19 resultados para Supply control
em Aston University Research Archive
Resumo:
DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT
Resumo:
DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT
Resumo:
The application of any e-Solution promises significant returns. In particular, using internet technologies both within enterprises and across the supply (value) chain provides real opportunity, not only for operational improvement but also for innovative strategic positioning. However, significant questions obscure potential investment; how any value will actually be created and, importantly, how this value will be shared across the value chain is not clear. This paper will describe a programme of research that is developing an enterprise simulator that will provide a more fundamental understanding of the impact of e-Solutions across operational supply chains, in terms of both standard operational and financial measures of performance. An efficient supply chain reduces total costs of operations by sharing accurate real-time information and coordinating inter-organizational business processes. This form of electronic link between organizations is known as business-to-business (B2B) e-Business. The financial measures go beyond simple cost calculations to real bottom-line performance by modelling the financial transactions that business processes generate. The paper will show how this enterprise simulator allows for a complete supply chain to be modelled in this way across four key applications: control system design, virtual enterprises, pan-supply-chain performance metrics and supporting e-Supply-chain design methodology.
Resumo:
For many decades, the Kingdom of Saudi Arabia has been widely known for being a reliable oil exporter. This fact, however, has not exempted it from facing significant domestic energy challenges. One of the most pressing of these challenges involves bridging the widening electricity supply-demand gap where, currently, the demand is growing at a very fast rate. One crucial means to address this challenge is through delivering power supply projects with maximum efficiency. Project delivery delay, however, is not uncommon in this highly capital-intensive industry, indicating electricity supplies are not coping with the demand increases. To provide a deeper insight into the challenges of project implementation and efficient practice, this research adopts a pragmatic approach by triangulating literature, questionnaires and semi-structured interviews. The research was conducted in the Saudi Arabian power supply industry – Western Operating Area. A total of 105 usable questionnaires were collected, and 28 recorded, semi-structured interviews were conducted, analysed and synthesised to produce a conceptual model of what constitutes the project implementation challenges in the investigated industry. This was achieved by conducting a comprehensive ranking analysis applied to all 58 identified and surveyed factors which, according to project practitioners in the investigated industry, contribute to project delay. 28 of these project delay factors were selected as the "most important" ones. Factor Analysis was employed to structure these 28 most important project delay factors into the following meaningful set of 7 project implementation challenges: Saudi Electricity Company's contractual commitments, Saudi Electricity Company's communication and coordination effectiveness, contractors' project planning and project control effectiveness, consultant-related aspects, manpower challenges and material uncertainties, Saudi Electricity Company's tendering system, and lack of project requirements clarity. The study has implications for industry policy in that it provides a coherent assessment of the key project stakeholders' central problems. From this analysis, pragmatic recommendations are proposed that, if enacted, will minimise the significance of the identified problems on future project outcomes, thus helping to ensure the electricity supply-demand gap is diminished.
Resumo:
Deep hole drilling is one of the most complicated metal cutting processes and one of the most difficult to perform on CNC machine-tools or machining centres under conditions of limited manpower or unmanned operation. This research work investigates aspects of the deep hole drilling process with small diameter twist drills and presents a prototype system for real time process monitoring and adaptive control; two main research objectives are fulfilled in particular : First objective is the experimental investigation of the mechanics of the deep hole drilling process, using twist drills without internal coolant supply, in the range of diarneters Ø 2.4 to Ø4.5 mm and working length up to 40 diameters. The definition of the problems associated with the low strength of these tools and the study of mechanisms of catastrophic failure which manifest themselves well before and along with the classic mechanism of tool wear. The relationships between drilling thrust and torque with the depth of penetration and the various machining conditions are also investigated and the experimental evidence suggests that the process is inherently unstable at depths beyond a few diameters. Second objective is the design and implementation of a system for intelligent CNC deep hole drilling, the main task of which is to ensure integrity of the process and the safety of the tool and the workpiece. This task is achieved by means of interfacing the CNC system of the machine tool to an external computer which performs the following functions: On-line monitoring of the drilling thrust and torque, adaptive control of feed rate, spindle speed and tool penetration (Z-axis), indirect monitoring of tool wear by pattern recognition of variations of the drilling thrust with cumulative cutting time and drilled depth, operation as a data base for tools and workpieces and finally issuing of alarms and diagnostic messages.
