Several parties (stakeholders) are involved in a construction project. The conventional Risk Management Process (RMP) manages risks from a single party perspective, which does not give adequate consideration to the needs of others. The objective of multi-party risk management is to assist decision-makers in managing risk systematically and most efficiently in a multi-party environment. Multi-party Risk Management Processes (MRMP) consist of risk identification, structuring, analysis and developing responses from all party perspectives. The MRMP has been applied to a cement plant construction project in Thailand to demonstrate its effectiveness.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In an exploding and fluctuating construction market, managers are facing a challenge, which is how to manage business on a wider scale and to utilize modern developments in information technology to promote productivity. The extraordinary development of telecommunications and computer technology makes it possible for people to plan, lead, control, organize and manage projects from a distance without the need to be on site on a daily basis. A modern management known as distance management (DM) or remote management is emerging. Physical distance no longer determines the boundary of management since managers can now operate projects through virtual teams that organize manpower, material and production without face-to-face communication. What organization prototype could overcome psychological and physical barriers to reengineer a successful project through information technology? What criteria distinguishes the adapted way of communication of individual activities in a teamwork and assist the integration of an efficient and effective communication between face-to-face and a physical distance? The entire methodology has been explained through a case application on refuse incineration plant projects in Taiwan.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Small and Medium-sized construction Enterprises (construction SMEs) in Thailand face challenges like high fragmented structure and low productivity. Many industries improved their business performance using the supply chain integration. This research was conducted by interviewing 14 small and medium Thai building contractors to understand the features and relationship characteristics of the supply chain of construction SMEs. The study reveals that the linkages between the small and medium general contractors and other supply chain members are based on personal trust rather than contract laws, there is no systematic procedure to manage the relationship with clients during the project execution, and social connections help to maintain long-term relationship with clients. Based on the working behaviour and commitment to long-term relationship, six forms of relationship with supply side members are proposed. Finally, improvement measures for the supply chain integration of the construction SMEs in Thailand are presented.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Operating oil pipelines in an optimum capacity through out its life, effective construction management and failure free operations are considered as critical success factors in oil transportation business. Operating oil pipelines in derated capacity due to deteriorating pipeline health or lack of demand, non-ability of augmenting pipeline capacity despite of demand, non-achievement of time, cost, and quality of pipeline construction projects, and many failures of pipelines despite of huge expenditure in inspection and maintenance are the common phenomena in oil pipelines industry. These not only cause business loss, but also increase stakeholders' concerns for sustainable development. This study addresses the above issues using an analytical framework through stakeholders' involvement. Copyright © 2006 Inderscience Enterprises Ltd.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose - Managers at the company attempt to implement a knowledge management information system in an attempt to avoid loss of expertise while improving control and efficiency. The paper seeks to explore the implications of the technological solution to employees within the company. Design/methodology/approach - The paper reports qualitative research conducted in a single organization. Evidence is presented in the form of interview extracts. Findings - The case section of the paper presents the accounts of organizational participants. The accounts reveal the workers' reactions to the technology-based system and something of their strategies of resistance to the system. These accounts also provide glimpses of the identity construction engaged in by these knowledge workers. The setting for the research is in a knowledge-intensive primary industry. Research was conducted through observation and interviews. Research limitations/implications - The issues identified are explored in a single case-study setting. Future research could look at the relevance of the findings to other settings. Practical implications - The case evidence presented indicates some of the complexity of implementation of information systems in organizations. This could certainly be seen as more evidence of the uncertainty associated with organizational change and of the need for managers not to expect an easy adoption of intrusive IT solutions. Originality/value - This paper adds empirical insight to a largely conceptual literature. © Emerald Group Publishing Limited.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A cross-country pipeline construction project is exposed to an uncertain environment due to its enormous size (physical, manpower requirement and financial value), complexity in design technology and involvement of external factors. These uncertainties can lead to several changes in project scope during the process of project execution. Unless the changes are properly controlled, the time, cost and quality goals of the project may never be achieved. A methodology is proposed for project control through risk analysis, contingency allocation and hierarchical planning models. Risk analysis is carried out through the analytic hierarchy process (AHP) due to the subjective nature of risks in construction projects. The results of risk analysis are used to determine the logical contingency for project control with the application of probability theory. Ultimate project control is carried out by hierarchical planning model which enables decision makers to take vital decisions during the changing environment of the construction period. Goal programming (GP), a multiple criteria decision-making technique, is proposed for model formulation because of its flexibility and priority-base structure. The project is planned hierarchically in three levels—project, work package and activity. GP is applied separately at each level. Decision variables of each model are different planning parameters of the project. In this study, models are formulated from the owner's perspective and its effectiveness in project control is demonstrated.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Mobile technology has not yet achieved widespread acceptance in the Architectural, Engineering, and Construction (AEC) industry. This paper presents work that is part of an ongoing research project focusing on the development of multimodal mobile applications for use in the AEC industry. This paper focuses specifically on a context-relevant lab-based evaluation of two input modalities – stylus and soft-keyboard v. speech-based input – for use with a mobile data collection application for concrete test technicians. The manner in which the evaluation was conducted as well as the results obtained are discussed in detail.