20 resultados para O21 - Planning Models

em Aston University Research Archive


Relevância:

90.00% 90.00%

Publicador:

Resumo:

The scenario planning literature is focused on corporate level interventions. There is a general consensus on the method, but there is little debate about the stages involved in building and using the scenarios. This article presents a case study of a scenario planning intervention, which was conducted at a business unit of the British division of one of the largest beauty and cosmetic products multinationals. The method adopted in this case study has some fundamental differences to the existing models used at corporate level. This research is based on the principles of autoethnography, since its purpose is to present self-critical reflections, enhanced by reflective and reflexive conversations on a scenario planning method used at business unit level. The critical reflections concern a series of critical incidents which distinguish this method from existing intuitive logic scenario planning models which are used at corporate level planning. Ultimately this article contributes to the scenario planning method literature by providing insights into its practice at business unit level. © 2012 Elsevier Ltd.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

A cross-country pipeline construction project is exposed to an uncertain environment due to its enormous size (physical, manpower requirement and financial value), complexity in design technology and involvement of external factors. These uncertainties can lead to several changes in project scope during the process of project execution. Unless the changes are properly controlled, the time, cost and quality goals of the project may never be achieved. A methodology is proposed for project control through risk analysis, contingency allocation and hierarchical planning models. Risk analysis is carried out through the analytic hierarchy process (AHP) due to the subjective nature of risks in construction projects. The results of risk analysis are used to determine the logical contingency for project control with the application of probability theory. Ultimate project control is carried out by hierarchical planning model which enables decision makers to take vital decisions during the changing environment of the construction period. Goal programming (GP), a multiple criteria decision-making technique, is proposed for model formulation because of its flexibility and priority-base structure. The project is planned hierarchically in three levels—project, work package and activity. GP is applied separately at each level. Decision variables of each model are different planning parameters of the project. In this study, models are formulated from the owner's perspective and its effectiveness in project control is demonstrated.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The state of the art in productivity measurement and analysis shows a gap between simple methods having little relevance in practice and sophisticated mathematical theory which is unwieldy for strategic and tactical planning purposes, -particularly at company level. An extension is made in this thesis to the method of productivity measurement and analysis based on the concept of added value, appropriate to those companies in which the materials, bought-in parts and services change substantially and a number of plants and inter-related units are involved in providing components for final assembly. Reviews and comparisons of productivity measurement dealing with alternative indices and their problems have been made and appropriate solutions put forward to productivity analysis in general and the added value method in particular. Based on this concept and method, three kinds of computerised models two of them deterministic, called sensitivity analysis and deterministic appraisal, and the third one, stochastic, called risk simulation, have been developed to cope with the planning of productivity and productivity growth with reference to the changes in their component variables, ranging from a single value 'to• a class interval of values of a productivity distribution. The models are designed to be flexible and can be adjusted according to the available computer capacity expected accuracy and 'presentation of the output. The stochastic model is based on the assumption of statistical independence between individual variables and the existence of normality in their probability distributions. The component variables have been forecasted using polynomials of degree four. This model is tested by comparisons of its behaviour with that of mathematical model using real historical data from British Leyland, and the results were satisfactory within acceptable levels of accuracy. Modifications to the model and its statistical treatment have been made as required. The results of applying these measurements and planning models to the British motor vehicle manufacturing companies are presented and discussed.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Formulating manufacturing business strategy is often fragmented in as much as current tools address upstream and downstream vertical integration with product integration, or more recently, product and infrastructure integration. Rarely do tools address all of these dimensions in an holistic manner. The research described in this paper is that undertaken in the MAPSTRAT project: a scoping study with industrial partners, aiming to satisfy this business need. A comprehensive literature study is described which is contextualized using six case studies. The paper stresses the importance of ‘joined-up thinking’ and outlines plans for an appropriate tool that is under development.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

