9 resultados para affordable housing management
em Aston University Research Archive
Resumo:
Around 80% of the 63 million people in the UK live in urban areas where demand for affordable housing is highest. Supply of new dwellings is a long way short of demand and with an average annual replacement rate of 0.5% more than 80% of the existing residential housing stock will still be in use by 2050. A high proportion of owner-occupiers, a weak private rental sector and lack of sustainable financing models render England’s housing market one of the least responsive in the developed world. As an exploratory research the purpose of this paper is to examine the provision of social housing in the United Kingdom with a particular focus on England, and to set out implications for housing associations delivering sustainable community development. The paper is based on an analysis of historical data series (Census data), current macro-economic data and population projections to 2033. The paper identifies a chronic undersupply of affordable housing in England which is likely to be exacerbated by demographic development, changes in household composition and reduced availability of finance to develop new homes. Based on the housing market trends analysed in this paper opportunities are identified for policy makers to remove barriers to the delivery of new affordable homes and for social housing providers to evolve their business models by taking a wider role in sustainable community development.
Resumo:
This article examines the adoption, by the New Labour government, of a mixed communities approach to the renewal of disadvantaged neighbourhoods in England. It argues that while there are continuities with previous policy, the new approach represents a more neoliberal policy turn in three respects: its identification of concentrated poverty as the problem; its faith in market-led regeneration; and its alignment with a new urban policy agenda in which cities are gentrified and remodelled as sites for capital accumulation through entrepreneurial local governance. The article then draws on evidence from the early phases of the evaluation of the mixed community demonstration projects to explore how the new policy approach is playing out at a local level, where it is layered upon existing policies, politics and institutional relationships. Tensions between neighbourhood and strategic interests, community and capital are evident as the local projects attempt neighbourhood transformation, while seeking to protect the rights and interests of existing residents. Extensive community consultation efforts run parallel with emergent governance structures, in which local state and capital interests combine and communities may effectively be disempowered. Policies and structures are still evolving and it is not yet entirely clear how these tensions will be resolved, especially in the light of a collapsing housing market, increased poverty and demand for affordable housing, and a shortage of private investment.
Resumo:
The Registered Social Landlord (an independent housing association in the UK) examined here was widely recognized as providing an example of good governance. The organization was using extensive internal reporting, both corporate and quasi-governmental in language, to try to accurately capture different aspects of performance. This article reveals that reporting sustainable development has boundaries to be overcome, particularly in measuring performance of environmental and community activities. © 2008 The Authors.
Resumo:
This exploratory study is concerned with the integrated appraisal of multi-storey dwelling blocks which incorporate large concrete panel systems (LPS). The first step was to look at U.K. multi-storey dwelling stock in general, and under the management of Birmingham City Council in particular. The information has been taken from the databases of three departments in the City of Birmingham, and rearranged in a new database using a suite of PC software called `PROXIMA' for clarity and analysis. One hundred of their stock were built large concrete panel system. Thirteen LPS blocks were chosen for the purpose of this study as case-studies depending mainly on the height and age factors of the block. A new integrated appraisal technique has been created for the LPS dwelling blocks, which takes into account the most physical and social factors affecting the condition and acceptability of these blocks. This appraisal technique is built up in a hierarchical form moving from the general approach to particular elements (a tree model). It comprises two main approaches; physical and social. In the physical approach, the building is viewed as a series of manageable elements and sub-elements to cover every single physical or environmental factor of the block, in which the condition of the block is analysed. A quality score system has been developed which depends mainly on the qualitative and quantitative conditions of each category in the appraisal tree model, and leads to physical ranking order of the study blocks. In the social appraisal approach, the residents' satisfaction and attitude toward their multi-storey dwelling block was analysed in relation to: a. biographical and housing related characteristics; and b. social, physical and environmental factors associated with this sort of dwelling, block and estate in general.The random sample consisted of 268 residents living in the 13 case study blocks. Data collected was analysed using frequency counts, percentages, means, standard deviations, Kendall's tue, r-correlation coefficients, t-test, analysis of variance (ANOVA) and multiple regression analysis. The analysis showed a marginally positive satisfaction and attitude towards living in the block. The five most significant factors associated with the residents' satisfaction and attitude in descending order were: the estate, in general; the service categories in the block, including heating system and lift services; vandalism; the neighbours; and the security system of the block. An important attribute of this method, is that it is relatively inexpensive to implement, especially when compared to alternatives adopted by some local authorities and the BRE. It is designed to save time, money and effort, to aid decision making, and to provide ranked priority to the multi-storey dwelling stock, in addition to many other advantages. A series of solution options to the problems of the block was sought for selection and testing before implementation. The traditional solutions have usually resulted in either demolition or costly physical maintenance and social improvement of the blocks. However, a new solution has now emerged, which is particularly suited to structurally sound units. The solution of `re-cycling' might incorporate the reuse of an entire block or part of it, by removing panels, slabs and so forth from the upper floors in order to reconstruct them as low-rise accommodations.
