3 resultados para cost elements

em Aston University Research Archive


Relevância:

60.00% 60.00%

Publicador:

Resumo:

The need for an adequate information system for the Highways Departments in the United Kingdom has been recognised by the report of a committee presented to the Minister of Transport in 1970, (The Marshall Report). This research aims to present a comprehensive information system on a sound theoretical basis which should enable the different levels of management to execute their work adequately. The suggested system presented in this research covers the different functions of the Highways Department, and presents a suggested solution for problems which may occur during the planning and controlling of work in the different locations of the Highways Department. The information system consists of:- 1. A coding system covering the cost units, cost centres and cost elements. 2. Cost accounting records for the cost units and cost centres. 3. A budgeting and budgetary control system covering, the different planning methods and procedures which are required for preparing the capital expenditure budget, the improvement and maintenance operation flexible budgets and programme of work, the plant budget, the administration budget, and the purchasing budget. 4. A reporting system which ensures that the different levels of management are receiving relevant and timely information. 5. The flow of documents which covers the relationship between the prime documents, the cost accounting records, budgets, reports and their relation to the different sections and offices within the department. A comprehensive cost units, cost centres, and cost elements codes together with a number of examples demonstrating the results of the survey, and examples of the application and procedures of the suggested information system have been illustrated separately as appendices. The emphasis is on the information required for internal control by management personnel within the County Council.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents a new method for the optimisation of the mirror element spacing arrangement and operating temperature of linear Fresnel reflectors (LFR). The specific objective is to maximise available power output (i.e. exergy) and operational hours whilst minimising cost. The method is described in detail and compared to an existing design method prominent in the literature. Results are given in terms of the exergy per total mirror area (W/m2) and cost per exergy (US $/W). The new method is applied principally to the optimisation of an LFR in Gujarat, India, for which cost data have been gathered. It is recommended to use a spacing arrangement such that the onset of shadowing among mirror elements occurs at a transversal angle of 45°. This results in a cost per exergy of 2.3 $/W. Compared to the existing design approach, the exergy averaged over the year is increased by 9% to 50 W/m2 and an additional 122 h of operation per year are predicted. The ideal operating temperature at the surface of the absorber tubes is found to be 300 °C. It is concluded that the new method is an improvement over existing techniques and a significant tool for any future design work on LFR systems

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In Great Britain and Brazil healthcare is free at the point of delivery and based study only on citizenship. However, the British NHS is fifty-five years old and has undergone extensive reforms. The Brazilian SUS is barely fifteen years old. This research investigated the middle management mediation role within hospitals comparing managerial planning and control using cost information in Great Britain and Brazil. This investigation was conducted in two stages entailing quantitative and qualitative techniques. The first stage was a survey involving managers of 26 NHS Trusts in Great Britain and 22 public hospitals in Brazil. The second stage consisted of interviews, 10 in Great Britain and 22 in Brazil, conducted in four selected hospitals, two in each country. This research builds on the literature by investigating the interaction of contingency theory and modes of governance in a cross-national study in terms of public hospitals. It further builds on the existing literature by measuring managerial dimensions related to cost information usefulness. The project unveils the practice involved in planning and control processes. It highlights important elements such as the use of predictive models and uncertainty reduction when planning. It uncovers the different mechanisms employed on control processes. It also depicts that planning and control within British hospitals are structured procedures and guided by overall goals. In contrast, planning and control processes in Brazilian hospitals are accidental, involving more ad hoc actions and a profusion of goals. The clinicians in British hospitals have been integrated into the management hierarchy. Their use of cost information in planning and control processes reflects this integration. However, in Brazil, clinicians have been shown to operate more independently and make little use of cost information but the potential signalled for cost information use is seen to be even greater than that of their British counterparts.