35 resultados para cost model
em Aston University Research Archive
Resumo:
Are the perceptions of professional economists on transaction costs consistent with make-or-buy decisions made within firms? The answer may have important implications for transaction cost research. Data on firms' outsourcing during the new product development process are taken from a largescale survey of UK, German and Irish manufacturing plants, and we test the consistency of these outsourcing decisions with the predictions derived from the transaction cost perceptions of a panel of economists. Little consistency is evident between actual outsourcing patterns and the predictions of the (Williamsonian) transactions cost model derived from the panel of economists. There is, however, evidence of a systematic pattern to the differences, suggesting that a competence or resource-based approach may be relevant to understanding firm outsourcing, and that firms are adopting a strategic approach to managing their external relationships. © Cambridge Political Economy Society 2005; all rights reserved.
Resumo:
Information systems have developed to the stage that there is plenty of data available in most organisations but there are still major problems in turning that data into information for management decision making. This thesis argues that the link between decision support information and transaction processing data should be through a common object model which reflects the real world of the organisation and encompasses the artefacts of the information system. The CORD (Collections, Objects, Roles and Domains) model is developed which is richer in appropriate modelling abstractions than current Object Models. A flexible Object Prototyping tool based on a Semantic Data Storage Manager has been developed which enables a variety of models to be stored and experimented with. A statistical summary table model COST (Collections of Objects Statistical Table) has been developed within CORD and is shown to be adequate to meet the modelling needs of Decision Support and Executive Information Systems. The COST model is supported by a statistical table creator and editor COSTed which is also built on top of the Object Prototyper and uses the CORD model to manage its metadata.
Resumo:
The work described in the following pages was carried out at various sites in the Rod Division of the Delta Metal Company. Extensive variation in the level of activity in the industry during the years 1974 to I975 had led to certain inadequacies being observed 1n the traditional cost control procedure. In an attempt to remedy this situation it was suggested that a method be found of constructing a system to improve the flexibility of cost control procedures. The work involved an assimilation of the industrial and financial environment via pilot studies which would later prove invaluable to home in on the really interesting and important areas. Weaknesses in the current systems which came to light made the methodology of data collection and the improvement of cost control and profit planning procedures easier to adopt. Because of the requirements of the project to investigate the implications of Cost behaviour for profit planning and control, the next stage of the research work was to utilise the on-site experience to examine at a detailed level the nature of cost behaviour. The analysis of factory costs then showed that certain costs, which were the most significant exhibited a stable relationship with respect to some known variable, usually a specific measure of Output. These costs were then formulated in a cost model, to establish accurate standards in a complex industrial setting in order to provide a meaningful comparison against which to judge actual performance. The necessity of a cost model was •reinforced by the fact that the cost behaviour found to exist was, in the main, a step function, and this complex cost behaviour, the traditional cost and profit planning procedures could not possibly incorporate. Already implemented from this work is the establishment of the post of information officer to co-ordinate data collection and information provision.
Resumo:
The aim of this research was to improve the quantitative support to project planning and control principally through the use of more accurate forecasting for which new techniques were developed. This study arose from the observation that in most cases construction project forecasts were based on a methodology (c.1980) which relied on the DHSS cumulative cubic cost model and network based risk analysis (PERT). The former of these, in particular, imposes severe limitations which this study overcomes. Three areas of study were identified, namely growth curve forecasting, risk analysis and the interface of these quantitative techniques with project management. These fields have been used as a basis for the research programme. In order to give a sound basis for the research, industrial support was sought. This resulted in both the acquisition of cost profiles for a large number of projects and the opportunity to validate practical implementation. The outcome of this research project was deemed successful both in theory and practice. The new forecasting theory was shown to give major reductions in projection errors. The integration of the new predictive and risk analysis technologies with management principles, allowed the development of a viable software management aid which fills an acknowledged gap in current technology.
