Resumo:
Purpose – This paper aims to investigate the manner in which technological innovation in the European electrical-grid sector has developed by focusing, in particular, on the effect of public policy on innovation. To achieve this aim, this paper highlights how technological innovation and development progressed from the 1960s to the 1980s, and contrasts this period with the deregulated/privatization environment. Design/methodology/approach – The paper is based on a series of in-depth multiple company case studies of grid companies, some of their suppliers and other actors in their broader business network. Empirical data were collected through 55 interviews. Findings – The authors find that a phase of mutual collaboration was encouraged in the first period, which led to strong technological innovation with a focus on product quality and the development of functionality. Buyers played a pivotal role in the development of products and posed technical requirements. In contrast, the current role of the buyer has transformed principally into one of evaluating competing bids for specific projects. Today, buyers face increasing pressure to substantially lower CO2 emissions and transform the energy grid system. These goals are difficult to achieve without a new way of thinking about innovation. Research limitations/implications – Models to achieve innovation must not only focus on individual research projects; instead, the innovation should be factored into normal business dealings in the supply chain. Practical implications – We propose that policymakers and regulators need to: accommodate for innovation and address the collaborative elements of innovation when developing policies and regulations. Furthermore, regulators have the option of either developing a strategic vision for the electrical-grid network or incorporating sustainability into the evaluation of electrical grids and, thus, consumers’ willingness to pay. Originality/value – This paper makes a distinctive contribution in the area of innovation for electrical grids. Our paper shows how innovation and the development of new technology for electrical grids changed over time. Furthermore, this paper describes the energy sector in terms of a business network comprising the different actors involved in innovation and development and, thus, their role in the energy supply chain.
Resumo:
In this paper we discuss how an innovative audio-visual project was adopted to foster active, rather than declarative learning, in critical International Relations (IR). First, we explore the aesthetic turn in IR, to contrast this with forms of representation that have dominated IR scholarship. Second, we describe how students were asked to record short audio or video projects to explore their own insights through aesthetic and non-written formats. Third, we explain how these projects are understood to be deeply embedded in social science methodologies. We cite our inspiration from applying a personal sociological imagination, as a way to counterbalance a ‘marketised’ slant in higher education, in a global economy where students are often encouraged to consume, rather than produce knowledge. Finally, we draw conclusions in terms of deeper forms of student engagement leading to new ways of thinking and presenting new skills and new connections between theory and practice.
Resumo:
There are several studies on managing risks in information technology (IT) projects. Most of the studies identify and prioritise risks through empirical research in order to suggest mitigating measures. Although they are important to clients for future projects, these studies fail to provide any framework for risk management from IT developers' perspective. Although a few studies introduced a framework of risk management in IT projects, most of them are presented from clients' perspectives and very little effort has been made to integrate this with the project management cycle. As IT developers absorb a considerable amount of risk, an integrated framework for managing risks in IT projects from developers' perspective is needed in order to ensure success in IT projects. The main objective of the paper is to develop a risk management framework for IT projects from the developers' perspective. This study uses a combined qualitative and quantitative technique with the active involvement of stakeholders in order to identify, analyse and respond to risks. The entire methodology has been explained using a case study on an information technology project in a public sector organisation in Barbados.
Resumo:
Conventionally, oil pipeline projects are evaluated thoroughly by the owner before investment decision is made using market, technical and financial analysis sequentially. The market analysis determines pipelines throughput and supply and demand points. Subsequent, technical analysis identifies technological options and economic and financial analysis then derives the least cost option among all technically feasible options. The subsequent impact assessment tries to justify the selected option by addressing environmental and social issues. The impact assessment often suggests alternative sites, technologies, and/or implementation methodology, necessitating revision of technical and financial analysis. This study addresses these issues via an integrated project evaluation and selection model. The model uses analytic hierarchy process, a multiple-attribute decision-making technique. The effectiveness of the model has been demonstrated through a case application on cross-country petroleum pipeline project in India.
