11 resultados para electric variables measurement
em Aston University Research Archive
Resumo:
In this study, we developed a DEA-based performance measurement methodology that is consistent with performance assessment frameworks such as the Balanced Scorecard. The methodology developed in this paper takes into account the direct or inverse relationships that may exist among the dimensions of performance to construct appropriate production frontiers. The production frontiers we obtained are deemed appropriate as they consist solely of firms with desirable levels for all dimensions of performance. These levels should be at least equal to the critical values set by decision makers. The properties and advantages of our methodology against competing methodologies are presented through an application to a real-world case study from retail firms operating in the US. A comparative analysis between the new methodology and existing methodologies explains the failure of the existing approaches to define appropriate production frontiers when directly or inversely related dimensions of performance are present and to express the interrelationships between the dimensions of performance.
Resumo:
This paper explores the use of the optimisation procedures in SAS/OR software with application to the measurement of efficiency and productivity of decision-making units (DMUs) using data envelopment analysis (DEA) techniques. DEA was originally introduced by Charnes et al. [J. Oper. Res. 2 (1978) 429] is a linear programming method for assessing the efficiency and productivity of DMUs. Over the last two decades, DEA has gained considerable attention as a managerial tool for measuring performance of organisations and it has widely been used for assessing the efficiency of public and private sectors such as banks, airlines, hospitals, universities and manufactures. As a result, new applications with more variables and more complicated models are being introduced. Further to successive development of DEA a non-parametric productivity measure, Malmquist index, has been introduced by Fare et al. [J. Prod. Anal. 3 (1992) 85]. Employing Malmquist index, productivity growth can be decomposed into technical change and efficiency change. On the other hand, the SAS is a powerful software and it is capable of running various optimisation problems such as linear programming with all types of constraints. To facilitate the use of DEA and Malmquist index by SAS users, a SAS/MALM code was implemented in the SAS programming language. The SAS macro developed in this paper selects the chosen variables from a SAS data file and constructs sets of linear-programming models based on the selected DEA. An example is given to illustrate how one could use the code to measure the efficiency and productivity of organisations.
Resumo:
Purpose – To investigate the impact of performance measurement in strategic planning process. Design/methodology/approach – A large scale survey was conducted online with Warwick Business School alumni. The questionnaire was based on the Strategic Development Process model by Dyson. The questionnaire was designed to map the current practice of strategic planning and to determine its most influential factors on the effectiveness of the process. All questions were close ended and a seven-point Likert scale used. The independent variables were grouped into four meaningful factors by factor analysis (Varimax, coefficient of rotation 0.4). The factors produced were used to build regression models (stepwise) for the five assessments of strategic planning process. Regression models were developed for the totality of the responses, comparing SMEs and large organizations and comparing organizations operating in slowly and rapidly changing environments. Findings – The results indicate that performance measurement stands as one of the four main factors characterising the current practice of strategic planning. This research has determined that complexity coming from organizational size and rate of change in the sector creates variation in the impact of performance measurement in strategic planning. Large organizations and organizations operating in rapidly changing environments make greater use of performance measurement. Research limitations/implications – This research is based on subjective data, therefore the conclusions do not concern the impact of strategic planning process' elements on the organizational performance achievements, but on the success/effectiveness of the strategic planning process itself. Practical implications – This research raises a series of questions about the use and potential impact of performance measurement, especially in the categories of organizations that are not significantly influenced by its utilisation. It contributes to the field of performance measurement impact. Originality/value – This research fills in the gap literature concerning the lack of large scale surveys on strategic development processes and performance measurement. It also contributes in the literature of this field by providing empirical evidences on the impact of performance measurement upon the strategic planning process.
