4 resultados para Manpower planning

em Aston University Research Archive


Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis deals with the integration of the manpower criterion with the strategic decision making processes of technological projects in developing countries. This integration is to be achieved by ensuring the involvement of the actors, who have relevant roles and responsibilities along the whole life cycle of the project, in the strategic decision making phases of the project. The relevance of the actors is ascertained by the use of a responsibility index which relates their responsibility to the project's constituent stages. In the context of a technological project in a typical centrally-planned developing environment, the actors are identified as Arbiters, Planners, Implementors and Operators and their roles, concerns and objectives are derived. In this context, the actors are usually government and non-government organisations. Hence, decision making will involve multiple agencies as well as multiple criteria. A methodology covering the whole decision-making process, from options generation to options selection, and adopting Saaty's Analytical Hierarchy Process as an operational tool is proposed to deal with such multiple-criteria, multipleagency decision situations. The methodology is intended to integrate the consideration of the relevant criteria, the prevailing environmental and policy factors, and the concerns and objectives of the relevant actors into a unifying decision-making process which strives to facilitate enlightened decision making and to enhance learning and interaction. An extensive assessment of the methodology's feasibility, based on a specific technological project within the Iraqi oil industry is included, and indicates that the methodology should be both useful and implementable.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This thesis considers management decision making at the ward level in hospitals especially by ward sisters, and the effectiveness of the intervention of a decision support system. Nursing practice theories were related to organisation and management theories in order to conceptualise a decision making framework for nurse manpower planning and deployment at the ward level. Decision and systems theories were explored to understand the concepts of decision making and the realities of power in an organisation. In essence, the hypothesis was concerned with changes in patterns of decision making that could occur with the intervention of a decision support system and that the degree of change would be governed by a set of `difficulty' factors within wards in a hospital. During the course of the study, a classification of ward management decision making was created, together with the development and validation of measuring instruments to test the research hypothesis. The decision support system used was rigorously evaluated to test whether benefits did accrue from its implementation. Quantitative results from sample wards together with qualitative information collected, were used to test this hypothesis and the outcomes postulated were supported by these findings. The main conclusion from this research is that a more rational approach to management decision making is feasible, using information from a decision support system. However, wards and ward sisters that need the most assistance, where the `difficulty' factors in the organisation are highest, benefit the least from this type of system. Organisational reviews are needed on these identified wards, involving managers and doctors, to reduce the levels of un-coordinated activities and disruption.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A cross-country pipeline construction project is exposed to an uncertain environment due to its enormous size (physical, manpower requirement and financial value), complexity in design technology and involvement of external factors. These uncertainties can lead to several changes in project scope during the process of project execution. Unless the changes are properly controlled, the time, cost and quality goals of the project may never be achieved. A methodology is proposed for project control through risk analysis, contingency allocation and hierarchical planning models. Risk analysis is carried out through the analytic hierarchy process (AHP) due to the subjective nature of risks in construction projects. The results of risk analysis are used to determine the logical contingency for project control with the application of probability theory. Ultimate project control is carried out by hierarchical planning model which enables decision makers to take vital decisions during the changing environment of the construction period. Goal programming (GP), a multiple criteria decision-making technique, is proposed for model formulation because of its flexibility and priority-base structure. The project is planned hierarchically in three levels—project, work package and activity. GP is applied separately at each level. Decision variables of each model are different planning parameters of the project. In this study, models are formulated from the owner's perspective and its effectiveness in project control is demonstrated.