17 resultados para Rationalization of construction

em Aston University Research Archive


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many planning and control tools, especially network analysis, have been developed in the last four decades. The majority of them were created in military organization to solve the problem of planning and controlling research and development projects. The original version of the network model (i.e. C.P.M/PERT) was transplanted to the construction industry without the consideration of the special nature and environment of construction projects. It suited the purpose of setting up targets and defining objectives, but it failed in satisfying the requirement of detailed planning and control at the site level. Several analytical and heuristic rules based methods were designed and combined with the structure of C.P.M. to eliminate its deficiencies. None of them provides a complete solution to the problem of resource, time and cost control. VERT was designed to deal with new ventures. It is suitable for project evaluation at the development stage. CYCLONE, on the other hand, is concerned with the design and micro-analysis of the production process. This work introduces an extensive critical review of the available planning techniques and addresses the problem of planning for site operation and control. Based on the outline of the nature of site control, this research developed a simulation based network model which combines part of the logics of both VERT and CYCLONE. Several new nodes were designed to model the availability and flow of resources, the overhead and operating cost and special nodes for evaluating time and cost. A large software package is written to handle the input, the simulation process and the output of the model. This package is designed to be used on any microcomputer using MS-DOS operating system. Data from real life projects were used to demonstrate the capability of the technique. Finally, a set of conclusions are drawn regarding the features and limitations of the proposed model, and recommendations for future work are outlined at the end of this thesis.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Despite the availability of various control techniques and project control software many construction projects still do not achieve their cost and time objectives. Research in this area so far has mainly been devoted to identifying causes of cost and time overruns. There is limited research geared towards studying factors inhibiting the ability of practitioners to effectively control their projects. To fill this gap, a survey was conducted on 250 construction project organizations in the UK, which was followed by face-to-face interviews with experienced practitioners from 15 of these organizations. The common factors that inhibit both time and cost control during construction projects were first identified. Subsequently 90 mitigating measures have been developed for the top five leading inhibiting factors—design changes, risks/uncertainties, inaccurate evaluation of project time/duration, complexities and non-performance of subcontractors were recommended. These mitigating measures were classified as: preventive, predictive, corrective and organizational measures. They can be used as a checklist of good practice and help project managers to improve the effectiveness of control of their projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Numerous techniques have been developed to control cost and time of construction projects. However, there is limited research on issues surrounding the practical usage of these techniques. To address this, a survey was conducted on the top 150 construction companies and 100 construction consultancies in the UK aimed at identifying common project control practices and factors inhibiting effective project control in practice. It found that despite the vast application of control techniques a high proportion of respondents still experienced cost and time overruns on a significant proportion of their projects. Analysis of the survey results concluded that more effort should be geared at the management of the identified top project control inhibiting factors. This paper has outlined some measures for mitigating these inhibiting factors so that the outcome of project time and cost control can be improved in practice.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Wider scientific community now accept that the threat of climate change as real and thus acknowledge the importance of implementing adaptation measures in a global context. In the UK , the physical effects of climate change are likely to be directly felt in the form of extreme weather events, which are predicted to escalate in number and severity in future under the changing climatic conditions. Construction industry; which consists of supply chains running across various other industries, economies and regions, will also be affected due to these events. Thus, it is important that the construction organisations are well prepared to withstand the effects of extreme weather events not only directly affecting their organisations but also affecting their supply chains which in turn might affect the organisation concerned. Given the fact that more than 99% of construction sector businesses are SMEs, the area can benefit significantly from policy making to improve SME resilience and coping capacity. This paper presents the literature review and synthesis of a doctoral research study undertaken to address the issue of extreme weather resilience of construction sector SMEs and their supply chains. The main contribution of the paper to both academia and practitioners is a synthesis model that conceptualises the factors that enhances resilience of SMEs and their supply chains against extreme weather events. This synthesis model forms the basis of a decision making framework that will enable SMEs to both reduce their vulnerability and enhance their coping capacity against extreme weather. The value of this paper is further extended by the overall research design that is set forth as the way forward.