21 resultados para Project Read and Write
em Aston University Research Archive
Resumo:
The evaluation and selection of industrial projects before investment decision is customarily done using marketing, technical and financial information. Subsequently, environmental impact assessment and social impact assessment are carried out mainly to satisfy the statutory agencies. Because of stricter environment regulations in developed and developing countries, quite often impact assessment suggests alternate sites, technologies, designs, and implementation methods as mitigating measures. This causes considerable delay to complete project feasibility analysis and selection as complete analysis requires to be taken up again and again till the statutory regulatory authority approves the project. Moreover, project analysis through above process often results sub-optimal project as financial analysis may eliminate better options, as more environment friendly alternative will always be cost intensive. In this circumstance, this study proposes a decision support system, which analyses projects with respect to market, technicalities, and social and environmental impact in an integrated framework using analytic hierarchy process, a multiple-attribute decision-making technique. This not only reduces duration of project evaluation and selection, but also helps select optimal project for the organization for sustainable development. The entire methodology has been applied to a cross-country oil pipeline project in India and its effectiveness has been demonstrated. © 2005 Elsevier B.V. All rights reserved.
Resumo:
In construction projects, the aim of project control is to ensure projects finish on time, within budget, and achieve other project objectives. During the last few decades, numerous project control methods have been developed and adopted by project managers in practice. However, many existing methods focus on describing what the processes and tasks of project control are; not on how these tasks should be conducted. There is also a potential gap between principles that underly these methods and project control practice. As a result, time and cost overruns are still common in construction projects, partly attributable to deficiencies of existing project control methods and difficulties in implementing them. This paper describes a new project cost and time control model, the project control and inhibiting factors management (PCIM) model, developed through a study involving extensive interaction with construction practitioners in the UK, which better reflects the real needs of project managers. A set of good practice checklist is also developed to facilitate implementation of the model. © 2013 American Society of Civil Engineers.
Resumo:
The aim of this study is to address the main deficiencies with the prevailing project cost and time control practices for construction projects in the UK. A questionnaire survey was carried out with 250 top companies followed by in-depth interviews with 15 experienced practitioners from these companies in order to gain further insights of the identified problems, and their experience of good practice on how these problems can be tackled. On the basis of these interviews and syntheses with literature, a list of 65 good practice recommendations have been developed for the key project control tasks: planning, monitoring, reporting and analysing. The Delphi method was then used, with the participation of a panel of 8 practitioner experts, to evaluate these improvement recommendations and to establish their degree of relevance. After two rounds of Delphi, these recommendations are put forward as "critical", "important", or "helpful" measures for improving project control practice.
Resumo:
The evaluation and selection of industrial projects before investment decision is customarily done using marketing, technical, and financial information. Subsequently, environmental impact assessment and social impact assessment are carried out mainly to satisfy the statutory agencies. Because of stricter environment regulations in developed and developing countries, quite often impact assessment suggests alternate sites, technologies, designs, and implementation methods as mitigating measures. This causes considerable delay to complete project feasibility analysis and selection as complete analysis requires to be taken up again and again until the statutory regulatory authority approves the project. Moreover, project analysis through the above process often results in suboptimal projects as financial analysis may eliminate better options as more environment friendly alternative will always be cost intensive. In this circumstance, this study proposes a decision support system which analyses projects with respect to market, technicalities, and social and environmental impact in an integrated framework using analytic hierarchy process, a multiple attribute decision-making technique. This not only reduces duration of project evaluation and selection, but also helps select an optimal project for the organization for sustainable development. The entire methodology has been applied to a cross-country oil pipeline project in India and its effectiveness has been demonstrated. © 2008, IGI Global.
Resumo:
Purpose - The idea that knowledge needs to be codified is central to many claims that knowledge can be managed. However, there appear to be no empirical studies in the knowledge management context that examine the process of knowledge codification. This paper therefore seeks to explore codification as a knowledge management process. Design/methodology/approach - The paper draws on findings from research conducted around a knowledge management project in a section of the UK Post Office, using a methodology of participant-observation. Data were collected through observations of project meetings, correspondence between project participants, and individual interviews. Findings - The principal findings about the nature of knowledge codification are first, that the process of knowledge codification also involves the process of defining the codes needed to codify knowledge, and second, that people who participate in the construction of these codes are able to interpret and use the codes more similarly. From this it can be seen that the ability of people to decodify codes similarly places restrictions on the transferability of knowledge between them. Research limitations/implications - The paper therefore argues that a new conceptual approach is needed for the role of knowledge codification in knowledge management that emphasizes the importance of knowledge decodification. Such an approach would start with one's ability to decodify rather than codify knowledge as a prerequisite for knowledge management. Originality/value - The paper provides a conceptual basis for explaining limitations to the management and transferability of knowledge. © Emerald Group Publishing Limited.
