4 resultados para Project method

em Aston University Research Archive


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Healthcare professionals routinely deploy various quality management tools and techniques in order to improve performance of healthcare delivery. However, they are characterised by fragmented approach i.e., they are not linked with the strategic intent of the organisation. This study introduces a holistic quality improvement method, which integrates all quality improvement projects with the strategic intent of the healthcare organisations. It first identifies a healthcare system and its environment. The Strengths, Weaknesses, Opportunities and Threats (SWOT) of the system are then derived with the involvement of the concerned stakeholders. This leads to developing the strategies in order to satisfy customers in line with the organisation's competitive position. These strategies help identify a few projects, the implementation of which ensures achievement of desired quality. The projects are then prioritised with the involvement of the concerned stakeholders and implemented in order to improve the system performance. The effectiveness of the method has been demonstrated using a case study of an intensive care unit at the Eric Williams Medical Sciences Complex Hospital in Trinidad. Copyright © 2007 Inderscience Enterprises Ltd.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Objective: To measure changes in dispensing activity in a UK repeat dispensing pilot study and to estimate any associated cost savings. Method: Patients were provided with two successive three-monthly repeat prescriptions containing all of the items on their "repeat medicines list" and valid at a study pharmacy. Pharmacists consulted with patients at the time of supply and completed a patient-monitoring form. Prescriptions with pricing data were returned by the UK Prescription Pricing Authority. These data were used to calculate dispensing activity, the cost of dispensed items and an estimate of cost savings on non-dispensed items. A retrospective identification of items prescribed during the six months prior to the project was used to provide a comparison with those dispensed during the project and thus a more realistic estimate of changes. Setting: 350 patients from two medical practices in a large English City, with inner city and suburban locations, and served by seven pharmacies. Key findings: There were methodological challenges in establishing a robust framework for calculating changes. Based on all of the items that patients could have obtained from their repeat list, 23.8% were not dispensed during the intervention period. A correction was then made to allow for a comparison with usage in the six months prior to the study. Based on the corrected data, there was an estimated 11.3% savings in drug costs compared with the pre-intervention period. There was a marked difference in changes between the two practices, the pharmacies and individual patients. The capitation-based remuneration method was acceptable to all but one of the community pharmacists. Conclusion: The repeat dispensing system reduced dispensing volume in comparison with the control period. A repeat dispensing system with a focus on patients' needs and their use of medicines might be cost neutral.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Renewable energy project development is highly complex and success is by no means guaranteed. Decisions are often made with approximate or uncertain information yet the current methods employed by decision-makers do not necessarily accommodate this. Levelised energy costs (LEC) are one such commonly applied measure utilised within the energy industry to assess the viability of potential projects and inform policy. The research proposes a method for achieving this by enhancing the traditional discounting LEC measure with fuzzy set theory. Furthermore, the research develops the fuzzy LEC (F-LEC) methodology to incorporate the cost of financing a project from debt and equity sources. Applied to an example bioenergy project, the research demonstrates the benefit of incorporating fuzziness for project viability, optimal capital structure and key variable sensitivity analysis decision-making. The proposed method contributes by incorporating uncertain and approximate information to the widely utilised LEC measure and by being applicable to a wide range of energy project viability decisions. © 2013 Elsevier Ltd. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The aim of this study is to address the main deficiencies with the prevailing project cost and time control practices for construction projects in the UK. A questionnaire survey was carried out with 250 top companies followed by in-depth interviews with 15 experienced practitioners from these companies in order to gain further insights of the identified problems, and their experience of good practice on how these problems can be tackled. On the basis of these interviews and syntheses with literature, a list of 65 good practice recommendations have been developed for the key project control tasks: planning, monitoring, reporting and analysing. The Delphi method was then used, with the participation of a panel of 8 practitioner experts, to evaluate these improvement recommendations and to establish their degree of relevance. After two rounds of Delphi, these recommendations are put forward as "critical", "important", or "helpful" measures for improving project control practice.