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Determining an appropriate research methodology is considered as an important element in a research study; especially in a doctoral research study. It involves approach to the entire process of a research study, starting from theoretical underpinnings and spanning to data collection and analysis, and extending to developing the solutions for the problems investigated. Research methodology in essence is focused around the problems to be investigated in a research study and therefore varies according to the problems investigated. Thus, identifying the research methodology that best suits a research in hand is important, not only as it will benefit achieving the set objectives of a research, but also as it will serve establishing the credibility of the work. Research philosophy, approach, strategy, choice, and techniques are inherent components of the methodology. Research strategy provides the overall direction of the research including the process by which the research is conducted. Case study, experiment, survey, action research, grounded theory and ethnography are examples for such research strategies. Case study is documented as an empirical inquiry that investigates a contemporary phenomenon within its real-life context, especially when the boundaries between phenomenon and context are not clearly evident. Case study was adopted as the overarching research strategy, in a doctoral study developed to investigate the resilience of construction Small and Medium-sized Enterprises (SMEs) in the UK to extreme weather events. The research sought to investigate how construction SMEs are affected by EWEs, respond to the risk of EWEs, and means of enhancing their resilience to future EWEs. It is argued that utilising case study strategy will benefit the research study, in achieving the set objectives of the research and answering the research questions raised, by comparing and contrasting with the alternative strategies available. It is also claimed that the selected strategy will contribute towards addressing the call for improved methodological pluralism in construction management research, enhancing the understanding of complex network of relationships pertinent to the industry and the phenomenon being studied.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Projections into future increasingly suggest that the intensity and frequency of Extreme Weather Events (EWEs) will increase in the future. This has demanded the business organisations as well to be prepared to face the increasing risk of EWEs, in order to ensure their business continuity. However, current evidence base suggests that businesses, especially SMEs, are not adequately prepared to face the threat of such events. Ability to adequately prepare them has been hindered by the lack of in depth studies addressing this issue. The paper presents a doctoral study designed to investigate the resilience of SMEs operating in the construction sector; which is said to be a highly vulnerable sector for the impacts of EWEs, and their supply chains to EWEs. A conceptual framework developed to investigate this issue is presented and explained. It is argued that the resilience of construction SMEs and their supply chains against EWEs can be improved by a combination of reducing their vulnerability, enhancing coping capacity and implementing coping mechanisms. Importance of undertaking a broader view to include the whole supply chain in making business decisions with regard to EWEs by SMEs is also highlighted.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Determining an appropriate research methodology is considered as an important element in a research study; especially in a doctoral research study. It involves approach to the entire process of a research study, starting from theoretical underpinnings and spanning to data collection and analysis, and extending to developing the solutions for the problems investigated. Research methodology in essence is focused around the problems to be investigated in a research study and therefore varies according to the problems investigated. Thus, identifying the research methodology that best suits a research in hand is important, not only as it will benefit achieving the set objectives of a research, but also as it will serve establishing the credibility of the work. Research philosophy, approach, strategy, choice, and techniques are inherent components of the methodology. Research strategy provides the overall direction of the research including the process by which the research is conducted. Case study, experiment, survey, action research, grounded theory and ethnography are examples for such research strategies. Case study is documented as an empirical inquiry that investigates a contemporary phenomenon within its real-life context, especially when the boundaries between phenomenon and context are not clearly evident. Case study was adopted as the overarching research strategy, in a doctoral study developed to investigate the resilience of construction Small and Medium-sized Enterprises (SMEs) in the UK to extreme weather events. The research sought to investigate how construction SMEs are affected by EWEs, respond to the risk of EWEs, and means of enhancing their resilience to future EWEs. It is argued that utilising case study strategy will benefit the research study, in achieving the set objectives of the research and answering the research questions raised, by comparing and contrasting with the alternative strategies available. It is also claimed that the selected strategy will contribute towards addressing the call for improved methodological pluralism in construction management research, enhancing the understanding of complex network of relationships pertinent to the industry and the phenomenon being studied.