Undergraduate programmes on construction management and other closely related built environment disciplines are currently taught and assessed on a modular basis. This is the case in the UK and in many other countries globally. However, it can be argued that professionally oriented programmes like these are better assessed on a non-modular basis, in order to produce graduates who can apply knowledge on different subject contents in cohesion to solve complex practical scenarios in their work environments. The examples of medical programmes where students are assessed on a non-modular basis can be cited as areas where this is already being done. A preliminary study was undertaken to explore the applicability of non-modular assessment within construction management undergraduate education. A selected sample of university academics was interviewed to gather their perspectives on applicability of non-modular assessment. General acceptance was observed among the academics involved that integrating non-modular assessment is applicable and will be beneficial. All academics stated that at least some form of non-modular assessment as being currently used in their programmes. Examples where cross-modular knowledge is assessed included comprehensive/multi-disciplinary project modules and creating larger modules to amalgamate a number of related subject areas. As opposed to a complete shift from modular to non-modular, an approach where non-modular assessment is integrated and its use further expanded within the current system is therefore suggested. This is due to the potential benefits associated with this form of assessment to professionally aligned built environment programmes
Resumo:
This study was geared at assessing the employability skills provision within a construction project management degree programme through a questionnaire survey. Students were required to assess their level of ability in relation to the most common skills and competencies most sought after by construction project management graduate employers. The study identified team-working ability as the most sought after skill by the employers investigated followed by verbal communication, written communication and leadership ability. It was found that students were very confident of their ability in 12 of the 14 identified skills and competencies. But ironically, leadership, an important skill sought by employers is one that majority of the students felt most insecure in their ability. The study concludes that the BSc programme equips students with these employability skills and competencies, but more effort is needed to make the leadership development opportunities in the programme more conspicuous. With recommendations on how to achieve this proffered.
Resumo:
Despite the availability of various control techniques and project control software many construction projects still do not achieve their cost and time objectives. Research in this area so far has mainly been devoted to identifying causes of cost and time overruns. There is limited research geared towards studying factors inhibiting the ability of practitioners to effectively control their projects. To fill this gap, a survey was conducted on 250 construction project organizations in the UK, which was followed by face-to-face interviews with experienced practitioners from 15 of these organizations. The common factors that inhibit both time and cost control during construction projects were first identified. Subsequently 90 mitigating measures have been developed for the top five leading inhibiting factors—design changes, risks/uncertainties, inaccurate evaluation of project time/duration, complexities and non-performance of subcontractors were recommended. These mitigating measures were classified as: preventive, predictive, corrective and organizational measures. They can be used as a checklist of good practice and help project managers to improve the effectiveness of control of their projects.
Resumo:
Determining an appropriate research methodology is considered as an important element in a research study; especially in a doctoral research study. It involves approach to the entire process of a research study, starting from theoretical underpinnings and spanning to data collection and analysis, and extending to developing the solutions for the problems investigated. Research methodology in essence is focused around the problems to be investigated in a research study and therefore varies according to the problems investigated. Thus, identifying the research methodology that best suits a research in hand is important, not only as it will benefit achieving the set objectives of a research, but also as it will serve establishing the credibility of the work. Research philosophy, approach, strategy, choice, and techniques are inherent components of the methodology. Research strategy provides the overall direction of the research including the process by which the research is conducted. Case study, experiment, survey, action research, grounded theory and ethnography are examples for such research strategies. Case study is documented as an empirical inquiry that investigates a contemporary phenomenon within its real-life context, especially when the boundaries between phenomenon and context are not clearly evident. Case study was adopted as the overarching research strategy, in a doctoral study developed to investigate the resilience of construction Small and Medium-sized Enterprises (SMEs) in the UK to extreme weather events. The research sought to investigate how construction SMEs are affected by EWEs, respond to the risk of EWEs, and means of enhancing their resilience to future EWEs. It is argued that utilising case study strategy will benefit the research study, in achieving the set objectives of the research and answering the research questions raised, by comparing and contrasting with the alternative strategies available. It is also claimed that the selected strategy will contribute towards addressing the call for improved methodological pluralism in construction management research, enhancing the understanding of complex network of relationships pertinent to the industry and the phenomenon being studied.
