4 resultados para Project 2002-010-B : Component Life – A Delphi Approach to Life Prediction of Building Material Components
em Aston University Research Archive
Resumo:
Feasibility studies of industrial projects consist of multiple analyses carried out sequentially. This is time consuming and each analysis screens out alternatives based solely on the merits of that analysis. In cross-country petroleum pipeline project selection, market analysis determines throughput requirement and supply and demand points. Technical analysis identifies technological options and alternatives for pipe-line routes. Economic and financial analysis derive the least-cost option. The impact assessment addresses environmental issues. The impact assessment often suggests alternative sites, routes, technologies, and/or implementation methodology, necessitating revision of technical and financial analysis. This report suggests an integrated approach to feasibility analysis presented as a case application of a cross-country petroleum pipeline project in India.
Resumo:
In ensuring the quality of learning and teaching in Higher Education, self-evaluation is an important component of the process. An example would be the approach taken within the CDIO community whereby self-evaluation against the CDIO standards is part of the quality assurance process. Eight European universities (Reykjavik University, Iceland; Turku University of Applied Sciences, Finland; Aarhus University, Denmark; Helsinki Metropolia University of Applied Sciences, Finland; Ume? University, Sweden; Telecom Bretagne, France; Aston University, United Kingdom; Queens University Belfast, United Kingdom) are engaged in an EU funded Erasmus + project that is exploring the quality assurance process associated with active learning. The development of a new self-evaluation framework that feeds into a ?Marketplace? where participating institutions can be paired up and then engage in peer evaluations and sharing around each institutions approach to and implementation of active learning. All of the partner institutions are engaged in the application of CDIO within their engineering programmes and this has provided a common starting point for the partnership to form and the project to be developed. Although the initial focus will be CDIO, the longer term aim is that the approach could be of value beyond CDIO and within other disciplines. The focus of this paper is the process by which the self-evaluation framework is being developed and the form of the draft framework. In today?s Higher Education environment, the need to comply with Quality Assurance standards is an ever present feature of programme development and review. When engaging in a project that spans several countries, the wealth of applicable standards and guidelines is significant. In working towards the development of a robust Self Evaluation Framework for this project, the project team decided to take a wide view of the available resources to ensure a full consideration of different requirements and practices. The approach to developing the framework considered: a) institutional standards and processes b) national standards and processes e.g. QAA in the UK c) documents relating to regional / global accreditation schemes e.g. ABET d) requirements / guidelines relating to particular learning and teaching frameworks e.g. CDIO. The resulting draft self-evaluation framework is to be implemented within the project team to start with to support the initial ?Marketplace? pairing process. Following this initial work, changes will be considered before a final version is made available as part of the project outputs. Particular consideration has been paid to the extent of the framework, as a key objective of the project is to ensure that the approach to quality assurance has impact but is not overly demanding in terms of time or paperwork. In other words that it is focused on action and value added to staff, students and the programmes being considered.
Resumo:
Projects exposed to an uncertain environment must be adapted to deal with the effective integration of various planning elements and the optimization of project parameters. Time, cost, and quality are the prime objectives of a project that need to be optimized to fulfill the owner's goal. In an uncertain environment, there exist many other conflicting objectives that may also need to be optimized. These objectives are characterized by varying degrees of conflict. Moreover, an uncertain environment also causes several changes in the project plan throughout its life, demanding that the project plan be totally flexible. Goal programming (GP), a multiple criteria decision making technique, offers a good solution for this project planning problem. There the planning problem is considered from the owner's perspective, which leads to classifying the project up to the activity level. GP is applied separately at each level, and the formulated models are integrated through information flow. The flexibility and adaptability of the models lies in the ease of updating the model parameters at the required level through changing priorities and/or constraints and transmitting the information to other levels. The hierarchical model automatically provides integration among various element of planning. The proposed methodology is applied in this paper to plan a petroleum pipeline construction project, and its effectiveness is demonstrated.