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Weather extremes have created a considerable impact on Small and Medium-sized Enterprises (SMEs) in the UK during the recent years, especially on SMEs in the construction sector. Evidence in relation to the recent weather extremes have demonstrated that SMEs are some of the worst impacted by the Extreme Weather Events (EWEs) and have confirmed them as a highly vulnerable section of the UK economy to the impact of extreme weather. This is of particular importance to the construction industry, as an overarching majority of construction companies are SMEs who account for the majority of employment and income generation within the industry. Whilst construction has been perceived as a sector significantly vulnerable to the impacts of EWEs, there is scant evidence of how construction SMEs respond to such events and cope with their impact. Based on the evidence emerged from case studies of construction SMEs, current coping strategies of construction SMEs were identified. Some of the strategies identified were focused at organisational level whereas others were focused at project level. Further, some of the strategies were general risk management / business continuity strategies whereas others have been specifically developed to address the risk of EWEs. Accordingly, coping strategies can be broadly categorised based on their focus; i.e. those focused at project or organisational level, and based on the risks that they seek to address; i.e. business / continuity risks in general or EWE risk specifically. By overlapping these two aspects; their focus and risks that they seek to address, four categories of coping strategies can be devised. There are; general risk management strategies focused at business level, general risk management strategies focused at project level, EWE specific strategies focused at business level, and EWE specific strategies focused at project level. It is proposed that for a construction SME to effectively cope with the impact of EWEs and develop their resilience against EWEs a rich mix of these coping strategies are required to suite the particular requirements of the business.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose Small and Medium-sized Enterprises (SMEs), which form a significant portion in many economies, are some of the most vulnerable to the impact of Extreme Weather Events (EWEs). This is of particular importance to the construction industry, as an overarching majority of construction companies are SMEs who account for the majority of employment and income generation within the industry. In the UK, previous research has identified construction SMEs as some of the worst affected by EWEs. Design/methodology/approach Given the recent occurrences of EWEs and predictions suggesting increases in both the intensity and frequency of EWEs in the future, improving the resilience of construction SMEs is vital for achieving a resilient construction industry. A conceptual framework is first developed which is then populated and expanded based on empirical evidence. Positioned within a pragmatic research philosophy, case study research strategy was adopted as the overall research strategy in undertaking this investigation. Findings Based on the findings of two in-depth case studies of construction SMEs, a framework was developed to represent EWE resilience of construction SMEs, where resilience was seen as a collective effect of vulnerability, coping strategies and coping capacities of SMEs, characteristics of the EWE and the wider economic climate. Originality/value The paper provides an original contribution towards the overarching agenda of the resilience of SMEs, and policy making in the area of EWE risk management by presenting a novel conceptual framework depicting the resilience of medium-sized construction companies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Small and Medium-sized construction Enterprises (construction SMEs) in Thailand face challenges like high fragmented structure and low productivity. Many industries improved their business performance using the supply chain integration. This research was conducted by interviewing 14 small and medium Thai building contractors to understand the features and relationship characteristics of the supply chain of construction SMEs. The study reveals that the linkages between the small and medium general contractors and other supply chain members are based on personal trust rather than contract laws, there is no systematic procedure to manage the relationship with clients during the project execution, and social connections help to maintain long-term relationship with clients. Based on the working behaviour and commitment to long-term relationship, six forms of relationship with supply side members are proposed. Finally, improvement measures for the supply chain integration of the construction SMEs in Thailand are presented.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The thesis addresses the economic impacts of construction safety in Greece. The research involved the development of a methodology for determining the overall costs of safety, namely the sum of the costs of accidents and the costs of safety management failures (with or without accident) including image cost. Hitherto, very little work has been published on the cost of accidents in practical case studies. Moreover, to the author’s belief, no research has been published that seeks to determine in real cases the costs of prevention. The methodology developed is new, transparent, and capable of being replicated and adapted to other employment sectors and to other countries. The methodology was applied to three construction projects in Greece to test the safety costing methodology and to offer some preliminary evidence on the business case for safety. The survey work took place between 1999 and 2001 and involved 27 months of costing work on site. The study focuses on the overall costs of safety that apply to the main (principal) contractor. The methodology is supported by 120 discrete cost categories, and systematic criteria for determining which costs are included (counted) in the overall cost of safety. A quality system (in compliance with ISO9000 series) was developed to support the work and ensure accuracy of data gathering. The results of the study offer some support for the business case for safety. Though they offer good support for the economics of safety as they demonstrate need for cost effectiveness. Subject to important caveats, those projects that appeared to manage safety more cost-effectively achieved the lowest overall safety cost. Nevertheless, results are significantly lower than of other published works for two main reasons; first costs due to damages with no potential to injury were not included and second only costs to main constructor were considered. Study’s results are discussed and compared with other publish works.