Resumo:
The Indian Petroleum Industry is passing through a very dynamic business environment due to liberalization. Effective project management for developing new infrastructures and maintaining the existing facilities has been considered as one of the means for remaining competitive but these practices suffer from many shortcomings, as time, cost and quality non-achievements are part and parcel of almost every project. This study focuses on identifying the specific causes of project failure by demonstrating first the characteristics of projects in Indian Petroleum industry and suggests some remedial measures for resolving these issues. The suggested project management model is integrated through information management system and demonstrated through a case study.
Resumo:
Determining an appropriate research methodology is considered as an important element in a research study; especially in a doctoral research study. It involves approach to the entire process of a research study, starting from theoretical underpinnings and spanning to data collection and analysis, and extending to developing the solutions for the problems investigated. Research methodology in essence is focused around the problems to be investigated in a research study and therefore varies according to the problems investigated. Thus, identifying the research methodology that best suits a research in hand is important, not only as it will benefit achieving the set objectives of a research, but also as it will serve establishing the credibility of the work. Research philosophy, approach, strategy, choice, and techniques are inherent components of the methodology. Research strategy provides the overall direction of the research including the process by which the research is conducted. Case study, experiment, survey, action research, grounded theory and ethnography are examples for such research strategies. Case study is documented as an empirical inquiry that investigates a contemporary phenomenon within its real-life context, especially when the boundaries between phenomenon and context are not clearly evident. Case study was adopted as the overarching research strategy, in a doctoral study developed to investigate the resilience of construction Small and Medium-sized Enterprises (SMEs) in the UK to extreme weather events. The research sought to investigate how construction SMEs are affected by EWEs, respond to the risk of EWEs, and means of enhancing their resilience to future EWEs. It is argued that utilising case study strategy will benefit the research study, in achieving the set objectives of the research and answering the research questions raised, by comparing and contrasting with the alternative strategies available. It is also claimed that the selected strategy will contribute towards addressing the call for improved methodological pluralism in construction management research, enhancing the understanding of complex network of relationships pertinent to the industry and the phenomenon being studied.
Resumo:
Operating oil pipelines in an optimum capacity through out its life, effective construction management and failure free operations are considered as critical success factors in oil transportation business. Operating oil pipelines in derated capacity due to deteriorating pipeline health or lack of demand, non-ability of augmenting pipeline capacity despite of demand, non-achievement of time, cost, and quality of pipeline construction projects, and many failures of pipelines despite of huge expenditure in inspection and maintenance are the common phenomena in oil pipelines industry. These not only cause business loss, but also increase stakeholders' concerns for sustainable development. This study addresses the above issues using an analytical framework through stakeholders' involvement. Copyright © 2006 Inderscience Enterprises Ltd.
Resumo:
Building's construction activities, operation and demolition are increasingly recognised as a major source of environmental impact. One strategy for reducing such impacts is most widely known by the term Building Environmental Assessment (BEA). The research is an attempt to develop a new BEA scheme for residential buildings in Brunei which focussing on identifying BEA indicators that best suit for Brunei environment, social and economy. Studies show that Brunei residential sector needs urgent attention to transform its current consumption rate in more sustainable way. Recent launch of Brunei Green Building Council, mandatory energy efficiency guidelines and declaration of ambitious energy intensity reduction target, a new BEA scheme will help contribute sustainability target in residential sector. However the issues of developing a new BEA schemes using existing methods may face constraints in their effectiveness. In this regard, a consensus-forming technique-Delphi method-helps improve greater communication and gain consensus from experts in the construction industry through series of questionnaires. As a result, the final framework is produced comprises of 7 key categories and 37 applicable criteria that achieved high degree of consensus and importance.
