5 resultados para construction productivity

em Aston University Research Archive


Relevância:

30.00% 30.00%

Publicador:

Resumo:

In an exploding and fluctuating construction market, managers are facing a challenge, which is how to manage business on a wider scale and to utilize modern developments in information technology to promote productivity. The extraordinary development of telecommunications and computer technology makes it possible for people to plan, lead, control, organize and manage projects from a distance without the need to be on site on a daily basis. A modern management known as distance management (DM) or remote management is emerging. Physical distance no longer determines the boundary of management since managers can now operate projects through virtual teams that organize manpower, material and production without face-to-face communication. What organization prototype could overcome psychological and physical barriers to reengineer a successful project through information technology? What criteria distinguishes the adapted way of communication of individual activities in a teamwork and assist the integration of an efficient and effective communication between face-to-face and a physical distance? The entire methodology has been explained through a case application on refuse incineration plant projects in Taiwan.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Small and Medium-sized construction Enterprises (construction SMEs) in Thailand face challenges like high fragmented structure and low productivity. Many industries improved their business performance using the supply chain integration. This research was conducted by interviewing 14 small and medium Thai building contractors to understand the features and relationship characteristics of the supply chain of construction SMEs. The study reveals that the linkages between the small and medium general contractors and other supply chain members are based on personal trust rather than contract laws, there is no systematic procedure to manage the relationship with clients during the project execution, and social connections help to maintain long-term relationship with clients. Based on the working behaviour and commitment to long-term relationship, six forms of relationship with supply side members are proposed. Finally, improvement measures for the supply chain integration of the construction SMEs in Thailand are presented.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This study is concerned with quality and productivity aspects of traditional house building. The research focuses on these issues by concentrating on the services and finishing stages of the building process. These are work stages which have not been fully investigated in previous productivity related studies. The primary objective of the research is to promote an integrated design and construction led approach to traditional house building based on an original concept of 'development cycles'. This process involves the following: site monitoring; the analysis of work operations; implementing design and construction changes founded on unique information collected during site monitoring; and subsequent re-monitoring to measure and assess Ihe effect of change. A volume house building firm has been involved in this applied research and has allowed access to its sites for production monitoring purposes. The firm also assisted in design detailing for a small group of 'experimental' production houses where various design and construction changes were implemented. Results from the collaborative research have shown certain quality and productivity improvements to be possible using this approach, albeit on a limited scale at this early experimental stage. The improvements have been possible because an improved activity sampling technique, developed for, and employed by the study, has been able to describe why many quality and productivity related problems occur during site building work. Experience derived from the research has shown the following attributes to be important: positive attitudes towards innovation; effective communication; careful planning and organisation; and good coordination and control at site level. These are all essential aspects of quality led management and determine to a large extent the overall success of this approach. Future work recommendations must include a more widespread use of innovative practices so that further design and construction modifications can be made. By doing this, productivity can be improved, cost savings made and better quality afforded.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This study is concerned with labour productivity in traditional house building in Scotland. Productivity is a measure of the effective use of resources and provides vital benefits that can be combined in a number of ways. The introduction gives the background to two Scottish house building sites (Blantyre and Greenfield) that were surveyed by the Building Research Establishment (BEE) activity sampling method to provide the data for the study. The study had two main objectives; (1) summary data analysis in average manhours per house between all the houses on the site, and (2) detailed data analysis in average manhours for each house block on the site. The introduction also provides a literature review related to the objectives. The method is outlined in Chapter 2, the sites are discussed in Chapter 3, and Chapter 4 covers the method application on each site and a method development made in the study. The summary data analysis (Chapter 5) compares Blantyre and Greenfield, and two previous BEE surveys in England. The main detailed data analysis consisted of three forms, (Chapters 6, 7 and 8) each applied to a set of operations. The three forms of analysis were variations in average manhours per house for each house block on the site compared with; (1) block construction order, (2) average number of separate visits per house made by operatives to each block to complete an operation, and (3) average number of different operatives per house employed on an operation in each block. Three miscellaneous items of detail data analysis are discussed in Chapter 9. The conclusions to the whole study state that considerable variations in manhours for repeated operations were discovered, that the numbers of visits by operatives to complete operations were large and that the numbers of different operatives employed in some operations were a factor related to productivity. A critique of the activity sampling method suggests that the data produced is reliable in summary form and can give a good context for more detailed data collection. For future work, this could take the form of selected operations, with the context of an activity sampling survey, that wuld be intensively surveyed by other methods.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The construction industry is susceptible to extreme weather events (EWEs) due to most of its activities being conducted by manual workers outdoors. Although research has been conducted on the effects of EWEs, such as flooding and snowfall, limited research has been conducted on the effects of heatwaves and hot weather conditions. Heatwaves present a somewhat different risk profile to construction, unlike EWEs such as flooding and heavy snowfall that present physical obstacles to work onsite. However, heatwaves have affected the construction industry in the UK, and construction claims have been made due to adverse weather conditions. With heatwaves being expected to occur more frequently in the coming years, the construction industry may suffer unlike any other industry during the summer months. This creates the need to investigate methods that would allow construction activities to progress during hot summer months with minimal effect on construction projects. Hence, the purpose of this paper. Regions such as the Middle East and the UAE in particular flourish with mega projects, although temperatures soar to above 40̊C in the summer months. Lessons could be learnt from such countries and adapted in the UK. Interviews have been conducted with a lead representative of a client, a consultant and a contractor, all of which currently operate on UAE projects. The key findings include one of the preliminary steps taken by international construction companies operating in the UAE. This involves restructuring their entire regional team by employing management staff from countries such as Lebanon, Palestine, Iraq, and their labour force from the sub-continent such as India and Pakistan. This is not only due to the cheap wage rate but also to the ability to cope and work in such extreme hot weather conditions. The experience of individuals working in the region allows for future planning, where the difference in labour productivity during the extreme hot weather conditions is known, allowing precautionary measures to be put in place.