7 resultados para Project managers

em Aston University Research Archive


Relevância:

70.00% 70.00%

Publicador:

Resumo:

In construction projects, the aim of project control is to ensure projects finish on time, within budget, and achieve other project objectives. During the last few decades, numerous project control methods have been developed and adopted by project managers in practice. However, many existing methods focus on describing what the processes and tasks of project control are; not on how these tasks should be conducted. There is also a potential gap between principles that underly these methods and project control practice. As a result, time and cost overruns are still common in construction projects, partly attributable to deficiencies of existing project control methods and difficulties in implementing them. This paper describes a new project cost and time control model, the project control and inhibiting factors management (PCIM) model, developed through a study involving extensive interaction with construction practitioners in the UK, which better reflects the real needs of project managers. A set of good practice checklist is also developed to facilitate implementation of the model. © 2013 American Society of Civil Engineers.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Despite the availability of various control techniques and project control software many construction projects still do not achieve their cost and time objectives. Research in this area so far has mainly been devoted to identifying causes of cost and time overruns. There is limited research geared towards studying factors inhibiting the ability of practitioners to effectively control their projects. To fill this gap, a survey was conducted on 250 construction project organizations in the UK, which was followed by face-to-face interviews with experienced practitioners from 15 of these organizations. The common factors that inhibit both time and cost control during construction projects were first identified. Subsequently 90 mitigating measures have been developed for the top five leading inhibiting factors—design changes, risks/uncertainties, inaccurate evaluation of project time/duration, complexities and non-performance of subcontractors were recommended. These mitigating measures were classified as: preventive, predictive, corrective and organizational measures. They can be used as a checklist of good practice and help project managers to improve the effectiveness of control of their projects.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The research described here concerns the development of metrics and models to support the development of hybrid (conventional/knowledge based) integrated systems. The thesis argues from the point that, although it is well known that estimating the cost, duration and quality of information systems is a difficult task, it is far from clear what sorts of tools and techniques would adequately support a project manager in the estimation of these properties. A literature review shows that metrics (measurements) and estimating tools have been developed for conventional systems since the 1960s while there has been very little research on metrics for knowledge based systems (KBSs). Furthermore, although there are a number of theoretical problems with many of the `classic' metrics developed for conventional systems, it also appears that the tools which such metrics can be used to develop are not widely used by project managers. A survey was carried out of large UK companies which confirmed this continuing state of affairs. Before any useful tools could be developed, therefore, it was important to find out why project managers were not using these tools already. By characterising those companies that use software cost estimating (SCE) tools against those which could but do not, it was possible to recognise the involvement of the client/customer in the process of estimation. Pursuing this point, a model of the early estimating and planning stages (the EEPS model) was developed to test exactly where estimating takes place. The EEPS model suggests that estimating could take place either before a fully-developed plan has been produced, or while this plan is being produced. If it were the former, then SCE tools would be particularly useful since there is very little other data available from which to produce an estimate. A second survey, however, indicated that project managers see estimating as being essentially the latter at which point project management tools are available to support the process. It would seem, therefore, that SCE tools are not being used because project management tools are being used instead. The issue here is not with the method of developing an estimating model or tool, but; in the way in which "an estimate" is intimately tied to an understanding of what tasks are being planned. Current SCE tools are perceived by project managers as targetting the wrong point of estimation, A model (called TABATHA) is then presented which describes how an estimating tool based on an analysis of tasks would thus fit into the planning stage. The issue of whether metrics can be usefully developed for hybrid systems (which also contain KBS components) is tested by extending a number of "classic" program size and structure metrics to a KBS language, Prolog. Measurements of lines of code, Halstead's operators/operands, McCabe's cyclomatic complexity, Henry & Kafura's data flow fan-in/out and post-release reported errors were taken for a set of 80 commercially-developed LPA Prolog programs: By re~defining the metric counts for Prolog it was found that estimates of program size and error-proneness comparable to the best conventional studies are possible. This suggests that metrics can be usefully applied to KBS languages, such as Prolog and thus, the development of metncs and models to support the development of hybrid information systems is both feasible and useful.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The Implementation of Enterprise Resource Planning (ERP) systems require huge investments while ineffective implementations of such projects are commonly observed. A considerable number of these projects have been reported to fail or take longer than it was initially planned, while previous studies show that the aim of rapid implementation of such projects has not been successful and the failure of the fundamental goals in these projects have imposed huge amounts of costs on investors. Some of the major consequences are the reduction in demand for such products and the introduction of further skepticism to the managers and investors of ERP systems. In this regard, it is important to understand the factors determining success or failure of ERP implementation. The aim of this paper is to study the critical success factors (CSFs) in implementing ERP systems and to develop a conceptual model which can serve as a basis for ERP project managers. These critical success factors that are called “core critical success factors” are extracted from 62 published papers using the content analysis and the entropy method. The proposed conceptual model has been verified in the context of five multinational companies.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Processing information and forming opinions pose special challenges when attempting to effectively manage the new or complex tasks that typically arise in projects. Based on research in organizational and social psychology, we introduce mechanisms and strategies for collective information processing which are important for forming opinions and handling information in projects.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In repetitive operations the productivity dilemma has been widely studied, but there is a lack of research in non-repetitive operations, such as in project-based firms. This paper investigates why project-based firms foster or hinder project flexibility through an embedded multi-case study with six projects within a large German project-based firm. The results suggest that although such firms have projects as their key source of revenue, their focus lies in longevity and survival and this logic is, in some instances, at odds with the temporary nature of the project context.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This project is focused on exchanging knowledge between ABS, UKBI and managers of business incubators in the UK. The project relates to exploitation of extant knowledge-base on assessing and improving business incubation management practice and performance and builds on two earlier studies. It addresses a pressing need for assessing and benchmarking business incubation input, process and outcome performance and highlighting best practice. The overarching aim of this project was to obtain proof-of-concept for a business incubation performance assessment and benchmarking online tool, fine-tune it and put it in use by nurturing a community of business incubation management practice, aligned by the resultant tool. The purpose was to offer an appropriate set of measures, in areas identified by relevant research on business incubation performance management and impact as critical, against which: 1.The input and process performance of business incubation management practice can be assessed and benchmarked within the auspices of a community of incubator managers concerned with best practice 2.The outcome performance and impact of business incubators can be assessed longitudinally. As such, the developed online assessment framework is geared towards the needs of researchers, policy makers and practitioners concerned with business incubation performance, added value and impact.