7 resultados para Production model
em Aston University Research Archive
Resumo:
A survey of the existing state-of-the-art of turbine blade manufacture highlights two operations that have not been automated namely that of loading of a turbine blade into an encapsulation die, and that of removing a machined blade from the encapsulation block. The automation of blade decapsulation has not been pursued. In order to develop a system to automate the loading of an encapsulation die a prototype mechanical handling robot has been designed together with a computer controlled encapsulation die. The robot has been designed as a mechanical handling robot of cylindrical geometry, suitable for use in a circular work cell. It is the prototype for a production model to be called `The Cybermate'. The prototype robot is mechanically complete but due to unforeseen circumstances the robot control system is not available (the development of the control system did not form a part of this project), hence it has not been possible to fully test and assess the robot mechanical design. Robot loading of the encapsulation die has thus been simulated. The research work with regard to the encapsulation die has focused on the development of computer controlled, hydraulically actuated, location pins. Such pins compensate for the inherent positional inaccuracy of the loading robot and reproduce the dexterity of the human operator. Each pin comprises a miniature hydraulic cylinder, controlled by a standard bidirectional flow control valve. The precision positional control is obtained through pulsing of the valves under software control, with positional feedback from an 8-bit transducer. A test-rig comprising one hydraulic location pin together with an opposing spring loaded pin has demonstrated that such a pin arrangement can be controlled with a repeatability of +/-.00045'. In addition this test-rig has demonstrated that such a pin arrangement can be used to gauge and compensate for the dimensional error of the component held between the pins, by offsetting the pin datum positions to allow for the component error. A gauging repeatability of +/- 0.00015' was demonstrated. This work has led to the design and manufacture of an encapsulation die comprising ten such pins and the associated computer software. All aspects of the control software except blade gauging and positional data storage have been demonstrated. Work is now required to achieve the accuracy of control demonstrated by the single pin test-rig, with each of the ten pins in the encapsulation die. This would allow trials of the complete loading cycle to take place.
Resumo:
The research investigates the processes of adoption and implementation, by organisations, of computer aided production management systems (CAPM). It is organised around two different theoretical perspectives. The first part is informed by the Rogers model of the diffusion, adoption and implementation of innovations, and the second part by a social constructionist approach to technology. Rogers' work is critically evaluated and a model of adoption and implementation is distilled from it and applied to a set of empirical case studies. In the light of the case study data, strengths and weaknesses of the model are identified. It is argued that the model is too rational and linear to provide an adequate explanation of adoption processes. It is useful for understanding processes of implementation but requires further development. The model is not able to adequately encompass complex computer based technologies. However, the idea of 'reinvention' is identified as Roger's key concept but it needs to be conceptually extended. Both Roger's model and definition of CAPM found in the literature from production engineering tend to treat CAPM in objectivist terms. The problems with this view are addressed through a review of the literature on the sociology of technology, and it is argued that a social constructionist approach offers a more useful framework for understanding CAPM, its nature, adoption, implementation, and use. CAPM it is argued, must be understood on terms of the ways in which it is constituted in discourse, as part of a 'struggle for meaning' on the part of academics, professional engineers, suppliers, and users.
Resumo:
This dissertation studies the process of operations systems design within the context of the manufacturing organization. Using the DRAMA (Design Routine for Adopting Modular Assembly) model as developed by a team from the IDOM Research Unit at Aston University as a starting point, the research employed empirically based fieldwork and a survey to investigate the process of production systems design and implementation within four UK manufacturing industries: electronics assembly, electrical engineering, mechanical engineering and carpet manufacturing. The intention was to validate the basic DRAMA model as a framework for research enquiry within the electronics industry, where the initial IDOM work was conducted, and then to test its generic applicability, further developing the model where appropriate, within the other industries selected. The thesis contains a review of production systems design theory and practice prior to presenting thirteen industrial case studies of production systems design from the four industry sectors. The results and analysis of the postal survey into production systems design are then presented. The strategic decisions of manufacturing and their relationship to production systems design, and the detailed process of production systems design and operation are then discussed. These analyses are used to develop the generic model of production systems design entitled DRAMA II (Decision Rules for Analysing Manufacturing Activities). The model contains three main constituent parts: the basic DRAMA model, the extended DRAMA II model showing the imperatives and relationships within the design process, and a benchmark generic approach for the design and analysis of each component in the design process. DRAMA II is primarily intended for use by researchers as an analytical framework of enquiry, but is also seen as having application for manufacturing practitioners.
Resumo:
Current models of word production assume that words are stored as linear sequences of phonemes which are structured into syllables only at the moment of production. This is because syllable structure is always recoverable from the sequence of phonemes. In contrast, we present theoretical and empirical evidence that syllable structure is lexically represented. Storing syllable structure would have the advantage of making representations more stable and resistant to damage. On the other hand, re-syllabifications affect only a minimal part of phonological representations and occur only in some languages and depending on speech register. Evidence for these claims comes from analyses of aphasic errors which not only respect phonotactic constraints, but also avoid transformations which move the syllabic structure of the word further away from the original structure, even when equating for segmental complexity. This is true across tasks, types of errors, and, crucially, types of patients. The same syllabic effects are shown by apraxic patients and by phonological patients who have more central difficulties in retrieving phonological representations. If syllable structure was only computed after phoneme retrieval, it would have no way to influence the errors of phonological patients. Our results have implications for psycholinguistic and computational models of language as well as for clinical and educational practices.
Resumo:
This study presents a computational fluid dynamic (CFD) study of Dimethyl Ether steam reforming (DME-SR) in a large scale Circulating Fluidized Bed (CFB) reactor. The CFD model is based on Eulerian-Eulerian dispersed flow and solved using commercial software (ANSYS FLUENT). The DME-SR reactions scheme and kinetics in the presence of a bifunctional catalyst of CuO/ZnO/Al2O3+ZSM-5 were incorporated in the model using in-house developed user-defined function. The model was validated by comparing the predictions with experimental data from the literature. The results revealed for the first time detailed CFB reactor hydrodynamics, gas residence time, temperature distribution and product gas composition at a selected operating condition of 300 °C and steam to DME mass ratio of 3 (molar ratio of 7.62). The spatial variation in the gas species concentrations suggests the existence of three distinct reaction zones but limited temperature variations. The DME conversion and hydrogen yield were found to be 87% and 59% respectively, resulting in a product gas consisting of 72 mol% hydrogen. In part II of this study, the model presented here will be used to optimize the reactor design and study the effect of operating conditions on the reactor performance and products.
Resumo:
This study presents a computational parametric analysis of DME steam reforming in a large scale Circulating Fluidized Bed (CFB) reactor. The Computational Fluid Dynamic (CFD) model used, which is based on Eulerian-Eulerian dispersed flow, has been developed and validated in Part I of this study [1]. The effect of the reactor inlet configuration, gas residence time, inlet temperature and steam to DME ratio on the overall reactor performance and products have all been investigated. The results have shown that the use of double sided solid feeding system remarkable improvement in the flow uniformity, but with limited effect on the reactions and products. The temperature has been found to play a dominant role in increasing the DME conversion and the hydrogen yield. According to the parametric analysis, it is recommended to run the CFB reactor at around 300 °C inlet temperature, 5.5 steam to DME molar ratio, 4 s gas residence time and 37,104 ml gcat -1 h-1 space velocity. At these conditions, the DME conversion and hydrogen molar concentration in the product gas were both found to be around 80%.