Resumo:
Post-disaster housing reconstruction projects face several challenges. Resources and material supplies are often scarce; several and different types of organizations are involved, while projects must be completed as quickly as possible to foster recovery. Within this context, the chapter aims to increase the understanding of relief supply chain design in reconstruction. In addition, the chapter is introducing a community based and beneficiary perspective to relief supply chains by evaluating the implications of local components for supply chain design in reconstruction. This is achieved through the means of secondary data analysis based on the evaluation reports of two major housing reconstruction projects that took place in Europe the last decade. A comparative analysis of the organizational designs of these projects highlights the ways in which users can be involved. The performance of reconstruction supply chains seems to depend to a large extent on the way beneficiaries are integrated in supply chain design impacting positively on the effectiveness of reconstruction supply chains.
Resumo:
This study focuses on the use of traffic lights by a Registered Social Landlord (RSL) as a visual representation of self conduct that reflects a way of thinking, acting and constituting a 'well governed, well managed and viable' housing association. We show that the visible representation of traffic lights introduced by the regulator as indicators of performance has been used widely by the RSL to reflect two self-imposed principles of continuous improvement and self assessment. In this context the different accounts of governmentality within the RSLs board reports are studied and some significant insights suggested. © 2010 Elsevier Ltd.
Resumo:
Recent technological advances have paved the way for developing and offering advanced services for the stakeholders in the agricultural sector. A paradigm shift is underway from proprietary and monolithic tools to Internet-based, cloud hosted, open systems that will enable more effective collaboration between stakeholders. This new paradigm includes the technological support of application developers to create specialized services that will seamlessly interoperate, thus creating a sophisticated and customisable working environment for the end users. We present the implementation of an open architecture that instantiates such an approach, based on a set of domain independent software tools called "generic enablers" that have been developed in the context of the FI-WARE project. The implementation is used to validate a number of innovative concepts for the agricultural sector such as the notion of a services' market place and the system's adaptation to network failures. During the design and implementation phase, the system has been evaluated by end users, offering us valuable feedback. The results of the evaluation process validate the acceptance of such a system and the need of farmers to have access to sophisticated services at affordable prices. A summary of this evaluation process is also presented in this paper. © 2013 Elsevier B.V.
Resumo:
The UK government aims at achieving 80% CO2 emission reduction by 2050 which requires collective efforts across all the UK industry sectors. In particular, the housing sector has a large potential to contribute to achieving the aim because the housing sector alone accounts for 27% of the total UK CO2 emission, and furthermore, 87% of the housing which is responsible for current 27% CO2 emission will still stand in 2050. Therefore, it is essential to improve energy efficiency of existing housing stock built with low energy efficiency standard. In order for this, a whole‐house needs to be refurbished in a sustainable way by considering the life time financial and environmental impacts of a refurbished house. However, the current refurbishment process seems to be challenging to generate a financially and environmentally affordable refurbishment solution due to the highly fragmented nature of refurbishment practice and a lack of knowledge and skills about whole‐house refurbishment in the construction industry. In order to generate an affordable refurbishment solution, diverse information regarding costs and environmental impacts of refurbishment measures and materials should be collected and integrated in right sequences throughout the refurbishment project life cycle among key project stakeholders. Consequently, various researchers increasingly study a way of utilizing Building Information Modelling (BIM) to tackle current problems in the construction industry because BIM can support construction professionals to manage construction projects in a collaborative manner by integrating diverse information, and to determine the best refurbishment solution among various alternatives by calculating the life cycle costs and lifetime CO2 performance of a refurbishment solution. Despite the capability of BIM, the BIM adoption rate is low with 25% in the housing sector and it has been rarely studied about a way of using BIM for housing refurbishment projects. Therefore, this research aims to develop a BIM framework to formulate a financially and environmentally affordable whole‐house refurbishment solution based on the Life Cycle Costing (LCC) and Life Cycle Assessment (LCA) methods simultaneously. In order to achieve the aim, a BIM feasibility study was conducted as a pilot study to examine whether BIM is suitable for housing refurbishment, and a BIM framework was developed based on the grounded theory because there was no precedent research. After the development of a BIM framework, this framework was examined by a hypothetical case study using BIM input data collected from questionnaire survey regarding homeowners’ preferences for housing refurbishment. Finally, validation of the BIM framework was conducted among academics and professionals by providing the BIM framework and a formulated refurbishment solution based on the LCC and LCA studies through the framework. As a result, BIM was identified as suitable for housing refurbishment as a management tool, and it is timely for developing the BIM framework. The BIM framework with seven project stages was developed to formulate an affordable refurbishment solution. Through the case study, the Building Regulation is identified as the most affordable energy efficiency standard which renders the best LCC and LCA results when it is applied for whole‐house refurbishment solution. In addition, the Fabric Energy Efficiency Standard (FEES) is recommended when customers are willing to adopt high energy standard, and the maximum 60% of CO2 emissions can be reduced through whole‐house fabric refurbishment with the FEES. Furthermore, limitations and challenges to fully utilize BIM framework for housing refurbishment were revealed such as a lack of BIM objects with proper cost and environmental information, limited interoperability between different BIM software and limited information of LCC and LCA datasets in BIM system. Finally, the BIM framework was validated as suitable for housing refurbishment projects, and reviewers commented that the framework can be more practical if a specific BIM library for housing refurbishment with proper LCC and LCA datasets is developed. This research is expected to provide a systematic way of formulating a refurbishment solution using BIM, and to become a basis for further research on BIM for the housing sector to resolve the current limitations and challenges. Future research should enhance the BIM framework by developing more detailed process map and develop BIM objects with proper LCC and LCA Information.