Resumo:
Biomass-To-Liquid (BTL) is one of the most promising low carbon processes available to support the expanding transportation sector. This multi-step process produces hydrocarbon fuels from biomass, the so-called “second generation biofuels” that, unlike first generation biofuels, have the ability to make use of a wider range of biomass feedstock than just plant oils and sugar/starch components. A BTL process based on gasification has yet to be commercialized. This work focuses on the techno-economic feasibility of nine BTL plants. The scope was limited to hydrocarbon products as these can be readily incorporated and integrated into conventional markets and supply chains. The evaluated BTL systems were based on pressurised oxygen gasification of wood biomass or bio-oil and they were characterised by different fuel synthesis processes including: Fischer-Tropsch synthesis, the Methanol to Gasoline (MTG) process and the Topsoe Integrated Gasoline (TIGAS) synthesis. This was the first time that these three fuel synthesis technologies were compared in a single, consistent evaluation. The selected process concepts were modelled using the process simulation software IPSEpro to determine mass balances, energy balances and product distributions. For each BTL concept, a cost model was developed in MS Excel to estimate capital, operating and production costs. An uncertainty analysis based on the Monte Carlo statistical method, was also carried out to examine how the uncertainty in the input parameters of the cost model could affect the output (i.e. production cost) of the model. This was the first time that an uncertainty analysis was included in a published techno-economic assessment study of BTL systems. It was found that bio-oil gasification cannot currently compete with solid biomass gasification due to the lower efficiencies and higher costs associated with the additional thermal conversion step of fast pyrolysis. Fischer-Tropsch synthesis was the most promising fuel synthesis technology for commercial production of liquid hydrocarbon fuels since it achieved higher efficiencies and lower costs than TIGAS and MTG. None of the BTL systems were competitive with conventional fossil fuel plants. However, if government tax take was reduced by approximately 33% or a subsidy of £55/t dry biomass was available, transport biofuels could be competitive with conventional fuels. Large scale biofuel production may be possible in the long term through subsidies, fuels price rises and legislation.
Resumo:
This thesis is concerned with the inventory control of items that can be considered independent of one another. The decisions when to order and in what quantity, are the controllable or independent variables in cost expressions which are minimised. The four systems considered are referred to as (Q, R), (nQ,R,T), (M,T) and (M,R,T). Wiith ((Q,R) a fixed quantity Q is ordered each time the order cover (i.e. stock in hand plus on order ) equals or falls below R, the re-order level. With the other three systems reviews are made only at intervals of T. With (nQ,R,T) an order for nQ is placed if on review the inventory cover is less than or equal to R, where n, which is an integer, is chosen at the time so that the new order cover just exceeds R. In (M, T) each order increases the order cover to M. Fnally in (M, R, T) when on review, order cover does not exceed R, enough is ordered to increase it to M. The (Q, R) system is examined at several levels of complexity, so that the theoretical savings in inventory costs obtained with more exact models could be compared with the increases in computational costs. Since the exact model was preferable for the (Q,R) system only exact models were derived for theoretical systems for the other three. Several methods of optimization were tried, but most were found inappropriate for the exact models because of non-convergence. However one method did work for each of the exact models. Demand is considered continuous, and with one exception, the distribution assumed is the normal distribution truncated so that demand is never less than zero. Shortages are assumed to result in backorders, not lost sales. However, the shortage cost is a function of three items, one of which, the backorder cost, may be either a linear, quadratic or an exponential function of the length of time of a backorder, with or without period of grace. Lead times are assumed constant or gamma distributed. Lastly, the actual supply quantity is allowed to be distributed. All the sets of equations were programmed for a KDF 9 computer and the computed performances of the four inventory control procedures are compared under each assurnption.