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In 1974 Dr D M Bramwell published his research work at the University of Aston a part of which was the establishment of an elemental work study data base covering drainage construction. The Transport and Road Research Laboratory decided to, extend that work as part of their continuing research programme into the design and construction of buried pipelines by placing a research contract with Bryant Construction. This research may be considered under two broad categories. In the first, site studies were undertaken to validate and extend the data base. The studies showed good agreement with the existing data with the exception of the excavation trench shoring and pipelaying data which was amended to incorporate new construction plant and methods. An inter-active on-line computer system for drainage estimating was developed. This system stores the elemental data, synthesizes the standard time of each drainage operation and is used to determine the required resources and construction method of the total drainage activity. The remainder of the research was into the general topic of construction efficiency. An on-line command driven computer system was produced. This system uses a stochastic simulation technique, based on distributions of site efficiency measurements to evaluate the effects of varying performance levels. The analysis of this performance data quantities the variability inherent in construction and demonstrates how some of this variability can be reconciled by considering the characteristics of a contract. A long term trend of decreasing efficiency with contract duration was also identified. The results obtained from the simulation suite were compared to site records collected from current contracts. This showed that this approach will give comparable answers, but these are greatly affected by the site performance parameters.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Aquaporins and aquaglyceroporins mediate the transport of water and solutes across biological membranes. Saccharomyces cerevisiae Fps1 is an aquaglyceroporin that mediates controlled glycerol export during osmoregulation. The transport function of Fps1 is rapidly regulated by osmotic changes in an apparently unique way and distinct regions within the long N- and C-terminal extensions are needed for this regulation. In order to learn more about the mechanisms that control Fps1 we have set up a genetic screen for hyperactive Fps1 and isolated mutations in 14 distinct residues, all facing the inside of the cell. Five of the residues lie within the previously characterized N-terminal regulatory domain and two mutations are located within the approach to the first transmembrane domain. Three mutations cause truncation of the C-terminus, confirming previous studies on the importance of this region for channel control. Furthermore, the novel mutations identify two conserved residues in the channel-forming B-loop as critical for channel control. Structural modelling-based rationalization of the observed mutations supports the notion that the N-terminal regulatory domain and the B-loop could interact in channel control. Our findings provide a framework for further genetic and structural analysis to better understand the mechanism that controls Fps1 function by osmotic changes.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The paper explores gender relations in academia and discusses how gender is constructed within academic institutions. It is based upon the study of a business school, part of a British university. The construction of gender relations within this institution was of special interest because the majority of managerial roles were occupied by women. All female academic managers (dean, associate deans and heads of department) and a random selection of female and male academics were interviewed. The process of construction of gender relations is investigated through the analysis of the discrepancy between the ‘masculine culture’ of high education institutions and the dominance of women managers within this organization. It is suggested that the numerical dominance of women managers may create tensions between their individual identities as women and their managerial identities, due to the predominance of masculine practices and values within the organization. Additionally, it emerged that the maintenance of masculine ideals and practices is also associated with downplaying women’s achievements.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Much research is currently centred on the detection of damage in structures using vibrational data. The work presented here examined several areas of interest in support of a practical technique for identifying and locating damage within bridge structures using apparent changes in their vibrational response to known excitation. The proposed goals of such a technique included the need for the measurement system to be operated on site by a minimum number of staff and that the procedure should be as non-invasive to the bridge traffic-flow as possible. Initially the research investigated changes in the vibrational bending characteristics of two series of large-scale model bridge-beams in the laboratory and these included ordinary-reinforced and post-tensioned, prestressed designs. Each beam was progressively damaged at predetermined positions and its vibrational response to impact excitation was analysed. For the load-regime utilised the results suggested that the infuced damage manifested itself as a function of the span of a beam rather than a localised area. A power-law relating apparent damage with the applied loading and prestress levels was then proposed, together with a qualitative vibrational measure of structural damage. In parallel with the laboratory experiments a series of tests were undertaken at the sites of a number of highway bridges. The bridges selected had differing types of construction and geometric design including composite-concrete, concrete slab-and-beam, concrete-slab with supporting steel-troughing constructions together with regular-rectangular, skewed and heavily-skewed geometries. Initial investigations were made of the feasibility and reliability of various methods of structure excitation including traffic and impulse methods. It was found that localised impact using a sledge-hammer was ideal for the purposes of this work and that a cartridge `bolt-gun' could be used in some specific cases.