Resumo:
The Small and Medium-sized construction Enterprises (construction SMEs) in Thailand face challenges like high fragmented structure and low productivity. Many industries improved their business performance using the supply chain integration. This research was conducted by interviewing 14 small and medium Thai building contractors to understand the features and relationship characteristics of the supply chain of construction SMEs. The study reveals that the linkages between the small and medium general contractors and other supply chain members are based on personal trust rather than contract laws, there is no systematic procedure to manage the relationship with clients during the project execution, and social connections help to maintain long-term relationship with clients. Based on the working behaviour and commitment to long-term relationship, six forms of relationship with supply side members are proposed. Finally, improvement measures for the supply chain integration of the construction SMEs in Thailand are presented.
Resumo:
The increasing demand for high capacity data storage requires decreasing the head-to-tape gap and reducing the track width. A problem very often encountered is the development of adhesive debris on the heads at low humidity and high temperatures that can lead to an increase of space between the head and media, and thus a decrease in the playback signal. The influence of stains on the playback signal of reading heads is studied using RAW (Read After Write) tests and their influence on the wear of the heads by using indentation technique. The playback signal has been found to vary and the errors to increase as stains form a patchy pattern and grow in size to form a continuous layer. The indentation technique shows that stains reduce the wear rate of the heads. In addition, the wear tends to be more pronounced at the leading edge of the head compared to the trailing one. Chemical analysis of the stains using ferrite samples in conjunction with MP (metal particulate) tapes shows that stains contain iron particles and polymeric binder transferred from the MP tape. The chemical anchors in the binder used to grip the iron particles now react with the ferrite surface to create strong chemical bonds. At high humidity, a thin layer of iron oxyhydroxide forms on the surface of the ferrite. This soft material increases the wear rate and so reduces the amount of stain present on the heads. The stability of the binder under high humidity and under high temperature as well as the chemical reactions that might occur on the ferrite poles of the heads influences the dynamic behaviour of stains. A model of stain formation taking into account the channels of binder degradation and evolution upon different environmental conditions is proposed.
Resumo:
For many decades, the Kingdom of Saudi Arabia has been widely known for being a reliable oil exporter. This fact, however, has not exempted it from facing significant domestic energy challenges. One of the most pressing of these challenges involves bridging the widening electricity supply-demand gap where, currently, the demand is growing at a very fast rate. One crucial means to address this challenge is through delivering power supply projects with maximum efficiency. Project delivery delay, however, is not uncommon in this highly capital-intensive industry, indicating electricity supplies are not coping with the demand increases. To provide a deeper insight into the challenges of project implementation and efficient practice, this research adopts a pragmatic approach by triangulating literature, questionnaires and semi-structured interviews. The research was conducted in the Saudi Arabian power supply industry – Western Operating Area. A total of 105 usable questionnaires were collected, and 28 recorded, semi-structured interviews were conducted, analysed and synthesised to produce a conceptual model of what constitutes the project implementation challenges in the investigated industry. This was achieved by conducting a comprehensive ranking analysis applied to all 58 identified and surveyed factors which, according to project practitioners in the investigated industry, contribute to project delay. 28 of these project delay factors were selected as the "most important" ones. Factor Analysis was employed to structure these 28 most important project delay factors into the following meaningful set of 7 project implementation challenges: Saudi Electricity Company's contractual commitments, Saudi Electricity Company's communication and coordination effectiveness, contractors' project planning and project control effectiveness, consultant-related aspects, manpower challenges and material uncertainties, Saudi Electricity Company's tendering system, and lack of project requirements clarity. The study has implications for industry policy in that it provides a coherent assessment of the key project stakeholders' central problems. From this analysis, pragmatic recommendations are proposed that, if enacted, will minimise the significance of the identified problems on future project outcomes, thus helping to ensure the electricity supply-demand gap is diminished.
Resumo:
The aim of this research was to improve the quantitative support to project planning and control principally through the use of more accurate forecasting for which new techniques were developed. This study arose from the observation that in most cases construction project forecasts were based on a methodology (c.1980) which relied on the DHSS cumulative cubic cost model and network based risk analysis (PERT). The former of these, in particular, imposes severe limitations which this study overcomes. Three areas of study were identified, namely growth curve forecasting, risk analysis and the interface of these quantitative techniques with project management. These fields have been used as a basis for the research programme. In order to give a sound basis for the research, industrial support was sought. This resulted in both the acquisition of cost profiles for a large number of projects and the opportunity to validate practical implementation. The outcome of this research project was deemed successful both in theory and practice. The new forecasting theory was shown to give major reductions in projection errors. The integration of the new predictive and risk analysis technologies with management principles, allowed the development of a viable software management aid which fills an acknowledged gap in current technology.