Resumo:
In examining bank cost efficiency in banking inclusion of risk-taking of banks is very important. In this paper we depart from the standard modeling approach and view risk intimately related to the technology. Thus, instead of controlling for risk by viewing them as covariates in the standard cost function we argue that the technology differs with risk, thereby meaning that the parameters of the parametric cost function changes with risk in a fully flexible manner. This is accomplished by viewing the parameters of the cost function as nonparametric functions of risk. We also control for country-specific effects in a fully flexible manner by using them as arguments of the nonparametric functions along with the risk variable. The resulting cost function then becomes semiparametric. The standard parametric model becomes a special case of our semiparametric model. We use the above modeling approach for banks in the EU countries. Actually, European financial integration is seen as a stepping stone for the development of a competitive single EU market that promotes efficiency and increases consumer welfare, changing the risk profile of the European banks. Particularly, financial integration allows more risk diversification and permits banks to use more advanced risk management instruments and systems, however it has at the same time increased the probability of systematic risks. Financial integration has increased the risk of contagion and changed its nature and scope. Consequently the bank’s risk seems to be an important issue to be investigated.
Resumo:
Background: Coronary heart disease (CHD) is a public health priority in the UK. The National Service Framework (NSF) has set standards for the prevention, diagnosis and treatment of CHD, which include the use of cholesterol-lowering agents aimed at achieving targets of blood total cholesterol (TC) < 5.0 mmol/L and low density lipoprotein-cholesterol (LDL-C) < 3.0 mmol/L. In order to achieve these targets cost effectively, prescribers need to make an informed choice from the range of statins available. Aim: To estimate the average and relative cost effectiveness of atorvastatin, fluvastatin, pravastatin and simvastatin in achieving the NSF LDL-C and TC targets. Design: Model-based economic evaluation. Methods: An economic model was constructed to estimate the number of patients achieving the NSF targets for LDL-C and TC at each dose of statin, and to calculate the average drug cost and incremental drug cost per patient achieving the target levels. The population baseline LDL-C and TC, and drug efficacy and drug costs were taken from previously published data. Estimates of the distribution of patients receiving each dose of statin were derived from the UK national DIN-LINK database. Results: The estimated annual drug cost per 1000 patients treated with atorvastatin was £289 000, with simvastatin £315 000, with pravastatin £333 000 and with fluvastatin £167 000. The percentages of patients achieving target are 74.4%, 46.4%, 28.4% and 13.2% for atorvastatin, simvastatin, pravastatin and fluvastatin, respectively. Incremental drug cost per extra patient treated to LDL-C and TC targets compared with fluvastafin were £198 and £226 for atorvastatin, £443 and £567 for simvastatin and £1089 and £2298 for pravastatin, using 2002 drug costs. Conclusions: As a result of its superior efficacy, atorvastatin generates a favourable cost-effectiveness profile as measured by drug cost per patient treated to LDL-C and TC targets. For a given drug budget, more patients would achieve NSF LDL-C and TC targets with atorvastatin than with any of the other statins examined.
Resumo:
Diabetes patients might suffer from an unhealthy life, long-term treatment and chronic complicated diseases. The decreasing hospitalization rate is a crucial problem for health care centers. This study combines the bagging method with base classifier decision tree and costs-sensitive analysis for diabetes patients' classification purpose. Real patients' data collected from a regional hospital in Thailand were analyzed. The relevance factors were selected and used to construct base classifier decision tree models to classify diabetes and non-diabetes patients. The bagging method was then applied to improve accuracy. Finally, asymmetric classification cost matrices were used to give more alternative models for diabetes data analysis.
Resumo:
Offshore oil and gas pipelines are vulnerable to environment as any leak and burst in pipelines cause oil/gas spill resulting in huge negative Impacts on marine lives. Breakdown maintenance of these pipelines is also cost-intensive and time-consuming resulting in huge tangible and intangible loss to the pipeline operators. Pipelines health monitoring and integrity analysis have been researched a lot for successful pipeline operations and risk-based maintenance model is one of the outcomes of those researches. This study develops a risk-based maintenance model using a combined multiple-criteria decision-making and weight method for offshore oil and gas pipelines in Thailand with the active participation of experienced executives. The model's effectiveness has been demonstrated through real life application on oil and gas pipelines in the Gulf of Thailand. Practical implications. Risk-based inspection and maintenance methodology is particularly important for oil pipelines system, as any failure in the system will not only affect productivity negatively but also has tremendous negative environmental impact. The proposed model helps the pipelines operators to analyze the health of pipelines dynamically, to select specific inspection and maintenance method for specific section in line with its probability and severity of failure.