Resumo:
Cascaded multilevel inverters-based Static Var Generators (SVGs) are FACTS equipment introduced for active and reactive power flow control. They eliminate the need for zigzag transformers and give a fast response. However, with regard to their application for flicker reduction in using Electric Arc Furnace (EAF), the existing multilevel inverter-based SVGs suffer from the following disadvantages. (1) To control the reactive power, an off-line calculation of Modulation Index (MI) is required to adjust the SVG output voltage. This slows down the transient response to the changes of reactive power; and (2) Random active power exchange may cause unbalance to the voltage of the d.c. link (HBI) capacitor when the reactive power control is done by adjusting the power angle d alone. To resolve these problems, a mathematical model of 11-level cascaded SVG, was developed. A new control strategy involving both MI (modulation index) and power angle (d) is proposed. A selected harmonics elimination method (SHEM) is taken for switching pattern calculations. To shorten the response time and simplify the controls system, feed forward neural networks are used for on-line computation of the switching patterns instead of using look-up tables. The proposed controller updates the MI and switching patterns once each line-cycle according to the sampled reactive power Qs. Meanwhile, the remainder reactive power (compensated by the MI) and the reactive power variations during the line-cycle will be continuously compensated by adjusting the power angles, d. The scheme senses both variables MI and d, and takes action through the inverter switching angle, qi. As a result, the proposed SVG is expected to give a faster and more accurate response than present designs allow. In support of the proposal there is a mathematical model for reactive powered distribution and a sensitivity matrix for voltage regulation assessment, MATLAB simulation results are provided to validate the proposed schemes. The performance with non-linear time varying loads is analysed and refers to a general review of flicker, of methods for measuring flickers due to arc furnace and means for mitigation.
Resumo:
A mathematical model has been developed for predicting the spectral distribution of solar radiation incident on a horizontal surface. The solar spectrum in the wavelength range 0.29 to 4.0 micrometers has been divided in 144 intervals. Two variables in the model are the atmospheric water vapour content and atmospheric turbidity. After allowing for absorption and scattering in the atmosphere, the spectral intensity of direct and diffuse components of radiation are computed. When the predicted radiation levels are compared with the measured values for the total radiation and the values with glass filters RG715, RG630 and OG530, a close agreement (± 5%) has been achieved under clear sky conditions. A solar radiation measuring facility, close to the centre of Birmingham, has been set up utilising a microcomputer based data logging system. A suite of computer programs in the BASIC programming language has been developed and extensively tested for solar radiation data, logging, analysis and plotting. Two commonly used instruments, the Eppley PSP pyranometer and the Kipp and Zonen CM5 pyranometer, have been compared under different experimental conditions. Three models for computing the inclined plane irradiation, using total and diffuse radiation on a horizontal surface, have been tested for Birmingham. The anisotropic-alI-sky model, proposed by Klucher, provides a good agreement between the measured and the predicted radiation levels. Measurements of solar spectral distribution, using glass filters, are also reported for a number of inclines facing South.
Resumo:
The state of the art in productivity measurement and analysis shows a gap between simple methods having little relevance in practice and sophisticated mathematical theory which is unwieldy for strategic and tactical planning purposes, -particularly at company level. An extension is made in this thesis to the method of productivity measurement and analysis based on the concept of added value, appropriate to those companies in which the materials, bought-in parts and services change substantially and a number of plants and inter-related units are involved in providing components for final assembly. Reviews and comparisons of productivity measurement dealing with alternative indices and their problems have been made and appropriate solutions put forward to productivity analysis in general and the added value method in particular. Based on this concept and method, three kinds of computerised models two of them deterministic, called sensitivity analysis and deterministic appraisal, and the third one, stochastic, called risk simulation, have been developed to cope with the planning of productivity and productivity growth with reference to the changes in their component variables, ranging from a single value 'to• a class interval of values of a productivity distribution. The models are designed to be flexible and can be adjusted according to the available computer capacity expected accuracy and 'presentation of the output. The stochastic model is based on the assumption of statistical independence between individual variables and the existence of normality in their probability distributions. The component variables have been forecasted using polynomials of degree four. This model is tested by comparisons of its behaviour with that of mathematical model using real historical data from British Leyland, and the results were satisfactory within acceptable levels of accuracy. Modifications to the model and its statistical treatment have been made as required. The results of applying these measurements and planning models to the British motor vehicle manufacturing companies are presented and discussed.
Resumo:
Purpose – This paper aims to respond to John Rossiter's call for a “Marketing measurement revolution” in the current issue of EJM, as well as providing broader comment on Rossiter's C-OAR-SE framework, and measurement practice in marketing in general. Design/methodology/approach – The paper is purely theoretical, based on interpretation of measurement theory. Findings – The authors find that much of Rossiter's diagnosis of the problems facing measurement practice in marketing and social science is highly relevant. However, the authors find themselves opposed to the revolution advocated by Rossiter. Research limitations/implications – The paper presents a comment based on interpretation of measurement theory and observation of practices in marketing and social science. As such, the interpretation is itself open to disagreement. Practical implications – There are implications for those outside academia who wish to use measures derived from academic work as well as to derive their own measures of key marketing and other social variables. Originality/value – This paper is one of the few to explicitly respond to the C-OAR-SE framework proposed by Rossiter, and presents a number of points critical to good measurement theory and practice, which appear to remain underdeveloped in marketing and social science.
