31 resultados para Waste of construction and demolition(RCD)
em Aston University Research Archive
Resumo:
In the area of international environmental law this thesis proposes the formulation of one-step planning and permitting regulation for the integrated utilisation of new surface mines as depositories for municipal solid waste. Additionally, the utilisation of abandoned and currently operated surface mines is proposed as solid waste landfills as an integral step in their reclamation. Existing laws, litigation and issues in the United Kingdom, the U.S. and Canada are discussed because of their common legal system, language and heritage. The critical shortage of approved space for disposal of solid waste has caused an urgent and growing problem for both the waste disposal industry and society. Surface mining can serve three important environmental and societal functions inuring to the health and welfare of the public: (1) providing basic minerals for goods and construction; (20 sequentially, to provide critically needed, safe burial sites for society's wastes, and (3) to conserve land by dual purpose use and to restore derelict land to beneficial surface use. Currently, the first two functions are treated environmentally, and in regulation, as two different siting problems, yet they both are earth-disturbing and excavating industries requiring surface restoration. The processes are largely duplicative and should be combined for better efficiency, less earth disturbance, conservation of land, and for fuller and better reclamation of completed surface mines returning the surfaces to greater utility than present mined land reclamation procedures. While both industries are viewed by a developed society and its communities as "bad neighbours", they remain essential and critical for mankind's existence and welfare. The study offers successful examples of the integrated process in each country. The study argues that most non-fuel surface mine openings, if not already safe, can economically, through present containment technology, be made environmentally safe for use as solid waste landfills. Simultaneously, the procedure safeguards and monitors protection of ground and surface waters from landfill contamination.
Resumo:
The ordination of women to the priesthood in the Church of England in 1994 signified great change. The impact of the new priests was well documented, and their integration became the focus of much research in the following years. One important area of change was the altered dynamics of gender identity. New roles had opened up for women, but new identities had also emerged for men. While women priests were a new historical emergence, so too were clergy husbands. This paper will consider the historical construction of masculinities and femininities within the church and will go on to look at this in the context of clergy spouses, specifically focusing on men occupying this role. Some provisional findings, acting as work in progress, will be considered.
Resumo:
This article presents a sociological study of sleep issues in the British print news media, with particular focus on the relationship between sleep, work and the changing demands of ‘flexible capitalism’. Drawing on over 1000 newspaper articles from 1984 to 2005, we explore how and why sleep is framed or constructed in terms of continuity and change (in British working life and work cultures) and, equally, viewed as a neglected component of our social lives which is too easily sacrificed to the demands of the 24/7 society, long hours culture and the struggle to create a harmonious work-life balance. This is particularly the case for certain British work cultures in which sleep has conflicting and contrasting associations. Finally, we reflect on the broader class-based discourses and debates that arise from certain workers having their sleep patterns increasingly scrutinized and regulated, and the role of the media in any ensuing sleep/work ‘crisis’.
Resumo:
What role do the media play in the medicalization of sleep problems? This article, based on a British Academy funded project, uses qualitative textual analysis to examine representations of insomnia and snoring in a large representative sample of newspaper articles taken from the UK national press from the mid-1980s to the present day. Constructed as ‘common problems’ in the population at large, insomnia and snoring we show are differentially located in terms of medicalizing—healthicizing discourses and debates. Our findings also suggest important differences in the gendered construction of these problems and in terms of tabloid and ‘broadsheet’ newspaper coverage of these issues. Newspaper constructions of sleep, it is concluded, are complex, depending on both the ‘problem’ and the paper in question.
Resumo:
The Small and Medium-sized construction Enterprises (construction SMEs) in Thailand face challenges like high fragmented structure and low productivity. Many industries improved their business performance using the supply chain integration. This research was conducted by interviewing 14 small and medium Thai building contractors to understand the features and relationship characteristics of the supply chain of construction SMEs. The study reveals that the linkages between the small and medium general contractors and other supply chain members are based on personal trust rather than contract laws, there is no systematic procedure to manage the relationship with clients during the project execution, and social connections help to maintain long-term relationship with clients. Based on the working behaviour and commitment to long-term relationship, six forms of relationship with supply side members are proposed. Finally, improvement measures for the supply chain integration of the construction SMEs in Thailand are presented.
