8 resultados para Property plant equipment
em Aston University Research Archive
Resumo:
This research investigates technology transfer (TT) to developing countries, with specific reference to South Africa. Particular attention is paid to physical asset management, which includes the maintenance of plant, equipment and facilities. The research is case based, comprising a main case study (the South African electricity utility, Eskom) and four mini-cases. A five level framework adapted from Salami and Reavill (1997) is used as the methodological basis for the formulation of the research questions. This deals with technology selection, and management issues including implementation and maintenance and evaluation and modifications. The findings suggest the Salami and Reavill (1997) framework is a useful guide for TT. The case organisations did not introduce technology for strategic advantage, but to achieve operational efficiencies through cost reduction, higher quality and the ability to meet customer demand. Acquirers favour standardised technologies with which they are familiar. Cost-benefit evaluations have limited use in technology acquisition decisions. Users rely on supplier expertise to compensate for poor education and technical training in South Africa. The impact of political and economic factors is more evident in Eskom than in the mini-cases. Physical asset management follows traditional preventive maintenance practices, with limited use of new maintenance management thinking. Few modifications of the technology or R&D innovations take place. Little use is made of explicit knowledge from computerised maintenance management systems. Low operating and maintenance skills are not conducive to the transfer of high-technology equipment. South African organisations acquire technology as items of plant, equipment and systems, but limited transfer of technology takes place. This suggests that operators and maintainers frequently do not understand the underlying technology, and like workers elsewhere, are not always inclined towards adopting technology in the workplace.
Resumo:
Off-highway motive plant equipment is costly in capital outlay and maintenance. To reduce these overheads and increase site safety and workrate, a technique of assessing and limiting the velocity of such equipment is required. Due to the extreme environmental conditions met on such sites, conventional velocity measurement techniques are inappropriate. Ogden Electronics Limited were formed specifically to manufacture a motive plant safety system incorporating a speed sensor and sanction unit; to date, the only such commercial unit available. However, problems plague the reliability, accuracy and mass production of this unit. This project assesses the company's exisiting product, and in conjunction with an appreciation of the company history and structure, concludes that this unit is unsuited to its intended application. Means of improving the measurement accuracy and longevity of this unit, commensurate with the company's limited resources and experience, are proposed, both for immediate retrofit and for longer term use. This information is presented in the form of a number of internal reports for the company. The off-highway environment is examined; and in conjunction with an evaluation of means of obtaining a returned signal, comparisons of processing techniques, and on-site gathering of previously unavailable data, preliminary designs for an alternative product are drafted. Theoretical aspects are covered by a literature review of ground-pointing radar, vehicular radar, and velocity measuring systems. This review establishes and collates the body of knowledge in areas previously considered unrelated. Based upon this work, a new design is proposed which is suitable for incorporation into the existing company product range. Following production engineering of the design, five units were constructed, tested and evaluated on-site. After extended field trials, this design has shown itself to possess greater accuracy, reliability and versatility than the existing sensor, at a lower unit cost.
Resumo:
In order to increase the capacity of the existing Low Voltage grid, one solution is to increase the nominal residential network voltage from 230 V to 300 V, which is easily accommodated within the voltage rating of existing infrastructure such as cabling. A power electronic AC-AC converter would then be used to step the voltage back down to 230 V at an individual property. Such equipment could also be used to provide power quality improvements on both the utility and customer side of the converter depending on its topology. This paper provides an overview of a project which is looking at the development of such a device. The project is being carried out in collaboration with the local UK, Distribution Network Operator (DNO).
Resumo:
A proposal to increase the existing residential LV grid voltage from 230 V to 300 V has been made in order to increase existing network capacity. A power-electronic AC-AC converter is then used to provide 230 V at each property. The equipment can also provide power-quality improvements to the network and load. Several constraints such as temperature rise at the converter location lead to a converter design requiring very high efficiency. In this paper different AC/AC converter topologies are presented which compares the power quality benefits, size and efficiency of each converter. The design and the control technique of the most suitable topology are verified using simulation and preliminary experimentally results of prototype hardware are also included. © 2013 IEEE.