Resumo:
The rationale for carrying out this research was to address the clear lack of knowledge surrounding the measurement of public hospital performance in Ireland. The objectives of this research were to develop a comprehensive model for measuring hospital performance and using this model to measure the performance of public acute hospitals in Ireland in 2007. Having assessed the advantages and disadvantages of various measurement models the Data Envelopment Analysis (DEA) model was chosen for this research. DEA was initiated by Charnes, Cooper and Rhodes in 1978 and further developed by Fare et al. (1983) and Banker et al. (1984). The method used to choose relevant inputs and outputs to be included in the model followed that adopted by Casu et al. (2005) which included the use of focus groups. The main conclusions of the research are threefold. Firstly, it is clear that each stakeholder group has differing opinions on what constitutes good performance. It is therefore imperative that any performance measurement model would be designed within parameters that are clearly understood by any intended audience. Secondly, there is a lack of publicly available qualitative information in Ireland that inhibits detailed analysis of hospital performance. Thirdly, based on available qualitative and quantitative data the results indicated a high level of efficiency among the public acute hospitals in Ireland in their staffing and non pay costs, averaging 98.5%. As DEA scores are sensitive to the number of input and output variables as well as the size of the sample it should be borne in mind that a high level of efficiency could be as a result of using DEA with too many variables compared to the number of hospitals. No hospital was deemed to be scale efficient in any of the models even though the average scale efficiency for all of the hospitals was relatively high at 90.3%. Arising from this research the main recommendations would be that information on medical outcomes, survival rates and patient satisfaction should be made publicly available in Ireland; that despite a high average efficiency level that many individual hospitals need to focus on improving their technical and scale efficiencies, and that performance measurement models should be developed that would include more qualitative data.
Resumo:
Researchers often develop and test conceptual models containing formative variables. In many cases, these formative variables are specified as being endogenous. This article provides a clarification of formative variable theory, distinguishing between the formative latent variable and the formative composite variable. When an endogenous latent variable relies on formative indicators for measurement, empirical studies can say nothing about the relationship between exogenous variables and the endogenous formative latent variable: conclusions can only be drawn regarding the exogenous variables' relationships with a composite variable. The authors also show the dangers associated with developing theory about antecedents to endogenous formative variables at the (aggregate) formative latent variable level. Modeling relationships with endogenous formative variables at the (disaggregate) indicator level informs richer theory development, and encourages more precise empirical testing. When antecedents' relationships with endogenous formative variables are modeled at the formative latent variable level rather than the formative indicator level, theory construction can verge on the superficial, and empirical findings can be ambiguous in substantive meaning.
Resumo:
High precision manufacturers continuously seek out disruptive technologies to improve the quality, cost, and delivery of their products. With the advancement of machine tool and measurement technology many companies are ready to capitalise on the opportunity of on-machine measurement (OMM). Coupled with business case, manufacturing engineers are now questioning whether OMM can soon eliminate the need for post-process inspection systems. Metrologists will however argue that the machining environment is too hostile and that there are numerous process variables which need consideration before traceable measurement on-the-machine can be achieved. In this paper we test the measurement capability of five new multi-axis machine tools enabled as OMM systems via on-machine probing. All systems are tested under various operating conditions in order to better understand the effects of potentially significant variables. This investigation has found that key process variables such as machine tool warm-up and tool-change cycles can have an effect on machine tool measurement repeatability. New data presented here is important to many manufacturers whom are considering utilising their high precision multi-axis machine tools for both the creation and verification of their products.
Resumo:
This paper presents a diagnostic and prognostic condition monitoring method for insulated-gate bipolar transistor (IGBT) power modules for use primarily in electric vehicle applications. The wire-bond-related failure, one of the most commonly observed packaging failures, is investigated by analytical and experimental methods using the on-state voltage drop as a failure indicator. A sophisticated test bench is developed to generate and apply the required current/power pulses to the device under test. The proposed method is capable of detecting small changes in the failure indicators of the IGBTs and freewheeling diodes and its effectiveness is validated experimentally. The novelty of the work lies in the accurate online testing capacity for diagnostics and prognostics of the power module with a focus on the wire bonding faults, by injecting external currents into the power unit during the idle time. Test results show that the IGBT may sustain a loss of half the bond wires before the impending fault becomes catastrophic. The measurement circuitry can be embedded in the IGBT drive circuits and the measurements can be performed in situ when the electric vehicle stops in stop-and-go, red light traffic conditions, or during routine servicing.