21 resultados para Project performance

em Aston University Research Archive


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Purpose – The purpose of the paper was to conduct an empirical investigation to explore the impact of project management maturity models (PMMMs) on improving project performance. Design/methodology/approach – The investigation used a cross-case analysis involving over 90 individuals in seven organisations. Findings – The findings of the empirical investigation indicate that PMMMs demonstrate very high levels of variability in individual's assessment of project management maturity. Furthermore, at higher levels of maturity, the type of performance improvement adopted following their application is related to the type of PMMM used in the assessment. The paradox of the unreliability of PMMMs and their widespread acceptance is resolved by calling upon the “wisdom of crowds” phenomenon which has implications for the use of maturity model assessments in other arena. Research limitations/implications – The investigation does have the usual issues associated with case research, but the steps that have been taken in the cross-case construction and analysis have improved the overall robustness and extendibility of the findings. Practical implications – The tendency for PMMMs to shape improvements based on their own inherent structure needs further understanding. Originality/value – The use of empirical methods to investigate the link between project maturity models and extant changes in project management performance is highly novel and the findings that result from this have added resonance.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Eight steps for projectizing continuous improvement to deliver desired change

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This project is focused on exchanging knowledge between ABS, UKBI and managers of business incubators in the UK. The project relates to exploitation of extant knowledge-base on assessing and improving business incubation management practice and performance and builds on two earlier studies. It addresses a pressing need for assessing and benchmarking business incubation input, process and outcome performance and highlighting best practice. The overarching aim of this project was to obtain proof-of-concept for a business incubation performance assessment and benchmarking online tool, fine-tune it and put it in use by nurturing a community of business incubation management practice, aligned by the resultant tool. The purpose was to offer an appropriate set of measures, in areas identified by relevant research on business incubation performance management and impact as critical, against which: 1.The input and process performance of business incubation management practice can be assessed and benchmarked within the auspices of a community of incubator managers concerned with best practice 2.The outcome performance and impact of business incubators can be assessed longitudinally. As such, the developed online assessment framework is geared towards the needs of researchers, policy makers and practitioners concerned with business incubation performance, added value and impact.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The amplification of demand variation up a supply chain widely termed ‘the Bullwhip Effect’ is disruptive, costly and something that supply chain management generally seeks to minimise. Originally attributed to poor system design; deficiencies in policies, organisation structure and delays in material and information flow all lead to sub-optimal reorder point calculation. It has since been attributed to exogenous random factors such as: uncertainties in demand, supply and distribution lead time but these causes are not exclusive as academic and operational studies since have shown that orders and/or inventories can exhibit significant variability even if customer demand and lead time are deterministic. This increase in the range of possible causes of dynamic behaviour indicates that our understanding of the phenomenon is far from complete. One possible, yet previously unexplored, factor that may influence dynamic behaviour in supply chains is the application and operation of supply chain performance measures. Organisations monitoring and responding to their adopted key performance metrics will make operational changes and this action may influence the level of dynamics within the supply chain, possibly degrading the performance of the very system they were intended to measure. In order to explore this a plausible abstraction of the operational responses to the Supply Chain Council’s SCOR® (Supply Chain Operations Reference) model was incorporated into a classic Beer Game distribution representation, using the dynamic discrete event simulation software Simul8. During the simulation the five SCOR Supply Chain Performance Attributes: Reliability, Responsiveness, Flexibility, Cost and Utilisation were continuously monitored and compared to established targets. Operational adjustments to the; reorder point, transportation modes and production capacity (where appropriate) for three independent supply chain roles were made and the degree of dynamic behaviour in the Supply Chain measured, using the ratio of the standard deviation of upstream demand relative to the standard deviation of the downstream demand. Factors employed to build the detailed model include: variable retail demand, order transmission, transportation delays, production delays, capacity constraints demand multipliers and demand averaging periods. Five dimensions of supply chain performance were monitored independently in three autonomous supply chain roles and operational settings adjusted accordingly. Uniqueness of this research stems from the application of the five SCOR performance attributes with modelled operational responses in a dynamic discrete event simulation model. This project makes its primary contribution to knowledge by measuring the impact, on supply chain dynamics, of applying a representative performance measurement system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The n-tuple recognition method is briefly reviewed, summarizing the main theoretical results. Large-scale experiments carried out on Stat-Log project datasets confirm this method as a viable competitor to more popular methods due to its speed, simplicity, and accuracy on the majority of a wide variety of classification problems. A further investigation into the failure of the method on certain datasets finds the problem to be largely due to a mismatch between the scales which describe generalization and data sparseness.