Resumo:
The existing method of pipeline health monitoring, which requires an entire pipeline to be inspected periodically, is both time-wasting and expensive. A risk-based model that reduces the amount of time spent on inspection has been presented. This model not only reduces the cost of maintaining petroleum pipelines, but also suggests efficient design and operation philosophy, construction methodology and logical insurance plans. The risk-based model uses Analytic Hierarchy Process (AHP), a multiple attribute decision-making technique, to identify the factors that influence failure on specific segments and analyzes their effects by determining probability of risk factors. The severity of failure is determined through consequence analysis. From this, the effect of a failure caused by each risk factor can be established in terms of cost, and the cumulative effect of failure is determined through probability analysis. The technique does not totally eliminate subjectivity, but it is an improvement over the existing inspection method.
A profile of low vision services in England the Low Vision Service Model Evaluation (LOVSME) project
Resumo:
In the UK, low vision rehabilitation is delivered by a wide variety of providers with different strategies being used to integrate services from health, social care and the voluntary sector. In order to capture the current diversity of service provision the Low vision Service Model Evaluation (LOVSME) project aimed to profile selected low vision services using published standards for service delivery as a guide. Seven geographically and organizationally varied low-vision services across England were chosen for their diversity and all agreed to participate. A series of questionnaires and follow-up visits were undertaken to obtain a comprehensive description of each service, including the staff workloads and the cost of providing the service. In this paper the strengths of each model of delivery are discussed, and examples of good practice identified. As a result of the project, an Assessment Framework tool has been developed that aims to help other service providers evaluate different aspects of their own service to identify any gaps in existing service provision, and will act as a benchmark for future service development.
Resumo:
Based on recent advances in autonomic computing, we propose a methodology for the cost-effective development of self-managing systems starting from a model of the resources to be managed and using a general-purpose autonomic architecture.
Resumo:
In construction projects, the aim of project control is to ensure projects finish on time, within budget, and achieve other project objectives. During the last few decades, numerous project control methods have been developed and adopted by project managers in practice. However, many existing methods focus on describing what the processes and tasks of project control are; not on how these tasks should be conducted. There is also a potential gap between principles that underly these methods and project control practice. As a result, time and cost overruns are still common in construction projects, partly attributable to deficiencies of existing project control methods and difficulties in implementing them. This paper describes a new project cost and time control model, the project control and inhibiting factors management (PCIM) model, developed through a study involving extensive interaction with construction practitioners in the UK, which better reflects the real needs of project managers. A set of good practice checklist is also developed to facilitate implementation of the model. © 2013 American Society of Civil Engineers.
Resumo:
Most parametric software cost estimation models used today evolved in the late 70's and early 80's. At that time, the dominant software development techniques being used were the early 'structured methods'. Since then, several new systems development paradigms and methods have emerged, one being Jackson Systems Development (JSD). As current cost estimating methods do not take account of these developments, their non-universality means they cannot provide adequate estimates of effort and hence cost. In order to address these shortcomings two new estimation methods have been developed for JSD projects. One of these methods JSD-FPA, is a top-down estimating method, based on the existing MKII function point method. The other method, JSD-COCOMO, is a sizing technique which sizes a project, in terms of lines of code, from the process structure diagrams and thus provides an input to the traditional COCOMO method.The JSD-FPA method allows JSD projects in both the real-time and scientific application areas to be costed, as well as the commercial information systems applications to which FPA is usually applied. The method is based upon a three-dimensional view of a system specification as opposed to the largely data-oriented view traditionally used by FPA. The method uses counts of various attributes of a JSD specification to develop a metric which provides an indication of the size of the system to be developed. This size metric is then transformed into an estimate of effort by calculating past project productivity and utilising this figure to predict the effort and hence cost of a future project. The effort estimates produced were validated by comparing them against the effort figures for six actual projects.The JSD-COCOMO method uses counts of the levels in a process structure chart as the input to an empirically derived model which transforms them into an estimate of delivered source code instructions.