9 resultados para ecosystem-based fisheries management
em Aston University Research Archive
Resumo:
Recent technological advances have paved the way for developing and offering advanced services for the stakeholders in the agricultural sector. A paradigm shift is underway from proprietary and monolithic tools to Internet-based, cloud hosted, open systems that will enable more effective collaboration between stakeholders. This new paradigm includes the technological support of application developers to create specialized services that will seamlessly interoperate, thus creating a sophisticated and customisable working environment for the end users. We present the implementation of an open architecture that instantiates such an approach, based on a set of domain independent software tools called "generic enablers" that have been developed in the context of the FI-WARE project. The implementation is used to validate a number of innovative concepts for the agricultural sector such as the notion of a services' market place and the system's adaptation to network failures. During the design and implementation phase, the system has been evaluated by end users, offering us valuable feedback. The results of the evaluation process validate the acceptance of such a system and the need of farmers to have access to sophisticated services at affordable prices. A summary of this evaluation process is also presented in this paper. © 2013 Elsevier B.V.
Resumo:
BACKGROUND: Brain stem death can elicit a potentially manipulable cardiotoxic proinflammatory cytokine response. We investigated the prevalence of this response, the impact of donor management with tri-iodothyronine (T3) and methylprednisolone (MP) administration, and the relationship of biomarkers to organ function and transplant suitability. METHODS: In a prospective randomized double-blinded factorially designed study of T3 and MP therapy, we measured serum levels of interleukin-1 and -6 (IL-1 and IL-6), tumor necrosis factor-alpha (TNF-alpha), C-reactive protein, and procalcitonin (PCT) levels in 79 potential heart or lung donors. Measurements were performed before and after 4 hr of algorithm-based donor management to optimize cardiorespiratory function and +/-hormone treatment. Donors were assigned to receive T3, MP, both drugs, or placebo. RESULTS: Initial IL-1 was elevated in 16% donors, IL-6 in 100%, TNF-alpha in 28%, CRP in 98%, and PCT in 87%. Overall biomarker concentrations did not change between initial and later measurements and neither T3 nor MP effected any change. Both PCT (P =0.02) and TNF-alpha (P =0.044) levels were higher in donor hearts with marginal hemodynamics at initial assessment. Higher PCT levels were related to worse cardiac index and right and left ventricular ejection fractions and a PCT level more than 2 ng x mL(-1) may attenuate any improvement in cardiac index gained by donor management. No differences were observed between initially marginal and nonmarginal donor lungs. A PCT level less than or equal to 2 ng x mL(-1) but not other biomarkers predicted transplant suitability following management. CONCLUSIONS: There is high prevalence of a proinflammatory environment in the organ donor that is not affected by tri-iodothyronine or MP therapy. High PCT and TNF-alpha levels are associated with donor heart dysfunction. (C) 2009 Lippincott Williams & Wilkins, Inc.
Resumo:
This report details an evaluation of the My Choice Weight Management Programme undertaken by a research team from the School of Pharmacy at Aston University. The My Choice Weight Management Programme is delivered through community pharmacies and general practitioners (GPs) contracted to provide services by the Heart of Birmingham teaching Primary Care Trust. It is designed to support individuals who are ‘ready to change’ by enabling the individual to work with a trained healthcare worker (for example, a healthcare assistant, practice nurse or pharmacy assistant) to develop a care plan designed to enable the individual to lose 5-10% of their current weight. The Programme aims to reduce adult obesity levels; improve access to overweight and obesity management services in primary care; improve diet and nutrition; promote healthy weight and increased levels of physical activity in overweight or obese patients; and support patients to make lifestyle changes to enable them to lose weight. The Programme is available for obese patients over 18 years old who have a Body Mass Index (BMI) greater than 30 kg/m2 (greater than 25 kg/m2 in Asian patients) or greater than 28 kg/m2 (greater than 23.5 kg/m2 in Asian patients) in patients with co-morbidities (diabetes, high blood pressure, cardiovascular disease). Each participant attends weekly consultations over a twelve session period (the final iteration of these weekly sessions is referred to as ‘session twelve’ in this report). They are then offered up to three follow up appointments for up to six months at two monthly intervals (the final of these follow ups, taking place at approximately nine months post recruitment, is referred to as ‘session fifteen’ in this report). A review of the literature highlights the dearth of