Resumo:
This study concerns the application of a model of effective interpersonal relationships to problems arising from staff assessment at I.C.I. Ltd. Corporate Laboratory between 1972 and 1974. In collaboration with academic and industrial supervision, the study commenced with a survey of management and supervisor opinions about the effectiveness of current staff (work) relationships, with particular reference to the problem of recognising and developing creative potential. This survey emphasised a need to improve the relationships between staff in the staff assessment context. A survey of research into creativity emphasised the importance of the interpersonal environment for obtaining creative behaviour in an organisation context. A further survey of theories of how interpersonal behaviour related to personal creativity (therapeutic psychology) provided a model of effective interpersonal behaviour (Carkhuff, 1969) that could be applied to the organisation context of staff assessment. The objective of the project was redefined as a need to improve the conditions of interpersonal behaviour in relation to certain (career development) problems arising from staff assessment practices. In order to demonstrate the application of the model of effective interpersonal behaviour, the research student recorded interviews between himself and members of staff designed to develop and operate the dimensions of the model. Different samples of staff were used to develop the 'facilitative' and the 'action oriented' dimensions of bahaviour, and then for the operation of a helping programme (based on vocational guidance tests). These interactions have been analysed, according to the scales of measurement in the model ana the results are presented in case study form in this thesis. At each stage of the project, results and conclusions were presented to the sponsoring organisation (e.g. industrial supervisor) in order to assess their (subjective) opinion of relevance to the organ isation. Finally, recommendations on further actions towards general improvement of the work relationships in the laboratory were presented in a brief report to the sponsor.
Resumo:
Numerous techniques have been developed to control cost and time of construction projects. However, there is limited research on issues surrounding the practical usage of these techniques. To address this, a survey was conducted on the top 150 construction companies and 100 construction consultancies in the UK aimed at identifying common project control practices and factors inhibiting effective project control in practice. It found that despite the vast application of control techniques a high proportion of respondents still experienced cost and time overruns on a significant proportion of their projects. Analysis of the survey results concluded that more effort should be geared at the management of the identified top project control inhibiting factors. This paper has outlined some measures for mitigating these inhibiting factors so that the outcome of project time and cost control can be improved in practice.
Resumo:
A considerable body of research has developed on processes of neoliberal urban regeneration and gentrifi cation. On the one hand, there are many political economy accounts emphasising the role of economic capital in processes of urban change and gentrifi cation. On the other hand, there is a wealth of governmentality studies on the art of government that fail to explain how ungovernable subjects develop. Similarly, within gentrifi cation studies there are many accounts on the role of changing consumer lifestyles and defi ning gentrifi cation, but less concern with the governance processes between actors in urban regeneration and gentrifi cation. Yet such issues are of considerable importance given the role of the state in urban regeneration and dependence on private capital. This paper utilises the French Pragmatist approach of Boltanski and Thévenot to examine a case study state-led gentrifi cation project. Boltanski and Thévenot argue that social coordination occurs by way of actors working through broader value-laden ‘worlds of justifi cation’ that underpin processes of argumentation and coordination. The examined case study is a deprived area within an English city where a major state-led gentrification programme has been introduced. The rationale for the programme is based on the assumption that reducing deprivation relies upon substantially increasing the number of higher income earners. The paper concludes that market values have overridden broader civic values in the negotiation process, with this intensifying as the state internalised market crisis tendencies within the project. More broadly, there is a need for French Pragmatism to be more sensitive to the spatial processes of social coordination, which can be achieved through critical engagement with recent concepts of ‘assemblages’.
Resumo:
We present a compact, portable and low cost generic interrogation strain sensor system using a fibre Bragg grating configured in transmission mode with a vertical-cavity surface-emitting laser (VCSEL) light source and a GaAs photodetector embedded in a polymer skin. The photocurrent value is read and stored by a microcontroller. In addition, the photocurrent data is sent via Bluetooth to a computer or tablet device that can present the live data in a real time graph. With a matched grating and VCSEL, the system is able to automatically scan and lock the VCSEL to the most sensitive edge of the grating. Commercially available VCSEL and photodetector chips are thinned down to 20 µm and integrated in an ultra-thin flexible optical foil using several thin film deposition steps. A dedicated micro mirror plug is fabricated to couple the driving optoelectronics to the fibre sensors. The resulting optoelectronic package can be embedded in a thin, planar sensing sheet and the host material for this sheet is a flexible and stretchable polymer. The result is a fully embedded fibre sensing system - a photonic skin. Further investigations are currently being carried out to determine the stability and robustness of the embedded optoelectronic components. © 2012 Copyright Society of Photo-Optical Instrumentation Engineers (SPIE).
Resumo:
In this paper, we propose a text mining method called LRD (latent relation discovery), which extends the traditional vector space model of document representation in order to improve information retrieval (IR) on documents and document clustering. Our LRD method extracts terms and entities, such as person, organization, or project names, and discovers relationships between them by taking into account their co-occurrence in textual corpora. Given a target entity, LRD discovers other entities closely related to the target effectively and efficiently. With respect to such relatedness, a measure of relation strength between entities is defined. LRD uses relation strength to enhance the vector space model, and uses the enhanced vector space model for query based IR on documents and clustering documents in order to discover complex relationships among terms and entities. Our experiments on a standard dataset for query based IR shows that our LRD method performed significantly better than traditional vector space model and other five standard statistical methods for vector expansion.