Resumo:
Purpose - The purpose of the paper is to the identify risk factors, which affect oil and gas construction projects in Vietnam and derive risk responses. Design/methodology/approach - Questionnaire survey was conducted with the involvement of project executives of PetroVietnam and statistical analysis was carried out in order to identify the major project risks. Subsequently, mitigating measures were derived using informal interviews with the various levels of management of PetroVietnam. Findings - Bureaucratic government system and long project approval procedures, poor design, incompetence of project team, inadequate tendering practices, and late internal approval processes from the owner were identified as major risks. The executives suggested various strategies to mitigate the identified risks. Reforming the government system, effective partnership with foreign collaborators, training project executives, implementing contractor evaluation using multiple criteria decision-making technique, and enhancing authorities of project people were suggested as viable approaches. Practical implications - The improvement measures as derived in this study would improve chances of project success in the oil and gas industry in Vietnam. Originality/value - There are several risk management studies on managing projects in developing countries. However, as risk factors vary considerably across industry and countries, the study of risk management for successful projects in the oil and gas industry in Vietnam is unique and has tremendous importance for effective project management.
Resumo:
Construction projects are risky. A build-operate-transfer (BOT) project is recognised as one of the most risky project schemes. This scheme has been employed rather frequently in the past few decades, in both developed and developing countries. However, because of its risky nature, there have been failures as well as successes. Risk analysis in an appropriate way is desirable in implementing BOT projects. There are various tools and techniques applicable to risk analysis. The application of these risk analysis tools and techniques (RATTs) to BOT projects depends on an understanding of the contents and contexts of BOT projects, together with a thorough understanding of RATTs. This paper studies key points in their applications through reviews of relevant literatures and discusses the application of RATTs to BOT projects. The application to BOT projects is considered from the viewpoints of the major project participants, i.e. government, lenders and project companies. Discussion is also made with regard to political risks, which are very important in BOT projects. A flow chart has been introduced to select an appropriate tool for risk management in BOT projects. This study contributes to the establishment of a framework for systematic risk management in BOT projects.
Resumo:
Conventional project management techniques are not always sufficient to ensure time, cost and quality achievement of large-scale construction projects due to complexity in planning, design and implementation processes. The main reasons for project non-achievement are changes in scope and design, changes in government policies and regulations, unforeseen inflation, underestimation and improper estimation. Projects that are exposed to such an uncertain environment can be effectively managed with the application of risk management throughout the project's life cycle. However, the effectiveness of risk management depends on the technique through which the effects of risk factors are analysed/quantified. This study proposes the Analytic Hierarchy Process (AHP), a multiple attribute decision making technique, as a tool for risk analysis because it can handle subjective as well as objective factors in a decision model that are conflicting in nature. This provides a decision support system (DSS) to project management for making the right decision at the right time for ensuring project success in line with organisation policy, project objectives and a competitive business environment. The whole methodology is explained through a case application of a cross-country petroleum pipeline project in India and its effectiveness in project management is demonstrated.
