4 resultados para Los Angeles (Calif.). Dept. of Water and Power
em Aston University Research Archive
Resumo:
William J. Hausman, Peter Hertner, and Mira Wilkins. Global Electrification: Multinational Enterprise and International Finance in the History of Light and Power, 1878–2007. New York: Cambridge University Press, 2008. xxiv + 487 pp. ISBN 978-0-521-88035-0, $80 (hardcover).
Resumo:
This paper explores how the concept of Alzheimer’s disease (AD) is constructed through Spanish media and documentary films and how it is represented. The article analyses three documentary films and the cultural and social contexts in and from which they emerged: Solé´s Bucarest: la memòria perduda [Bucharest: Memory Lost] (2007), Bosch´s Bicicleta, cullera, poma [Bicycle, Spoon, Apple] (2010) , and Frabra’s Las voces de la memoria [Memory´s Voices] (2011). The three documentary films approach AD from different perspectives, creating well-structured discourses of what AD represents for contemporary Spanish society, from medicalisation of AD to issues of personhood and citizenship. These three films are studied from an interdisciplinary perspective, in an effort to strengthen the links between ageing and dementia studies and cultural studies. Examining documentary film representations of AD from these perspectives enables semiotic analyses beyond the aesthetic perspectives of film studies, and the exploration of the articulation of knowledge and power in discourses about AD in contemporary Spain
Resumo:
Biomass is projected to account for approximately half of the new energy production required to achieve the 2020 primary energy target in the UK. Combined heat and power (CHP) bioenergy systems are not only a highly efficient method of energy conversion, at smaller-scales a significant proportion of the heat produced can be effectively utilised for hot water, space heating or industrial heating purposes. However, there are many barriers to project development and this has greatly inhibited deployment in the UK. Project viability is highly subjective to changes in policy, regulation, the finance market and the low cost incumbent; a high carbon centralised energy system. Unidentified or unmitigated barriers occurring during the project lifecycle may not only negatively impact on the project but could ultimately lead to project failure. The research develops a decision support system (DSS) for small-scale (500 kWe to 10 MWe) biomass combustion CHP project development and risk management in the early stages of a potential project’s lifecycle. By supporting developers in the early stages of project development with financial, scheduling and risk management analysis, the research aims to reduce the barriers identified and streamline decision-making. A fuzzy methodology is also applied throughout the developed DSS to support developers in handling the uncertain or approximate information often held at the early stages of the project lifecycle. The DSS is applied to a case study of a recently failed (2011) small-scale biomass CHP project to demonstrate its applicability and benefits. The application highlights that the proposed development within the case study was not viable. Moreover, further analysis of the possible barriers with the DSS confirmed that some possible modifications to be project could have improved this, such as a possible change of feedstock to a waste or residue, addressing the unnecessary land lease cost or by increasing heat utilisation onsite. This analysis is further supported by a practitioner evaluation survey that confirms the research contribution and objectives are achieved.
Resumo:
bCHP (Biomass combined heat and power) systems are highly efficient at smaller-scales when a significant proportion of the heat produced can be effectively utilised for hot water, space heating or industrial heating purposes. However, there are many barriers to project development and this has greatly inhibited deployment in the UK. Project viability is highly subjective to changes in policy, regulation, the finance market and the low cost fossil fuel incumbent. The paper reviews the barriers to small-scale bCHP project development in the UK along with a case study of a failed 1.5MWel bCHP scheme. The paper offers possible explanations for the project's failure and suggests adaptations to improve the project resilience. Analysis of the project's: capital structuring contract length and bankability; feedstock type and price uncertainty, and plant oversizing highlight the negative impact of the existing project barriers on project development. The research paper concludes with a discussion on the effects of these barriers on the case study project and this industry more generally. A greater understanding of the techno-economic effects of some barriers for small-scale bCHP schemes is demonstrated within this paper, along with some methods for improving the attractiveness and resilience of projects of this kind. © 2014 Elsevier Ltd.