published research on the effectiveness of primary care- or community-based weight management interventions. This report may help to address this knowledge deficit. A total of 451 individuals were recruited on to the My Choice Weight Management Programme. More participants were recruited at GP surgeries (n=268) than at community pharmacies (n=183). In total, 204 participants (GP n=102; pharmacy n=102) attended session twelve and 82 participants (GP n=22; pharmacy 60) attended session fifteen. The unique demographic characteristics of My Choice Weight Management Programme participants – participants were recruited from areas with high levels of socioeconomic deprivation and over four-fifths of participants were from Black and Minority Ethnic groups; populations which are traditionally underserved by healthcare interventions – make the achievements of the Programme particularly notable. The mean weight loss at session 12 was 3.8 kg (equivalent to a reduction of 4.0% of initial weight) among GP surgery participants and 2.4 kg (2.8%) among pharmacy participants. At session 15 mean weight loss was 2.3 kg (2.2%) among GP surgery participants and 3.4 kg (4.0%) among pharmacy participants. The My Choice Weight Management Programme improved the general health status of participants between recruitment and session twelve as measured by the validated SF-12 questionnaire. While cost data is presented in this report, it is unclear which provider type delivered the Programme more cost-effectively. Attendance rates on the Programme were consistently better among pharmacy participants than among GP participants. The opinions of programme participants (both those who attended regularly and those who failed to attend as expected) and programme providers were explored via semi-structured interviews and, in the case of the participants, a selfcompletion postal questionnaire. These data suggest that the Programme was almost uniformly popular with both the deliverers of the Programme and participants on the Programme with 83% of questionnaire respondents indicating that they would be happy to recommend the Programme to other people looking to lose weight. Our recommendations, based on the evidence provided in this report, include: a. Any consideration of an extension to the study also giving comparable consideration to an extension of the Programme evaluation. The feasibility of assigning participants to a pharmacy provider or a GP provider via a central allocation system should also be examined. This would address imbalances in participant recruitment levels between provider type and allow for more accurate comparison of the effectiveness in the delivery of the Programme between GP surgeries and community pharmacies by increasing the homogeneity of participants at each type of site and increasing the number of Programme participants overall. b. Widespread dissemination of the findings from this review of the My Choice Weight Management Project should be undertaken through a variety of channels. c. Consideration of the inclusion of the following key aspects of the My Choice Weight Management Project in any extension to the Programme: i. The provision of training to staff in GP surgeries and community pharmacies responsible for delivery of the Programme prior to patient recruitment. ii. Maintaining the level of healthcare staff input to the Programme. iii. The regular schedule of appointments with Programme participants. iv. The provision of an increased variety of printed material. d. A simplification of the data collection method used by the Programme commissioners at the individual Programme delivery sites.
Resumo:
This study aimed to assess the effectiveness of a novel, community-based weight management programme delivered through general practitioner (GP) practices and community pharmacies in one city in the United Kingdom. This study used a non-randomized, retrospective, observational comparison of clinical data collected by participating GP practices and community pharmacies. Subjects were 451 overweight or obese men and women resident in areas of high socioeconomic deprivation (82% from black and minority ethnic groups, 86% women, mean age: 41.1 years, mean body mass index [BMI]: 34.5 kg m−2). Weight, waist circumference and BMI at baseline, after 12 weeks and after 9 months were measured. Costs of delivery were also analysed. Sixty-four per cent of participants lost weight after the first 12 weeks of the My Choice Weight Management Programme. There was considerable dropout. Mean percentage weight loss (last observation carried forward) was 1.9% at 12 weeks and 1.9% at final follow-up (9 months). There was no significant difference in weight loss between participants attending GP practices and those attending pharmacies at both 12 weeks and at final follow-up. Costs per participant were higher via community pharmacy which was attributable to better attendance at sessions among community pharmacy participants than among GP participants. The My Choice Weight Management Programme produced modest reductions in weight at 12 weeks and 9 months. Such programmes may not be sufficient to tackle the obesity epidemic.