Resumo:
This thesis is concerned with the inventory control of items that can be considered independent of one another. The decisions when to order and in what quantity, are the controllable or independent variables in cost expressions which are minimised. The four systems considered are referred to as (Q, R), (nQ,R,T), (M,T) and (M,R,T). Wiith ((Q,R) a fixed quantity Q is ordered each time the order cover (i.e. stock in hand plus on order ) equals or falls below R, the re-order level. With the other three systems reviews are made only at intervals of T. With (nQ,R,T) an order for nQ is placed if on review the inventory cover is less than or equal to R, where n, which is an integer, is chosen at the time so that the new order cover just exceeds R. In (M, T) each order increases the order cover to M. Fnally in (M, R, T) when on review, order cover does not exceed R, enough is ordered to increase it to M. The (Q, R) system is examined at several levels of complexity, so that the theoretical savings in inventory costs obtained with more exact models could be compared with the increases in computational costs. Since the exact model was preferable for the (Q,R) system only exact models were derived for theoretical systems for the other three. Several methods of optimization were tried, but most were found inappropriate for the exact models because of non-convergence. However one method did work for each of the exact models. Demand is considered continuous, and with one exception, the distribution assumed is the normal distribution truncated so that demand is never less than zero. Shortages are assumed to result in backorders, not lost sales. However, the shortage cost is a function of three items, one of which, the backorder cost, may be either a linear, quadratic or an exponential function of the length of time of a backorder, with or without period of grace. Lead times are assumed constant or gamma distributed. Lastly, the actual supply quantity is allowed to be distributed. All the sets of equations were programmed for a KDF 9 computer and the computed performances of the four inventory control procedures are compared under each assurnption.
Resumo:
BACKGROUND: Earlier work established an evidence practice gap during provision of nonprescription salbutamol (albuterol). Pharmacist interns are hypothesized to be in a position to improve professional practice in the community pharmacy setting. OBJECTIVE: To explore the potential of intern pharmacists to improve the professional practice of community pharmacy staff in the provision of nonprescription salbutamol. METHODS: Intern pharmacists (n = 157) delivered an asthma intervention in 136 pharmacies consisting of an educational activity to pharmacy staff and a health promotion campaign to consumers. Post-intervention, simulated patients presented to 100 intervention and 100 control community pharmacies with a request for salbutamol. The appropriate outcome was medical referral for poor asthma control and correction of poor inhaler technique. Incidence and quantity of patient assessment and counseling provided during the visit were also assessed. Logistic regression was used to determine the predictors of medical referral. RESULTS: A doubling in the rate of medical referral was seen in the intervention group (19% vs 40%; p = 0.001). Assessment of reliever use frequency was the main predictor of medical referral (OR = 22.7; 95% CI 9.06 to 56.9). Correction of poor inhaler technique did not improve; however, a reduction in salbutamol supplied without patient assessment (23% vs 8%; p = 0.009) or counseling (75% vs 48%; p < 0.001) was noted. CONCLUSIONS: A doubling in the rate of medical referral showed a clear improvement in professional practice during the provision of nonprescription salbutamol. The improved patient outcome in the intervention group was due to increased assessment of reliever use frequency. Identification of poor inhaler technique remained near zero in both groups, which suggests that intern pharmacists were able to improve the current practice of community pharmacies yet were unable to establish a new practice behavior. This study provides evidence that intern pharmacists can act as change agents to improve pharmacy practice.
Resumo:
BACKGROUND: Over one quarter of asthma reliever medications are provided without prescription by community pharmacies in Australia. Evidence that community pharmacies provide these medications with sufficient patient assessment and medication counseling to ensure compliance with the government's Quality Use of Medicines principles is currently lacking. OBJECTIVE: To assess current practice when asthma reliever medication is provided in the community pharmacy setting and to identify factors that correlate with assessment of asthma control. METHODS: Researchers posing as patients visited a sample of Perth metropolitan community pharmacies in May 2007. During the visit, the simulated patient enacted a standardized scenario of someone with moderately controlled asthma who wished to purchase a salbutamol (albuterol) inhaler without prescription. Results of the encounter were recorded immediately after the visit. Regression analysis was performed, with medication use frequency (a marker of asthma control) as the dependent variable. RESULTS: One hundred sixty community pharmacies in the Perth metropolitan area were visited in May 2007. Pharmacists and/or pharmacy assistants provided some form of assessment in 84% of the visits. Counseling was provided to the simulated patients in 24% of the visits. Only 4 pharmacy staff members asked whether the simulated patient knew how to use the inhaler. Significant correlation was found between assessment and/or counseling of reliever use frequency and 3 independent variables: visit length (p < 0.001), number of assessment questions asked (p < 0.001), and the simulated patient who conducted the visit (p < 0.02). CONCLUSIONS: Both patient assessment and medication counseling were suboptimal compared with recommended practice when nonprescription asthma reliever medication was supplied in the community pharmacy setting. Pharmacy and pharmacist demographic variables do not appear to affect assessment of asthma control. This research indicates the need for substantial improvements in practice in order to provide reliever medication in line with Quality Use of Medication principles of ensuring safe and effective use of medication.