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Effective management of projects is becoming increasingly important for any type of organization to remain competitive in today’s dynamic business environment due to pressure of globalization. The use of benchmarking is widening as a technique for supporting project management. Benchmarking can be described as the search for the best practices, leading to the superior performance of an organization. However, effectiveness of benchmarking depends on the use of tools for collecting and analyzing information and deriving subsequent improvement projects. This study demonstrates how analytic hierarchy process (AHP), a multiple attribute decision-making technique, can be used for benchmarking project management practices. The entire methodology has been applied to benchmark project management practice of Caribbean public sector organizations with organizations in the Indian petroleum sector, organizations in the infrastructure sector of Thailand and the UK. This study demonstrates the effectiveness of a proposed benchmarking model using AHP, determines problems and issues of Caribbean project management in the public sector and suggests improvement measures for effective project management.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Indian petroleum industry is passing through a very dynamic business environment due to the liberalisation of many government policies, vertical integration among organisations and the presence of multinational companies. This caused a competitive environment among the organisations in the Indian petroleum industry in the public sector. Effective project management for developing new infrastructures and maintaining the existing facilities has been considered one of the means for remaining competitive in this business environment. However, present project management practices suffer from many shortcomings, as time, cost and quality non-achievements are part and parcel of almost every project. This study focuses on identifying the issues in managing projects of the organisation in the Indian petroleum sector with the involvement of the executives in a workshop environment. This also suggests some remedial measures for resolving those issues through identifying critical success factors and enablers. The enablers not only resolve the present issues but also ensure superior performance. These are analysed in a quantitative framework to derive improvement measures in project management practices.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Healthcare professionals routinely deploy various quality management tools and techniques in order to improve performance of healthcare delivery. However, they are characterised by fragmented approach i.e., they are not linked with the strategic intent of the organisation. This study introduces a holistic quality improvement method, which integrates all quality improvement projects with the strategic intent of the healthcare organisations. It first identifies a healthcare system and its environment. The Strengths, Weaknesses, Opportunities and Threats (SWOT) of the system are then derived with the involvement of the concerned stakeholders. This leads to developing the strategies in order to satisfy customers in line with the organisation's competitive position. These strategies help identify a few projects, the implementation of which ensures achievement of desired quality. The projects are then prioritised with the involvement of the concerned stakeholders and implemented in order to improve the system performance. The effectiveness of the method has been demonstrated using a case study of an intensive care unit at the Eric Williams Medical Sciences Complex Hospital in Trinidad. Copyright © 2007 Inderscience Enterprises Ltd.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper is based upon the findings of a CIMA research project into the way which corporate performance is affected by the performance measurement system adopted. It compares and contrasts the techniques in use in a sample of large companies that use a variety of techniques. We have classified these techniques into 3 types: • Value based management techniques • Stakeholder management techniques • Traditional accounting techniques. The analysis traces the interactions between corporate objectives, decision making criteria, performance measurement systems, and executive incentive schemes in order to develop an understanding of the effects of such techniques upon corporate performance. This paper seeks to provide some answers to the following two questions: • What approach leads to superior performance for a firm? • What is different between these approaches when they are used in practice, as distinct from theory? In doing so we have drawn upon both contingency theory and sociobiology theory to develop a framework for understanding the relationship between the choke of performance measurement system and the resulting performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Whole life costing (WLC) has become the best practice in construction procurement and it is likely to be a major issue in predicting whole life costs of a construction project accurately. However, different expectations from different organizations throughout a project's life and the lack of data, monitoring targets, and long-term interest for many key players are obstacles to be overcome if WLC is to be implemented. A questionnaire survey was undertaken to investigate a set of ten common factors and 188 individual factors. These were grouped into eight critical categories (project scope, time, cost, quality, contract/administration, human resource, risk, and health and safety) by project phase, as perceived by the clients, contractors and subcontractors in order to identify critical success factors for whole life performance assessment (WLPA). Using a relative importance index, the top ten