Resumo:
Increasing ethnic diversity in the UK means that there is a growing need for National Health Service care to be delivered to non-English-speaking patients. The aims of the present systematic review were to: (1) better understand the outcomes of chronic pain management programmes (PMPs) for ethnic minority and non-English-speaking patients and (2) explore the perspectives on and experiences of chronic pain for these groups. A systematic review identified 26 papers meeting the inclusion criteria; no papers reported on the outcomes of PMPs delivered in the UK. Of the papers obtained, four reported on PMPs conducted outside the UK; eight reported on ethnic differences in patients seeking support from pain management services in America; and the remaining papers included literature reviews, an experimental pain study, a collaborative enquiry, and a survey of patient and clinician ratings of pain. The findings indicate a lack of research into UK-based pain management for ethnic minorities and non-English-speaking patients. The literature suggests that effective PMPs must be tailored to meet cultural experiences of pain and beliefs about pain management. There is a need for further research to explore these cultural beliefs in non-English-speaking groups in the UK. Culturally sensitive evaluations of interpreted PMPs with long-term follow-up are needed to assess the effectiveness of current provision. Copyright © 2015 John Wiley & Sons, Ltd.
Resumo:
Purpose – The purpose of the paper is to develop an integrated framework for performance management of healthcare services. Design/methodology/approach – This study develops a performance management framework for healthcare services using a combined analytic hierarchy process (AHP) and logical framework (LOGFRAME). The framework is then applied to the intensive care units of three different hospitals in developing nations. Numerous focus group discussions were undertaken, involving experts from the specific area under investigation. Findings – The study reveals that a combination of outcome, structure and process-based critical success factors and a combined AHP and LOGFRAME-based performance management framework helps manage performance of healthcare services. Practical implications – The proposed framework could be practiced in hospital-based healthcare services. Originality/value – The conventional approaches to healthcare performance management are either outcome-based or process-based, which cannot reveal improvement measures appropriately in order to assure superior performance. Additionally, they lack planning, implementing and evaluating improvement projects that are identified from performance measurement. This study presents an integrated approach to performance measurement and implementing framework of improvement projects.
Resumo:
The fast spread of the Internet and the increasing demands of the service are leading to radical changes in the structure and management of underlying telecommunications systems. Active networks (ANs) offer the ability to program the network on a per-router, per-user, or even per-packet basis, thus promise greater flexibility than current networks. To make this new network paradigm of active network being widely accepted, a lot of issues need to be solved. Management of the active network is one of the challenges. This thesis investigates an adaptive management solution based on genetic algorithm (GA). The solution uses a distributed GA inspired by bacterium on the active nodes within an active network, to provide adaptive management for the network, especially the service provision problems associated with future network. The thesis also reviews the concepts, theories and technologies associated with the management solution. By exploring the implementation of these active nodes in hardware, this thesis demonstrates the possibility of implementing a GA based adaptive management in the real network that being used today. The concurrent programming language, Handel-C, is used for the description of the design system and a re-configurable computer platform based on a FPGA process element is used for the hardware implementation. The experiment results demonstrate both the availability of the hardware implementation and the efficiency of the proposed management solution.
Resumo:
In this demonstration, we will present a semantic environment called the K-Box. The K-Box supports the lightweight integration of knowledge tools, with a focus on semantic tools, but with the flexibility to integrate natural language and conventional tools. We discuss the implementation of the framework, and two existing applications, including details of a new application for developers of semantic workflows. The demonstration will be of interest to developers and researchers of ontology-based knowledge management systems, and semantic desktops, and to analysts working with cross-media information. © 2011 ACM.
Resumo:
Over the course of the last twenty years there has been a growing academic interest in performance management, particularly in respect of the evolution of new techniques and their resulting impact. One important theoretical development has been the emergence of multidimensional performance measurement models that are potentially applicable within the public sector. Empirically, academic researchers are increasingly supporting the use of such models as a way of improving public sector management and the effectiveness of service provision (Mayston, 1985; Pollitt, 1986; Bates and Brignall, 1993; and Massey, 1999). This paper seeks to add to the literature by using both theoretical and empirical evidence to argue that CPA, the external inspection tool used by the Audit Commission to evaluate local authority performance management, is a version of the Balanced Scorecard which, when adapted for internal use, may have beneficial effects. After demonstrating the parallels between the CPA framework and Kaplan and Norton's public sector Balanced Scorecard (BSC), we use a case study of the BSC based performance management system in Hertfordshire County Council to demonstrate the empirical linkages between a local scorecard and CPA. We conclude that CPA is based upon the BSC and has the potential to serve as a springboard for the evolution of local authority performance management systems.