the Federal Agency for Science and Innovation of the Russian Federation. The project aim is to develop microturbine and internal combustion engine adaptations in order to adjust these prime movers to bioliquids for CHP applications. This paper will show a summary of the current biomass CHP installations in the UK and the Netherlands, making reference to number of units, capacity, fuel used, the conversion technology involved and the preferred prime movers. The information will give an insight of the current market, with probable future trends and areas where growth could be expected. A similar paper describing the biomass CHP situation in Italy and Russia will be prepared in the near future.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Benchmarking techniques have evolved over the years since Xerox’s pioneering visits to Japan in the late 1970s. The focus of benchmarking has also shifted during this period. By tracing in detail the evolution of benchmarking in one specific area of business activity, supply and distribution management, as seen by the participants in that evolution, creates a picture of a movement from single function, cost-focused, competitive benchmarking, through cross-functional, cross-sectoral, value-oriented benchmarking to process benchmarking. As process efficiency and effectiveness become the primary foci of benchmarking activities, the measurement parameters used to benchmark performance converge with the factors used in business process modelling. The possibility is therefore emerging of modelling business processes and then feeding the models with actual data from benchmarking exercises. This would overcome the most common criticism of benchmarking, namely that it intrinsically lacks the ability to move beyond current best practice. In fact the combined power of modelling and benchmarking may prove to be the basic building block of informed business process re-engineering.