3 resultados para flood requirements

em Aston University Research Archive


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Self-adaptation is emerging as an increasingly important capability for many applications, particularly those deployed in dynamically changing environments, such as ecosystem monitoring and disaster management. One key challenge posed by Dynamically Adaptive Systems (DASs) is the need to handle changes to the requirements and corresponding behavior of a DAS in response to varying environmental conditions. Berry et al. previously identified four levels of RE that should be performed for a DAS. In this paper, we propose the Levels of RE for Modeling that reify the original levels to describe RE modeling work done by DAS developers. Specifically, we identify four types of developers: the system developer, the adaptation scenario developer, the adaptation infrastructure developer, and the DAS research community. Each level corresponds to the work of a different type of developer to construct goal model(s) specifying their requirements. We then leverage the Levels of RE for Modeling to propose two complementary processes for performing RE for a DAS. We describe our experiences with applying this approach to GridStix, an adaptive flood warning system, deployed to monitor the River Ribble in Yorkshire, England.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – The UK has experienced a number of flood events in recent years, and the intensity and frequency of such events are forecast to further increase in future due to changing climatic conditions. Accordingly, enhancing the resilience of small and medium-sized enterprises (SMEs) – which form an important segment in a society – to flood risk, has emerged as an important issue. However, SMEs often tend to underestimate the risk of flooding which tends to have a low priority in their business agenda. The purpose of this paper is to undertake an investigation of adaptation to the risk of flooding considering community-level measures, individual-level property protection, and business continuity and resilience measures. Design/methodology/approach – A total of four short case studies were conducted among SMEs to identify their response to flood risk, and what measures have been undertaken to manage the risk of flooding. Findings – It was observed that SMEs have implemented different property-level protection measures and generic business continuity/risk management measures, based on their requirements, to achieve a desired level of protection. Practical implications – SMEs are likely to positively respond to property-level adaptation following a post-flood situation. It is important that information such as costs/benefits of such measures and different options available are made accessible to SMEs affected by a flood event. Social implications – Implementation of property-level adaptation measures will contribute towards the long term adaptation of the existing building stock to changing climatic conditions. Originality/value – The paper contributes towards policy making on flood risk adaptation and SME decision making, and informs policy makers and practitioners.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Recent policy changes in the UK encourage at-risk communities to learn to live with and adapt to flooding. Adaptation of individual properties by embracing resilient and resistant measures is an important aspect endorsed therein. Uptake of such protection measures by property owners, including that of Small and Medium-sized Enterprises (SMEs), has traditionally been low. A post-flood situation offers an opportunity to reinstate / reconstruct by integrating flood protection measures, in such a way that reduce damage and enhance the ability to recover in the event of a future flood incidence. In order to investigate the reinstatement / reconstruction experiences of flood affected SMEs, those affected by the 2009 Cockermouth flood event were studied. The results of a questionnaire survey revealed that many SMEs have opted for traditional reinstatement rather than resilient reinstatement. A detailed case study revealed requirements of getting the business back and running as soon as possible, a lack of guidance and advice from professionals and financial concerns as some of the barriers faced by SMEs. It is important that SMEs are provided with necessary guidance during the post-flood reinstatement stage, in order to make sure that the opportunity to build back better, integrating flood-protection measures is grasped by the SME owners. Stakeholders related to the construction industry, who are actively involved with post-flood reinstatement work, have an important role to play in this regard, providing necessary guidance and expertise to flooded SMEs.