Resumo:
Several parties (stakeholders) are involved in a construction project. The conventional Risk Management Process (RMP) manages risks from a single party perspective, which does not give adequate consideration to the needs of others. The objective of multi-party risk management is to assist decision-makers in managing risk systematically and most efficiently in a multi-party environment. Multi-party Risk Management Processes (MRMP) consist of risk identification, structuring, analysis and developing responses from all party perspectives. The MRMP has been applied to a cement plant construction project in Thailand to demonstrate its effectiveness.
Resumo:
In an exploding and fluctuating construction market, managers are facing a challenge, which is how to manage business on a wider scale and to utilize modern developments in information technology to promote productivity. The extraordinary development of telecommunications and computer technology makes it possible for people to plan, lead, control, organize and manage projects from a distance without the need to be on site on a daily basis. A modern management known as distance management (DM) or remote management is emerging. Physical distance no longer determines the boundary of management since managers can now operate projects through virtual teams that organize manpower, material and production without face-to-face communication. What organization prototype could overcome psychological and physical barriers to reengineer a successful project through information technology? What criteria distinguishes the adapted way of communication of individual activities in a teamwork and assist the integration of an efficient and effective communication between face-to-face and a physical distance? The entire methodology has been explained through a case application on refuse incineration plant projects in Taiwan.
Resumo:
Purpose - The purpose of the paper is to the identify risk factors, which affect oil and gas construction projects in Vietnam and derive risk responses. Design/methodology/approach - Questionnaire survey was conducted with the involvement of project executives of PetroVietnam and statistical analysis was carried out in order to identify the major project risks. Subsequently, mitigating measures were derived using informal interviews with the various levels of management of PetroVietnam. Findings - Bureaucratic government system and long project approval procedures, poor design, incompetence of project team, inadequate tendering practices, and late internal approval processes from the owner were identified as major risks. The executives suggested various strategies to mitigate the identified risks. Reforming the government system, effective partnership with foreign collaborators, training project executives, implementing contractor evaluation using multiple criteria decision-making technique, and enhancing authorities of project people were suggested as viable approaches. Practical implications - The improvement measures as derived in this study would improve chances of project success in the oil and gas industry in Vietnam. Originality/value - There are several risk management studies on managing projects in developing countries. However, as risk factors vary considerably across industry and countries, the study of risk management for successful projects in the oil and gas industry in Vietnam is unique and has tremendous importance for effective project management.
Resumo:
Conventional project management techniques are not always sufficient for ensuring time, cost and quality achievement of large-scale construction projects due to complexity in planning and implementation processes. The main reasons for project non-achievement are changes in scope and design, changes in Government policies and regulations, unforeseen inflation) under-estimation and improper estimation. Projects that are exposed to such an uncertain environment can be effectively managed with the application of risk numagement throughout project life cycle. However, the effectiveness of risk management depends on the technique in which the effects of risk factors are analysed and! or quantified. This study proposes Analytic Hierarchy Process (AHP), a multiple attribute decision-making technique as a tool for risk analysis because it can handle subjective as well as objective factors in decision model that are conflicting in nature. This provides a decision support system (DSS) to project managenumt for making the right decision at the right time for ensuring project success in line with organisation policy, project objectives and competitive business environment. The whole methodology is explained through a case study of a cross-country petroleum pipeline project in India and its effectiveness in project1nana.gement is demonstrated.
Resumo:
This article explores the notion that the workplace is a learning environment, and that the line manager is a key player determining its effectiveness. The work discusses how performance management systems may be used to clarify expectations made of line managers with regard to employee development. The work, in addition, suggests that line manager people management expertise may be a factor inhibiting workplace development for subordinates, and makes a number of suggestions about how to prepare the line manager for effective employee development. Key issues are illustrated by reference to a case study example. The case demonstrates that a high profile management development programme within a major international organisation failed to meet all objectives because of the unwillingness of the line management team to participate in the development of subordinates back in the workplace.