Resumo:
DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT
Resumo:
Proper maintenance of plant items is crucial for the safe and profitable operation of process plants, The relevant maintenance policies fall into the following four categories: (i) preventivejopportunistic/breakdown replacement policies, (ii) inspection/inspection-repair-replacernent policies, (iii) restorative maintenance policies, and (iv) condition based maintenance policies, For correlating failure times of component equipnent and complete systems, the Weibull failure distribution has been used, A new powerful method, SEQLIM, has been proposed for the estimation of the Weibull parameters; particularly, when maintenance records contain very few failures and many successful operation times. When a system consists of a number of replaceable, ageing components, an opporturistic replacernent policy has been found to be cost-effective, A simple opportunistic rrodel has been developed. Inspection models with various objective functions have been investigated, It was found that, on the assumption of a negative exponential failure distribution, all models converge to the same optimal inspection interval; provided the safety components are very reliable and the demand rate is low, When deterioration becomes a contributory factor to same failures, periodic inspections, calculated from above models, are too frequent, A case of safety trip systems has been studied, A highly effective restorative maintenance policy can be developed if the performance of the equipment under this category can be related to some predictive modelling. A novel fouling model has been proposed to determine cleaning strategies of condensers, Condition-based maintenance policies have been investigated. A simple gauge has been designed for condition monitoring of relief valve springs. A typical case of an exothermic inert gas generation plant has been studied, to demonstrate how various policies can be applied to devise overall maintenance actions.
Resumo:
A study has been made of the dynamic behaviour of a nuclear fuel reprocessing plant utilising pulsed solvent extraction columns. A flowsheet is presented and the choice of an extraction device is discussed. The plant is described by a series of modules each module representing an item of equipment. Each module consists of a series of differential equations describing the dynamic behaviour of the equipment. The model is written in PMSP, a language developed for dynamic simulation models. The differential equations are solved to predict plant behaviour with time. The dynamic response of the plant to a range of disturbances has been assessed. The interactions between pulsed columns have been demonstrated and illustrated. The importance of auxillary items of equipment to plant performance is demonstrated. Control of the reprocessing plant is considered and the effect of control parameters on performance assessed.
Resumo:
The thesis describes the work carried out to develop a prototype knowledge-based system 'KBS-SETUPP' to generate process plans for the manufacture of seamless tubes. The work is specifically related to a plant in which hollows are made from solid billets using a rotary piercing process and then reduced to required size and finished properties using the fixed plug cold drawing process. The thesis first discusses various methods of tube production in order to give a general background of tube manufacture. Then a review of the automation of the process planning function is presented in terms of its basic sub-tasks and the techniques and suitability of a knowledge-based system is established. In the light of such a review and a case study, the process planning problem is formulated in the domain of seamless tube manufacture, its basic sub-tasks are identified and capabilities and constraints of the available equipment in the specific plant are established. The task of collecting and collating the process planning knowledge in seamless tube manufacture is discussed and is mostly fulfilled from domain experts, analysing of existing manufacturing records specific to plant, textbooks and applicable Standards. For the cold drawing mill, tube-drawing schedules have been rationalised to correspond with practice. The validation of such schedules has been achieved by computing the process parameters and then comparing these with the drawbench capacity to avoid over-loading. The existing models cannot be simulated in the computer program as such, therefore a mathematical model has been proposed which estimates the process parameters which are in close agreement with experimental values established by other researchers. To implement the concepts, a Knowledge-Based System 'KBS- SETUPP' has been developed on Personal Computer using Turbo- Prolog. The system is capable of generating process plans, production schedules and some additional capabilities to supplement process planning. The system generated process plans have been compared with the actual plans of the company and it has been shown that the results are satisfactory and encouraging and that the system has the capabilities which are useful.