Resumo:
The paper discusses the characteristics of healthcare supply chains, and puts particular emphasis on the implementation of VMI/CMI in this sector specific context. By the means of case study research the paper provides empirical data on the benefits of the above collaborative practices for both the hospital and vendors. The paper contributes to the stream of research on VMI/CMI in the healthcare sector, where limited research attempts have been conducted so far. In contrast to other surveys this case study shows that specific and measurable cost reductions exist, in addition to other improvements such as better control over the inventories, and also in reduction of administrative work. Results obtained may be also relevant to other hospitals and vendors and as they can form a basis for comparisons. Copyright © 2013 Inderscience Enterprises Ltd.
Resumo:
The main purpose of this research is to develop and deploy an analytical framework for measuring the environmental performance of manufacturing supply chains. This work's theoretical bases combine and reconcile three major areas: supply chain management, environmental management and performance measurement. Researchers have suggested many empirical criteria for green supply chain (GSC) performance measurement and proposed both qualitative and quantitative frameworks. However, these are mainly operational in nature and specific to the focal company. This research develops an innovative GSC performance measurement framework by integrating supply chain processes (supplier relationship management, internal supply chain management and customer relationship management) with organisational decision levels (both strategic and operational). Environmental planning, environmental auditing, management commitment, environmental performance, economic performance and operational performance are the key level constructs. The proposed framework is then applied to three selected manufacturing organisations in the UK. Their GSC performance is measured and benchmarked by using the analytic hierarchy process (AHP), a multiple-attribute decision-making technique. The AHP-based framework offers an effective way to measure and benchmark organisations’ GSC performance. This study has both theoretical and practical implications. Theoretically it contributes holistic constructs for designing a GSC and managing it for sustainability; and practically it helps industry practitioners to measure and improve the environmental performance of their supply chain. © 2013 Copyright Taylor and Francis Group, LLC. CORRIGENDUM DOI 10.1080/09537287.2012.751186 In the article ‘Green supply chain performance measurement using the analytic hierarchy process: a comparative analysis of manufacturing organisations’ by Prasanta Kumar Dey and Walid Cheffi, Production Planning & Control, 10.1080/09537287.2012.666859, a third author is added which was not included in the paper as it originally appeared. The third author is Breno Nunes.
Resumo:
This paper develops a structured method from the perspective of value to organise and optimise the business processes of a product servitised supply chain (PSSC). This method integrates the modelling tool of e3value with the associated value measurement, evaluation and analysis techniques. It enables visualisation, modelling and optimisation of the business processes of a PSSC. At the same time, the value co-creation and potential contribution to an organisation’s profitability can also be enhanced. The findings not only facilitate organisations that are attempting to adopt servitisation by helping avert any paradox, but also help a servitised organisation to identify the key business processes and clarify their influences to supply chain operations.
Resumo:
To fully utilize second-life batteries on the grid system, a hybrid battery scheme needs to be considered for several reasons: the uncertainty over using a single source supply chain for second-life batteries, the differences in evolving battery chemistry and battery configuration by different suppliers to strive for greater power levels, and the uncertainty of degradation within a second-life battery. Therefore, these hybrid battery systems could have widely different module voltage, capacity, and initial state of charge and state of health. In order to suitably integrate and control these widely different batteries, a suitable multimodular converter topology and an associated control structure are required. This paper addresses these issues proposing a modular boost-multilevel buck converter based topology to integrate these hybrid second-life batteries to a grid-tie inverter. Thereafter, a suitable module-based distributed control architecture is introduced to independently utilize each converter module according to its characteristics. The proposed converter and control architecture are found to be flexible enough to integrate widely different batteries to an inverter dc link. Modeling, analysis, and experimental validation are performed on a single-phase modular hybrid battery energy storage system prototype to understand the operation of the control strategy with different hybrid battery configurations.
Resumo:
The purpose of this paper is to delineate a green supply chain (GSC) performance measurement framework using an intra-organisational collaborative decision-making (CDM) approach. A fuzzy analytic network process (ANP)-based green-balanced scorecard (GrBSc) has been used within the CDM approach to assist in arriving at a consistent, accurate and timely data flow across all cross-functional areas of a business. A green causal relationship is established and linked to the fuzzy ANP approach. The causal relationship involves organisational commitment, eco-design, GSC process, social performance and sustainable performance constructs. Sub-constructs and sub-sub-constructs are also identified and linked to the causal relationship to form a network. The fuzzy ANP approach suitably handles the vagueness of the linguistics information of the CDM approach. The CDM approach is implemented in a UK-based carpet-manufacturing firm. The performance measurement approach, in addition to the traditional financial performance and accounting measures, aids in firms decision-making with regard to the overall organisational goals. The implemented approach assists the firm in identifying further requirements of the collaborative data across the supply-cain and information about customers and markets. Overall, the CDM-based GrBSc approach assists managers in deciding if the suppliers performances meet the industry and environment standards with effective human resource. © 2013 Taylor & Francis.