It is indisputable that printed circuit boards (PCBs) play a vital role in our daily lives. With the ever-increasing applications of PCBs, one of the crucial ways to increase a PCB manufacturer’s competitiveness in terms of operation efficiency is to minimize the production time so that the products can be introduced to the market sooner. Optimal Production Planning for PCB Assembly is the first book to focus on the optimization of the PCB assembly lines’ efficiency. This is done by: • integrating the component sequencing and the feeder arrangement problems together for both the pick-and-place machine and the chip shooter machine; • constructing mathematical models and developing an efficient and effective heuristic solution approach for the integrated problems for both types of placement machines, the line assignment problem, and the component allocation problem; and • developing a prototype of the PCB assembly planning system. The techniques proposed in Optimal Production Planning for PCB Assembly will enable process planners in the electronics manufacturing industry to improve the assembly line’s efficiency in their companies. Graduate students in operations research can familiarise themselves with the techniques and the applications of mathematical modeling after reading this advanced introduction to optimal production planning for PCB assembly.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

There has been concern in the literature about the adequacy of the traditional model of marketing planning, which focuses on what decisions should be made and not on how to make them. The aim of this article is a new conceptualisation that proposes key management processes about how marketing planning decisions are made in a dynamic context. The motives for this conceptualisation are to contribute to understanding by advancing the traditional model of marketing planning, to stimulate academic and practitioner debate about how marketing planning decisions are made, and to initiate new directions in marketing planning research. Two new competing models of marketing planning are developed, which address key management processes about how marketing planning decisions are made in a dynamic context, and research directions are proposed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – To investigate the impact of performance measurement in strategic planning process. Design/methodology/approach – A large scale survey was conducted online with Warwick Business School alumni. The questionnaire was based on the Strategic Development Process model by Dyson. The questionnaire was designed to map the current practice of strategic planning and to determine its most influential factors on the effectiveness of the process. All questions were close ended and a seven-point Likert scale used. The independent variables were grouped into four meaningful factors by factor analysis (Varimax, coefficient of rotation 0.4). The factors produced were used to build regression models (stepwise) for the five assessments of strategic planning process. Regression models were developed for the totality of the responses, comparing SMEs and large organizations and comparing organizations operating in slowly and rapidly changing environments. Findings – The results indicate that performance measurement stands as one of the four main factors characterising the current practice of strategic planning. This research has determined that complexity coming from organizational size and rate of change in the sector creates variation in the impact of performance measurement in strategic planning. Large organizations and organizations operating in rapidly changing environments make greater use of performance measurement. Research limitations/implications – This research is based on subjective data, therefore the conclusions do not concern the impact of strategic planning process' elements on the organizational performance achievements, but on the success/effectiveness of the strategic planning process itself. Practical implications – This research raises a series of questions about the use and potential impact of performance measurement, especially in the categories of organizations that are not significantly influenced by its utilisation. It contributes to the field of performance measurement impact. Originality/value – This research fills in the gap literature concerning the lack of large scale surveys on strategic development processes and performance measurement. It also contributes in the literature of this field by providing empirical evidences on the impact of performance measurement upon the strategic planning process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Mathematical methods in systematic conservation planning (SCP) represent a significant step toward cost-effective, transparent allocation of resources for biodiversity conservation. However, research demonstrates important consequences of uncertainties in SCP. Current research often relies on simplified case studies with unknown forms and amounts of uncertainty and low statistical power for generalizing results. Consequently, conservation managers have little evidence for the true performance of conservation planning methods in their own complex, uncertain applications. SCP needs to build evidence for predictive models of error and robustness to multiple, simultaneous uncertainties across a wide range of problems of known complexity. Only then can we determine true performance rather than how a method appears to perform on data with unknown uncertainty.