Resumo:
Britain's sea and flood defences are becoming increasingly aged and as a consequence, more fragile and vulnerable. As the government's philosophy on resources shifts against the use of prime quarried and dredged geo-materials, the need to find alternative bulk materials to bolster Britain's prone defences becomes more pressing. One conceivable source for such a material is colliery waste or minestone. Although a plethora of erosion-abrasion studies have been carried out on soils and soil-cements, very little research has been undertaken to determine the resistance of minestone and its cement stabilized form to the effects of water erosion. The thesis reviews the current extent to which soil-cements, minestone and cement stabilized minestone (CSM) have been employed for hydraulic construction projects. A synopsis is also given on the effects of immersion on shales, mudstones and minestone, especially with regard to the phenomena of slaking. A laboratory study was undertaken featuring a selection of minestones from several British coalfields. The stability of minestone and CSM in sea water and distilled water was assessed using slaking tests and immersion monitoring and the bearing on the use of these materials for hydraulic construction is discussed. Following a review of current erosion apparatus, the erosion/abrasion test and rotating cylinder device were chosen and employed to assess the erosion resistance of minestone and CSM. Comparison was made with a sand mix designed to represent a dredged sand, the more traditional, bulk hydraulic construction material. The results of the erosion study suggest that both minestone and CSM were more resistant to erosion and abrasion than equivalently treated sand mixes. The greater resistance of minestone to the agents of erosion and abrasion is attributed to several factors including the size of the particles, a greater degree of cement bonding and the ability of the minestone aggregate to absorb, rather than transmit shock waves produced by impacting abrasive particles. Although minestone is shown to be highly unstable when subjected to cyclic changes in its moisture content, the study suggests that even in an intertidal regime where cyclic immersion does takes place, minestone will retain sufficient moisture within its fabric to prevent slaking from taking place. The slaking study reveals a close relationship between slaking susceptibility and total pore surface area as revealed by porosimetry. The immersion study shows that although the fabric of CSM is rapidly attacked in sea water, a high degree of the disruption is associated with the edges and corners of samples (ie. free surface) while the integrity of the internal fabric remains relatively intact. CSM samples were shown to be resilient when subjected to immersion in distilled water. An overall assessment of minestone and CSM would suggest that with the implementation of judicious selection and appropriate quality control they could be used as alternative materials for flood and sea defences. It is believed, that even in the harsh regime of a marine environment, CSM could be employed for temporary and sacrificial schemes.
Resumo:
Many planning and control tools, especially network analysis, have been developed in the last four decades. The majority of them were created in military organization to solve the problem of planning and controlling research and development projects. The original version of the network model (i.e. C.P.M/PERT) was transplanted to the construction industry without the consideration of the special nature and environment of construction projects. It suited the purpose of setting up targets and defining objectives, but it failed in satisfying the requirement of detailed planning and control at the site level. Several analytical and heuristic rules based methods were designed and combined with the structure of C.P.M. to eliminate its deficiencies. None of them provides a complete solution to the problem of resource, time and cost control. VERT was designed to deal with new ventures. It is suitable for project evaluation at the development stage. CYCLONE, on the other hand, is concerned with the design and micro-analysis of the production process. This work introduces an extensive critical review of the available planning techniques and addresses the problem of planning for site operation and control. Based on the outline of the nature of site control, this research developed a simulation based network model which combines part of the logics of both VERT and CYCLONE. Several new nodes were designed to model the availability and flow of resources, the overhead and operating cost and special nodes for evaluating time and cost. A large software package is written to handle the input, the simulation process and the output of the model. This package is designed to be used on any microcomputer using MS-DOS operating system. Data from real life projects were used to demonstrate the capability of the technique. Finally, a set of conclusions are drawn regarding the features and limitations of the proposed model, and recommendations for future work are outlined at the end of this thesis.
Resumo:
In 1974 Dr D M Bramwell published his research work at the University of Aston a part of which was the establishment of an elemental work study data base covering drainage construction. The Transport and Road Research Laboratory decided to, extend that work as part of their continuing research programme into the design and construction of buried pipelines by placing a research contract with Bryant Construction. This research may be considered under two broad categories. In the first, site studies were undertaken to validate and extend the data base. The studies showed good agreement with the existing data with the exception of the excavation trench shoring and pipelaying data which was amended to incorporate new construction plant and methods. An inter-active on-line computer system for drainage estimating was developed. This system stores the elemental data, synthesizes the standard time of each drainage operation and is used to determine the required resources and construction method of the total drainage activity. The remainder of the research was into the general topic of construction efficiency. An on-line command driven computer system was produced. This system uses a stochastic simulation technique, based on distributions of site efficiency measurements to evaluate the effects of varying performance levels. The analysis of this performance data quantities the variability inherent in construction and demonstrates how some of this variability can be reconciled by considering the characteristics of a contract. A long term trend of decreasing efficiency with contract duration was also identified. The results obtained from the simulation suite were compared to site records collected from current contracts. This showed that this approach will give comparable answers, but these are greatly affected by the site performance parameters.
Resumo:
Despite the availability of various control techniques and project control software many construction projects still do not achieve their cost and time objectives. Research in this area so far has mainly been devoted to identifying causes of cost and time overruns. There is limited research geared towards studying factors inhibiting the ability of practitioners to effectively control their projects. To fill this gap, a survey was conducted on 250 construction project organizations in the UK, which was followed by face-to-face interviews with experienced practitioners from 15 of these organizations. The common factors that inhibit both time and cost control during construction projects were first identified. Subsequently 90 mitigating measures have been developed for the top five leading inhibiting factors—design changes, risks/uncertainties, inaccurate evaluation of project time/duration, complexities and non-performance of subcontractors were recommended. These mitigating measures were classified as: preventive, predictive, corrective and organizational measures. They can be used as a checklist of good practice and help project managers to improve the effectiveness of control of their projects.
