13 resultados para Project 2002-062-A : Ethical Construction Procurement
em Aston University Research Archive
Resumo:
Whole life costing (WLC) has become the best practice in construction procurement and it is likely to be a major issue in predicting whole life costs of a construction project accurately. However, different expectations from different organizations throughout a project's life and the lack of data, monitoring targets, and long-term interest for many key players are obstacles to be overcome if WLC is to be implemented. A questionnaire survey was undertaken to investigate a set of ten common factors and 188 individual factors. These were grouped into eight critical categories (project scope, time, cost, quality, contract/administration, human resource, risk, and health and safety) by project phase, as perceived by the clients, contractors and subcontractors in order to identify critical success factors for whole life performance assessment (WLPA). Using a relative importance index, the top ten critical factors for each category, from the perspective of project participants, were analyzed and ranked. Their agreement on those categories and factors were analyzed using Spearman's rank correlation. All participants identify “Type of Project” as the most common critical factor in the eight categories for WLPA. Using the relative index ranking technique and weighted average methods, it was found that the most critical individual factors in each category were: “clarity of contract” (scope); “fixed construction period” (time); “precise project budget estimate” (cost); “material quality” (quality); “mutual/trusting relationships” (contract/administration); “leadership/team management” (human resource); and “management of work safety on site” (health and safety). There was relatively a high agreement on these categories among all participants. Obviously, with 80 critical factors of WLPA, there is a stronger positive relationship between client and contactor rather than contractor and subcontractor, client and subcontractor. Putting these critical factors into a criteria matrix can facilitate an initial framework of WLPA in order to aid decision making in the public sector in South Korea for evaluation/selection process of a construction project at the bid stage.
Resumo:
World-wide efforts have been made to adopt BIM (Building Information Modelling) to improve the efficiency of construction project management processes lively. BIM means a shared digitized expression which provides a reliable source to make an informed decision over a physical or a functional character across all construction sectors including design, civil engineering and plant construction. The Korean Public Procurement Service mandates to use BIM for over 50 billion won public construction projects from 2012, and this will be extended to every project initiated by the Korean Public Procurement Service from 2016. This paper aims not only to investigate potential barriers which can be faced at the initial stage of BIM adoption, but also to explore possible solutions against them. For doing this, the BIM utilization strategies and action plans by US and UK public sectors which adopt BIM earlier than Korea were analysed. Based on the results of comparative analysis between US and UK, the proper guideline for BIM adoption in Korea will be suggested.
Resumo:
Time, cost and quality achievements on large-scale construction projects are uncertain because of technological constraints, involvement of many stakeholders, long durations, large capital requirements and improper scope definitions. Projects that are exposed to such an uncertain environment can effectively be managed with the application of risk management throughout the project life cycle. Risk is by nature subjective. However, managing risk subjectively poses the danger of non-achievement of project goals. Moreover, risk analysis of the overall project also poses the danger of developing inappropriate responses. This article demonstrates a quantitative approach to construction risk management through an analytic hierarchy process (AHP) and decision tree analysis. The entire project is classified to form a few work packages. With the involvement of project stakeholders, risky work packages are identified. As all the risk factors are identified, their effects are quantified by determining probability (using AHP) and severity (guess estimate). Various alternative responses are generated, listing the cost implications of mitigating the quantified risks. The expected monetary values are derived for each alternative in a decision tree framework and subsequent probability analysis helps to make the right decision in managing risks. In this article, the entire methodology is explained by using a case application of a cross-country petroleum pipeline project in India. The case study demonstrates the project management effectiveness of using AHP and DTA.
Resumo:
This report investigates why a nationally important and internationally funded infrastructural project within the Caribbean island of Barbados — The South Coast Sewerage Project — spurned a substantial level of negative socio-economic externalities. Primary and secondary research evaluated the presence or effectiveness of social impact assessment as a mitigation tool. The mitigation measures suggested within the appraisal report appear to have been considered by the Project Execution Unit (PEU) of Government of Barbados. The primary obstacle seems to have been the implementation of the mitigation process by the contractor. This highlights the need to foster an interconnected and symbiotic relationship between appraisal and implementation, if an initiative is to be conducted efficiently and effectively. Additionally, the South Coast Sewerage Project exemplifies the importance of establishing and sustaining a monitoring/control mechanism as an integral part of project construction.
Resumo:
Conventional project management techniques are not always sufficient for ensuring time, cost and quality achievement of large-scale construction projects due to complexity in planning and implementation processes. The main reasons for project non-achievement are changes in scope and design, changes in Government policies and regulations, unforeseen inflation) under-estimation and improper estimation. Projects that are exposed to such an uncertain environment can be effectively managed with the application of risk numagement throughout project life cycle. However, the effectiveness of risk management depends on the technique in which the effects of risk factors are analysed and! or quantified. This study proposes Analytic Hierarchy Process (AHP), a multiple attribute decision-making technique as a tool for risk analysis because it can handle subjective as well as objective factors in decision model that are conflicting in nature. This provides a decision support system (DSS) to project managenumt for making the right decision at the right time for ensuring project success in line with organisation policy, project objectives and competitive business environment. The whole methodology is explained through a case study of a cross-country petroleum pipeline project in India and its effectiveness in project1nana.gement is demonstrated.