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research focuses on two groups of local companies; namely, high-growth local companies and other local companies, to examine and compare the influence of utilising governmental initiatives, servicing foreign MNCs and internationalisation on their strategic planning process. The theme of this thesis argues that the approach of an organisation towards strategic planning is not only determined by the internal influences; namely, its firm size and the planning behaviour and attitude of an entrepreneur, as revealed in the literature, but it can also be affected by external influences. The theoretical contribution of this research determines this unique situation in Singapore, and tests the robustness of the conventional models of planning in smaller companies. As a result of the external influences, this study reveals that local companies are more likely to undertake a much more formal strategic planning than the conventional Western literature and models would indicate. High-growth local companies, in comparison, however, had undertaken a more formal and rigorous strategic planning process than other local companies.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The starting point of the project was the observation that strategic management is absent in small businesses. The first objective of the project was to examine the reasons causing this situation in Greece, the second one, to examine the appropriateness of the contemporary models of strategic planning for the Greek S.M.E.s, and the third to examine the appropriateness of the alternative approaches to strategic management for the Greek S.M.E.s. The term appropriateness includes (a) the ability of managers to use the models and (b) the ability of the models to assist the managers. The results of the research indicate that none of the two above conditions exists, hence, it is suggested that the contemporary models of strategic management are inappropriate for the Greek S.M.E.s. Many previous research projects on the topic suggest that since the strategic decision making process in S.M.E.s is informal, the whole process is absent or ineffective. Current trends in S.M.E.s' strategic management do not consider the informality of the strategic decision making process as a kind of managerial illness, but as a managerial characteristic. The use of sophisticated data collection and analytical methods does not indicate successful strategic decisions, but it indicates the method large firms use to manage their strategy. According to the literature review, the S.M.E.s' managers avoid the use of the contemporary models of strategic management, because they do not have the knowledge, the resources or the time. Another thesis, expressed by some firms' specialists, suggests that small firms are different from large ones, hence their practice of strategic management should not follow the large firm's prototypes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The thesis describes the work carried out to develop a prototype knowledge-based system 'KBS-SETUPP' to generate process plans for the manufacture of seamless tubes. The work is specifically related to a plant in which hollows are made from solid billets using a rotary piercing process and then reduced to required size and finished properties using the fixed plug cold drawing process. The thesis first discusses various methods of tube production in order to give a general background of tube manufacture. Then a review of the automation of the process planning function is presented in terms of its basic sub-tasks and the techniques and suitability of a knowledge-based system is established. In the light of such a review and a case study, the process planning problem is formulated in the domain of seamless tube manufacture, its basic sub-tasks are identified and capabilities and constraints of the available equipment in the specific plant are established. The task of collecting and collating the process planning knowledge in seamless tube manufacture is discussed and is mostly fulfilled from domain experts, analysing of existing manufacturing records specific to plant, textbooks and applicable Standards. For the cold drawing mill, tube-drawing schedules have been rationalised to correspond with practice. The validation of such schedules has been achieved by computing the process parameters and then comparing these with the drawbench capacity to avoid over-loading. The existing models cannot be simulated in the computer program as such, therefore a mathematical model has been proposed which estimates the process parameters which are in close agreement with experimental values established by other researchers. To implement the concepts, a Knowledge-Based System 'KBS- SETUPP' has been developed on Personal Computer using Turbo- Prolog. The system is capable of generating process plans, production schedules and some additional capabilities to supplement process planning. The system generated process plans have been compared with the actual plans of the company and it has been shown that the results are satisfactory and encouraging and that the system has the capabilities which are useful.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this thesis, I view the historical background of Zimbabwe to show the patterns of traditional life that existed prior to settlerism. The form, nature, pace and impact of settlerism and colonialism up to the time of independence are also discussed to show how they affected the health of the population and the pace of development of the country. The political, social and economic underdevelopment of the African people that occurred in Zimbabwe prior to independence was a result of deliberate, politically motivated and controlled policy initiatives. These led to inequatable, inadequate, inappropriate and inaccessible health care provision. It is submitted that since it was the politics that determined the pace of underdevelopment, it must be the politics that must be at the forefront of the development strategy adopted. In the face of the amed conflict that existed in Zimbabwe, existing frameworks of analyses are shown to be