Resumo:
The purpose of this study is to develop econometric models to better understand the economic factors affecting inbound tourist flows from each of six origin countries that contribute to Hong Kong’s international tourism demand. To this end, we test alternative cointegration and error correction approaches to examine the economic determinants of tourist flows to Hong Kong, and to produce accurate econometric forecasts of inbound tourism demand. Our empirical findings show that permanent income is the most significant determinant of tourism demand in all models. The variables of own price, weighted substitute prices, trade volume, the share price index (as an indicator of changes in wealth in origin countries), and a dummy variable representing the Beijing incident (1989) are also found to be important determinants for some origin countries. The average long-run income and own price elasticity was measured at 2.66 and – 1.02, respectively. It was hypothesised that permanent income is a better explanatory variable of long-haul tourism demand than current income. A novel approach (grid search process) has been used to empirically derive the weights to be attached to the lagged income variable for estimating permanent income. The results indicate that permanent income, estimated with empirically determined relatively small weighting factors, was capable of producing better results than the current income variable in explaining long-haul tourism demand. This finding suggests that the use of current income in previous empirical tourism demand studies may have produced inaccurate results. The share price index, as a measure of wealth, was also found to be significant in two models. Studies of tourism demand rarely include wealth as an explanatory forecasting long-haul tourism demand. However, finding a satisfactory proxy for wealth common to different countries is problematic. This study indicates with the ECM (Error Correction Models) based on the Engle-Granger (1987) approach produce more accurate forecasts than ECM based on Pesaran and Shin (1998) and Johansen (1988, 1991, 1995) approaches for all of the long-haul markets and Japan. Overall, ECM produce better forecasts than the OLS, ARIMA and NAÏVE models, indicating the superiority of the application of a cointegration approach for tourism demand forecasting. The results show that permanent income is the most important explanatory variable for tourism demand from all countries but there are substantial variations between countries with the long-run elasticity ranging between 1.1 for the U.S. and 5.3 for U.K. Price is the next most important variable with the long-run elasticities ranging between -0.8 for Japan and -1.3 for Germany and short-run elasticities ranging between – 0.14 for Germany and -0.7 for Taiwan. The fastest growing market is Mainland China. The findings have implications for policies and strategies on investment, marketing promotion and pricing.
Resumo:
This paper presents a study of engineering design groups that seeks to explain how knowing other participants can influence processes and outcomes in design projects. Research in this paper contributes a framework to approach understanding how interpersonal relationships influence group processes and outcomes. This acknowledges that engineering design is achieved through individuals working in groups. First a temporal perspective is introduced to understand how individuals (through interpersonal relationships), group processes and outcomes influence each other; secondly identity is presented as a theme to focus on how knowing other participants identity influences group processes and outcomes. Within this framework it is recognised that engineering design has different levels of complexity of which two aspects are considered: design type and design setting. These aspects place different demands on a project group and its members and this structure provides an opportunity for cross case analysis to generalise findings.
Resumo:
We present a novel differential phase shift keying receiver design under strong optical filtering. The receiver design is based on the different offset filtering performances of the output ports of the NRZ-DPSK Mach Zehnder Interferometer. The asymmetrical filtered receiver design can significantly increase performance by 2 dB in calculated Q for an OSNR of 15 dB.
Resumo:
Customer relationship management (CRM) implementation projects reflect a growing conceptual shift from the traditional engineering view of projects. Such projects are complex and risky because they call for both organisational and technological changes. This requires effective project management across various phases of the implementation process. However, few empirical researches have dealt with these project management issues. The aim of this research is to investigate how a “project team” manages CRM implementation projects successfully, across the different phases of the implementation process. We conducted an in-depth case study of the “Firm-Clients Branch” of a large telecommunications company in France. The findings show that, to manage CRM implementation projects successfully, an integrated and balanced approach is required. This involves appropriate system selection, effective process re-engineering and further development of organizational structures. We highlight the need for a “technochange approach” to achieve successful organisational transition and effective CRM implementation. The study reveals that the project team plays a central role throughout the implementation phases. Furthermore the effectiveness of technochange depends on project team performance, technology efficiency and close coordination with stakeholders.
Resumo:
Motivated by policy goals to develop international research capability and our experiences of collaborative research, we wanted to learn more about the factors that influence success in collaborative research. This article presents a review of the academic literature on collaborative research, focusing on multinational teams doing international comparative research. We address the question ‘what accounts for variation in process and performance of collaborative research projects?’, through 11 themes: context; vision; reward and commitment; leadership; structure; contract; task capability; sociability; communication; finance; rhythm and pace. We then propose an agenda for future research with an analytic framework and, finally, our conclusions.