Resumo:
Despite the availability of various control techniques and project control software many construction projects still do not achieve their cost and time objectives. Research in this area so far has mainly been devoted to identifying causes of cost and time overruns. There is limited research geared towards studying factors inhibiting the ability of practitioners to effectively control their projects. To fill this gap, a survey was conducted on 250 construction project organizations in the UK, which was followed by face-to-face interviews with experienced practitioners from 15 of these organizations. The common factors that inhibit both time and cost control during construction projects were first identified. Subsequently 90 mitigating measures have been developed for the top five leading inhibiting factors—design changes, risks/uncertainties, inaccurate evaluation of project time/duration, complexities and non-performance of subcontractors were recommended. These mitigating measures were classified as: preventive, predictive, corrective and organizational measures. They can be used as a checklist of good practice and help project managers to improve the effectiveness of control of their projects.
Resumo:
Conventional project management techniques are not always sufficient to ensure that schedule, cost and quality goals are met on large-scale construction projects. These jobs require complex planning, designing and implementation processes. The main reasons for a project's nonachievement in India's hydrocarbon processing industry are changes in scope and design, altered government policies and regulations, unforeseen inflation, under and/or improper estimation. Projects that are exposed to such an uncertain environment can be effectively managed by applying risk management throughout the project life cycle.
Resumo:
Projects exposed to an uncertain environment must be adapted to deal with the effective integration of various planning elements and the optimization of project parameters. Time, cost, and quality are the prime objectives of a project that need to be optimized to fulfill the owner's goal. In an uncertain environment, there exist many other conflicting objectives that may also need to be optimized. These objectives are characterized by varying degrees of conflict. Moreover, an uncertain environment also causes several changes in the project plan throughout its life, demanding that the project plan be totally flexible. Goal programming (GP), a multiple criteria decision making technique, offers a good solution for this project planning problem. There the planning problem is considered from the owner's perspective, which leads to classifying the project up to the activity level. GP is applied separately at each level, and the formulated models are integrated through information flow. The flexibility and adaptability of the models lies in the ease of updating the model parameters at the required level through changing priorities and/or constraints and transmitting the information to other levels. The hierarchical model automatically provides integration among various element of planning. The proposed methodology is applied in this paper to plan a petroleum pipeline construction project, and its effectiveness is demonstrated.
Resumo:
The Securities and Exchange Commission (SEC) in the United States and in particular its immediately past chairman, Christopher Cox, has been actively promoting an upgrade of the EDGAR system of disseminating filings. The new generation of information provision has been dubbed by Chairman Cox, "Interactive Data" (SEC, 2006). In October this year the Office of Interactive Disclosure was created(http://www.sec.gov/news/press/2007/2007-213.htm). The focus of this paper is to examine the way in which the non-professional investor has been constructed by various actors. We examine the manner in which Interactive Data has been sold as the panacea for financial market 'irregularities' by the SEC and others. The academic literature shows almost no evidence of researching non-professional investors in any real sense (Young, 2006). Both this literature and the behaviour of representatives of institutions such as the SEC and FSA appears to find it convenient to construct this class of investor in a particular form and to speak for them. We theorise the activities of the SEC and its chairman in particular over a period of about three years, both following and prior to the 'credit crunch'. Our approach is to examine a selection of the policy documents released by the SEC and other interested parties and the statements made by some of the policy makers and regulators central to the programme to advance the socio-technical project that is constituted by Interactive Data. We adopt insights from ANT and more particularly the sociology of translation (Callon, 1986; Latour, 1987, 2005; Law, 1996, 2002; Law & Singleton, 2005) to show how individuals and regulators have acted as spokespersons for this malleable class of investor. We theorise the processes of accountability to investors and others and in so doing reveal the regulatory bodies taking the regulated for granted. The possible implications of technological developments in digital reporting have been identified also by the CEO's of the six biggest audit firms in a discussion document on the role of accounting information and audit in the future of global capital markets (DiPiazza et al., 2006). The potential for digital reporting enabled through XBRL to "revolutionize the entire company reporting model" (p.16) is discussed and they conclude that the new model "should be driven by the wants of investors and other users of company information,..." (p.17; emphasis in the original). Here rather than examine the somewhat illusive and vexing question of whether adding interactive functionality to 'traditional' reports can achieve the benefits claimed for nonprofessional investors we wish to consider the rhetorical and discursive moves in which the SEC and others have engaged to present such developments as providing clearer reporting and accountability standards and serving the interests of this constructed and largely unknown group - the non-professional investor.
Resumo:
The aim of this study is to address the main deficiencies with the prevailing project cost and time control practices for construction projects in the UK. A questionnaire survey was carried out with 250 top companies followed by in-depth interviews with 15 experienced practitioners from these companies in order to gain further insights of the identified problems, and their experience of good practice on how these problems can be tackled. On the basis of these interviews and syntheses with literature, a list of 65 good practice recommendations have been developed for the key project control tasks: planning, monitoring, reporting and analysing. The Delphi method was then used, with the participation of a panel of 8 practitioner experts, to evaluate these improvement recommendations and to establish their degree of relevance. After two rounds of Delphi, these recommendations are put forward as "critical", "important", or "helpful" measures for improving project control practice.
Resumo:
This study was geared at assessing the employability skills provision within a construction project management degree programme through a questionnaire survey. Students were required to assess their level of ability in relation to the most common skills and competencies most sought after by construction project management graduate employers. The study identified team-working ability as the most sought after skill by the employers investigated followed by verbal communication, written communication and leadership ability. It was found that students were very confident of their ability in 12 of the 14 identified skills and competencies. But ironically, leadership, an important skill sought by employers is one that majority of the students felt most insecure in their ability. The study concludes that the BSc programme equips students with these employability skills and competencies, but more effort is needed to make the leadership development opportunities in the programme more conspicuous. With recommendations on how to achieve this proffered.