inadequate for planning purposes because of their inability to provide indications about the stability of future outcomes. The Metagame technique of analysis of options is proposed as a methology that can be applied in such situations. It rejects deterministic predicative models as misleading and advocates an interactive model based on objective and subjective valuation of human behaviour. In conclusion, the search for stable outcomes rather than optimal and best solutions strategies is advocated in decision making in organisations of all sizes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The aim of this research is to improve the planning methodology of Dunlop via an analysis of their annual planning system. This was approached via an investigation of how the plans were developed; extensive interviews, which analysed divisional attitudes and approaches to planning; an analysis of forecast accuracy; and participation in the planning system itself. These investigations revealed certain deficiencies in the operating of the system. In particular, little evidence of formal planning could be found, and some divisions were reacting ex post to the market, rather than planning ex ante. The resulting plans tended to lack resilience and were generally unrealistic, partly because of imposed targets. Similarly, because the links between the elements of the system were often inefficient, previously agreed strategies were not always implemented. The analysis of forecast accuracy in the plans revealed divisions to be poor at most aspects of forecasting. Simple naive models often outperformed divisional forecasts, and much of the error was attributed to systematic, and therefore eliminable factors. These analyses suggested the need for a new system which is proposed in the form of Budgetary Planning. This system involves conceptual changes within the current planning framework. Such changes aim to revise tactical planning in order to meet the needs placed on it by. in particular, strategic planning. Budgetary Planning is an innovation in terms of the current planning literature. It is a total system of annual planning aimed at implementing and controlling the iteratively agreed strategies within the current environment. This is achieved by the generation of tactical alternatives, variable funding and concentration of forecast credibility, all of which aid both the realism and the resilience of planning.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The research described here concerns the development of metrics and models to support the development of hybrid (conventional/knowledge based) integrated systems. The thesis argues from the point that, although it is well known that estimating the cost, duration and quality of information systems is a difficult task, it is far from clear what sorts of tools and techniques would adequately support a project manager in the estimation of these properties. A literature review shows that metrics (measurements) and estimating tools have been developed for conventional systems since the 1960s while there has been very little research on metrics for knowledge based systems (KBSs). Furthermore, although there are a number of theoretical problems with many of the `classic' metrics developed for conventional systems, it also appears that the tools which such metrics can be used to develop are not widely used by project managers. A survey was carried out of large UK companies which confirmed this continuing state of affairs. Before any useful tools could be developed, therefore, it was important to find out why project managers were not using these tools already. By characterising those companies that use software cost estimating (SCE) tools against those which could but do not, it was possible to recognise the involvement of the client/customer in the process of estimation. Pursuing this point, a model of the early estimating and planning stages (the EEPS model) was developed to test exactly where estimating takes place. The EEPS model suggests that estimating could take place either before a fully-developed plan has been produced, or while this plan is being produced. If it were the former, then SCE tools would be particularly useful since there is very little other data available from which to produce an estimate. A second survey, however, indicated that project managers see estimating as being essentially the latter at which point project management tools are available to support the process. It would seem, therefore, that SCE tools are not being used because project management tools are being used instead. The issue here is not with the method of developing an estimating model or tool, but; in the way in which "an estimate" is intimately tied to an understanding of what tasks are being planned. Current SCE tools are perceived by project managers as targetting the wrong point of estimation, A model (called TABATHA) is then presented which describes how an estimating tool based on an analysis of tasks would thus fit into the planning stage. The issue of whether metrics can be usefully developed for hybrid systems (which also contain KBS components) is tested by extending a number of "classic" program size and structure metrics to a KBS language, Prolog. Measurements of lines of code, Halstead's operators/operands, McCabe's cyclomatic complexity, Henry & Kafura's data flow fan-in/out and post-release reported errors were taken for a set of 80 commercially-developed LPA Prolog programs: By re~defining the metric counts for Prolog it was found that estimates of program size and error-proneness comparable to the best conventional studies are possible. This suggests that metrics can be usefully applied to KBS languages, such as Prolog and thus, the development of metncs and models to support the development of hybrid information systems is both feasible and useful.