critical factors for each category, from the perspective of project participants, were analyzed and ranked. Their agreement on those categories and factors were analyzed using Spearman's rank correlation. All participants identify “Type of Project” as the most common critical factor in the eight categories for WLPA. Using the relative index ranking technique and weighted average methods, it was found that the most critical individual factors in each category were: “clarity of contract” (scope); “fixed construction period” (time); “precise project budget estimate” (cost); “material quality” (quality); “mutual/trusting relationships” (contract/administration); “leadership/team management” (human resource); and “management of work safety on site” (health and safety). There was relatively a high agreement on these categories among all participants. Obviously, with 80 critical factors of WLPA, there is a stronger positive relationship between client and contactor rather than contractor and subcontractor, client and subcontractor. Putting these critical factors into a criteria matrix can facilitate an initial framework of WLPA in order to aid decision making in the public sector in South Korea for evaluation/selection process of a construction project at the bid stage.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Currently over 50 million people worldwide wear contact lenses, of which over 75% wear hydrogel lenses. Significant deposition occurs in approximately 80% of hydrogel lenses and many contact lens wearers cease wearing lenses due to problems associated with deposition. The contact lens field is not alone in encountering complications associated with interactions between the body and artificial devices. The widespread use of man-made materials to replace structures in the body has emphasised the importance of studies that examine the interactions between implantation materials and body tissues.This project used carefully controlled, randomized clinical studies to study the interactive effects of contact lens materials, care systems, replacement periods and patient differences. Of principal interest was the influence of these factors on material deposition and their subsequent impact on subjective performance. A range of novel and established analytical techniques were used to examine hydrogel lenses following carefully controlled clinical studies in which clinical performance was meticulously monitored. These studies established the inter-relationship between clinical performance and deposition to be evaluated. This project showed that significant differences exist between individuals in their ability to deposit hydrogel lenses, with approximately 20% of subjects displaying significant deposition irrespective of the lens material. Additionally, materials traditionally categorised together show markedly different spoilation characteristics, which are wholly attributable to their detailed chemical structure. For the first time the in vivo deposition kinetics of both protein and lipid in charged and uncharged polymers was demonstrated. In addition the importance of care systems in the deposition process was shown, clearly demonstrating the significance of the quality rather than the quantity of deposition in influencing subjective performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The recording of visual acuity using the Snellen letter chart is only a limited measure of the visual performance of an eye wearing a refractive aid. Qualitative in addition to quantitative information is required to establish such a parameter: spatial, temporal and photometric aspects must all be incorporated into the test procedure. The literature relating to the correction of ametropia by refractive aids was reviewed. Selected aspects of a comparison between the correction provided by spectacles and contact lenses were considered. Special attention was directed to soft hydrophilic contact lenses. Despite technological advances which have produced physiologically acceptable soft lenses, there still remain associated with this recent form of refractive aid unpredictable visual factors. Several techniques for vision assessment were described, and previous studies of visual performance were discussed. To facilitate the investigation of visual performance in a clinical environment, a new semi-automated system was described: this utilized the presentation of broken ring test stimuli on a television screen. The research project comprised two stages. Initial work was concerned with the validation of the television system, including the optimization of its several operational variables. The second phase involved the utilization of the system in an investigation of visual performance aspects of the first month of regular daily soft contact lens wear by experimentally-naive subjects. On the basis of the results of this work an ‘homoeostatic’ model has been proposed to represent the strategy which an observer adopts in order to optimize his visual performance with soft contact lenses.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Despite the availability of various control techniques and project control software many construction projects still do not achieve their cost and time objectives. Research in this area so far has mainly been devoted to identifying causes of cost and time overruns. There is limited research geared towards studying factors inhibiting the ability of practitioners to effectively control their projects. To fill this gap, a survey was conducted on 250 construction project organizations in the UK, which was followed by face-to-face interviews with experienced practitioners from 15 of these organizations. The common factors that inhibit both time and cost control during construction projects were first identified. Subsequently 90 mitigating measures have been developed for the top five leading inhibiting factors—design changes, risks/uncertainties, inaccurate evaluation of project time/duration, complexities and non-performance of subcontractors were recommended. These mitigating measures were classified as: preventive, predictive, corrective and organizational measures. They can be used as a checklist of good practice and help project managers to improve the effectiveness of control of their projects.