Resumo:
Completing projects faster than the normal duration is always a challenge to the management of any project, as it often demands many paradigm shifts. Opportunities of globalization, competition from private sectors and multinationals force the management of public sector organizations in the Indian petroleum sector to take various aggressive strategies to maintain their profitability. Constructing infrastructure for handling petroleum products is one of them. Moreover, these projects are required to be completed in faster duration compared to normal schedules to remain competitive, to get faster return on investment, and to give longer project life. However, using conventional tools and techniques of project management, it is impossible to handle the problem of reducing the project duration from a normal period. This study proposes the use of concurrent engineering in managing projects for radically reducing project duration. The phases of the project are accomplished concurrently/simultaneously instead of in a series. The complexities that arise in managing projects are tackled through restructuring project organization, improving management commitment, strengthening project-planning activities, ensuring project quality, managing project risk objectively and integrating project activities through management information systems. These would not only ensure completion of projects in fast track, but also improve project effectiveness in terms of quality, cost effectiveness, team building, etc. and in turn overall productivity of the project organization would improve.
Resumo:
Time, cost and quality are the prime objectives of any project. Unfortunately, today’s project management does not always ensure the realisation of these objectives. The main reasons of project non-achievement are changes in scope and design, changes in Government policies and regulations, unforeseen inflation, under-estimation and mis-estimation. An overall organisational approach with the application of appropriate management philosophies, tools and techniques can only solve the problem. The present study establishes a methodology for achieving success in implementing projects using a business process re-engineering (BPR) framework. Internal performance characteristics are introspected through condition diagnosis that identifies and prioritises areas of concern requiring attention. Process re-engineering emerges as a most critical area for immediate attention. Project process re-engineering is carried out by eliminating non-value added activities, taking up activities concurrently by applying information systems rigorously and applying risk management techniques throughout the project life cycle. The overall methodology is demonstrated through applications to cross country petroleum pipeline project organisation in an Indian scenario.
Resumo:
It is a great pleasure to be Guest Editor for this issue – I hope that the papers which are included will be stimulating and support you in your ongoing research activities. A number of guiding principles were adopted in selecting the papers for inclusion in this issue. Firstly, the papers cover a wide range of logistics and supply chain management (SCM) topics. This is a reflection of the evolution of the field in recent years. In terms of the “buy-make-store-move-sell” model of SCM all the main constituent areas are addressed. Secondly, it is important that the conference issue of this Journal reflects the emphasis and content of the conference itself. I have tried to achieve this in terms of the papers included. One interesting point to note is that outsourcing is a theme which is a major issue in a number of papers. This reflects the increasing importance of this issue to organisations of all kinds and sizes. Economic globalisation and the trend towards vertical disintegration of supply chain architectures have sharpened the focus on outsourcing as a key element of supply chain strategy. The need to move beyond the notion that sourcing of certain activities can be some kind of panacea in evident from the relevant contributions. Thirdly, the LRN Annual Conference has become a more international event in recent years...the number of delegates and papers presented from outside the UK has continued to grow. The papers collected in this issue reflect this internationalization. Two papers are worthy of particular comment from an LRN perspective. The contribution by Jaafar and Rafiq has been developed from the submission which won the best paper prize at the LRN 2004 event. The paper by Pettit and Beresford is based on research which was supported by LRN seed corn funding. It was developed form the final report on this work submitted to CITL (UK) via the LRN. The seed corn funding is an important mechanism whereby the LRN supports research in innovative aspects of logistics in UK universities. In many ways, the LRN2004 event in Dublin seems like a long time ago. From my point of view it was one of the most professionally rewarding activities in which I have been involved in my career. It was a time to meet old friends and new and to keep abreast of the multitude of interesting projects being undertaken in over 20 countries. There are too many people to thank for the smooth running of the event. However, my colleague John Mee does warrant a special mention. His logistical skills were seriously put to the test in the weeks and months leading up to September 9th. 2004. I want to acknowledge his particular contribution to the success of the event. Since then we have had the 2005 event at the University of Plymouth. This was again a great opportunity to network with colleagues and many congratulations are due to John Dinwoodie and his team. We now look forward to LRN 2006 in Newcastle...form my part I hope and trust that this issue provides some useful perspectives and insights into the range of topics addressed.