2 resultados para Participative Research

em Aston University Research Archive


Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper is based a major research project run by a team from the Innovation, Design and Operations Management Research Unit at the Aston Business School under SERC funding. International Computers Limited (!CL), the UK's largest indigenous manufacturer of mainframe computer products, was the main industrial collaborator in the research. During the period 1985-89 an integrated production system termed the "Modular Assembly Cascade'' was introduced to the Company's mainframe assembly plant at Ashton-under-Lyne near Manchester. Using a methodology primarily based upon 'participative observation', the researchers developed a model for analysing this manufacturing system design called "DRAMA". Following a critique of the existing literature on Manufacturing Strategy, this paper will describe the basic DRAMA model and its development from an industry specific design methodology to DRAMA II, a generic model for studying organizational decision processes in the design and implementation of production systems. From this, the potential contribution of the DRAMA model to the existing knowledge on the process of manufacturing system design will be apparent.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The objective of Total Productive Maintenance (TPM) is to maximise plant and equipment effectiveness, to create a sense of ownership for operators, and promote continuous improvement through small group activities involving production, engineering and maintenance personnel. This paper describes and analyses a case study of TPM implementation at a newspaper printing house in Singapore. However, rather than adopting more conventional implementation methods such as employing consultants or through a project using external training, a unique approach was adopted based on Action Research using a spiral of cycles of planning, acting observing and reflecting. An Action Research team of company personnel was specially formed to undertake the necessary fieldwork. The team subsequently assisted with administering the resulting action plan. The main sources of maintenance and operational data were from interviews with shop floor workers, participative observation and reviews conducted with members of the team. Content analysis using appropriate statistical techniques was used to test the significance of changes in performance between the start and completion of the TPM programme. The paper identifies the characteristics associated with the Action Research method when used to implement TPM and discusses the applicability of the approach in related industries and processes.