Resumo:
Numerous techniques have been developed to control cost and time of construction projects. However, there is limited research on issues surrounding the practical usage of these techniques. To address this, a survey was conducted on the top 150 construction companies and 100 construction consultancies in the UK aimed at identifying common project control practices and factors inhibiting effective project control in practice. It found that despite the vast application of control techniques a high proportion of respondents still experienced cost and time overruns on a significant proportion of their projects. Analysis of the survey results concluded that more effort should be geared at the management of the identified top project control inhibiting factors. This paper has outlined some measures for mitigating these inhibiting factors so that the outcome of project time and cost control can be improved in practice.
Resumo:
This paper extends existing understandings of how actors' constructions of ambiguity shape the emergent process of strategic action. We theoretically elaborate the role of rhetoric in exploiting strategic ambiguity, based on analysis of a longitudinal case study of an internationalization strategy within a business school. Our data show that actors use rhetoric to construct three types of strategic ambiguity: protective ambiguity that appeals to common values in order to protect particular interests, invitational ambiguity that appeals to common values in order to invite participation in particular actions, and adaptive ambiguity that enables the temporary adoption of specific values in order to appeal to a particular audience at one point in time. These rhetorical constructions of ambiguity follow a processual pattern that shapes the emergent process of strategic action. Our findings show that (1) the strategic actions that emerge are shaped by the way actors construct and exploit ambiguity, (2) the ambiguity intrinsic to the action is analytically distinct from ambiguity that is constructed and exploited by actors, and (3) ambiguity construction shifts over time to accommodate the emerging pattern of actions.
Building up resilience of construction sector SMEs and their supply chains to extreme weather events
Resumo:
Wider scientific community now accept that the threat of climate change as real and thus acknowledge the importance of implementing adaptation measures in a global context. In the UK , the physical effects of climate change are likely to be directly felt in the form of extreme weather events, which are predicted to escalate in number and severity in future under the changing climatic conditions. Construction industry; which consists of supply chains running across various other industries, economies and regions, will also be affected due to these events. Thus, it is important that the construction organisations are well prepared to withstand the effects of extreme weather events not only directly affecting their organisations but also affecting their supply chains which in turn might affect the organisation concerned. Given the fact that more than 99% of construction sector businesses are SMEs, the area can benefit significantly from policy making to improve SME resilience and coping capacity. This paper presents the literature review and synthesis of a doctoral research study undertaken to address the issue of extreme weather resilience of construction sector SMEs and their supply chains. The main contribution of the paper to both academia and practitioners is a synthesis model that conceptualises the factors that enhances resilience of SMEs and their supply chains against extreme weather events. This synthesis model forms the basis of a decision making framework that will enable SMEs to both reduce their vulnerability and enhance their coping capacity against extreme weather. The value of this paper is further extended by the overall research design that is set forth as the way forward.
Resumo:
Strategic sourcing has increased in importance in recent years, and now plays an important role in companies’ planning. The current volatility in supply markets means companies face multiple challenges involving lock-in situations, supplier bankruptcies or supply security issues. In addition, their exposure can increase due to natural disasters, as witnessed recently in the form of bird flu, volcanic ash and tsunamis. Therefore, the primary focus of this study is risk management in the context of strategic sourcing. The study presents a literature review on sourcing based on the 15 years from 1998–2012, and considers 131 academic articles. The literature describes strategic sourcing as a strategic, holistic process in managing supplier relationships, with a long-term focus on adding value to the company and realising competitive advantage. Few studies discovered the real risk impact and status of risk management in strategic sourcing, and evaluation across countries and industries was limited, with the construction sector particularly under-researched. This methodology is founded on a qualitative study of twenty cases across Ger-many and the United Kingdom from the construction sector and electronics manufacturing industries. While considering risk management in the context of strategic sourcing, the thesis takes into account six dimensions that cover trends in strategic sourcing, theoretical and practical sourcing models, risk management, supply and demand management, critical success factors and the strategic supplier evaluation. The study contributes in several ways. First, recent trends are traced and future needs identified across the research dimensions of countries, industries and companies. Second, it evaluates critical success factors in contemporary strategic sourcing. Third, it explores the application of theoretical and practical sourcing models in terms of effectiveness and sustainability. Fourth, based on the case study findings, a risk-oriented strategic sourcing framework and a model for strategic sourcing are developed. These are based on the validation of contemporary requirements and a critical evaluation of the existing situation. It contemplates the empirical findings and leads to a structured process to manage risk in strategic sourcing. The risk-oriented framework considers areas such as trends, corporate and sourcing strategy, critical success factors, strategic supplier selection criteria, risk assessment, reporting, strategy alignment and reporting. The proposed model highlights the essential dimensions in strategic sourcing and guides us to a new definition of strategic sourcing supported by this empirical study.