182 resultados para Lodging supply chain
em Aston University Research Archive
Resumo:
The amplification of demand variation up a supply chain widely termed ‘the Bullwhip Effect’ is disruptive, costly and something that supply chain management generally seeks to minimise. Originally attributed to poor system design; deficiencies in policies, organisation structure and delays in material and information flow all lead to sub-optimal reorder point calculation. It has since been attributed to exogenous random factors such as: uncertainties in demand, supply and distribution lead time but these causes are not exclusive as academic and operational studies since have shown that orders and/or inventories can exhibit significant variability even if customer demand and lead time are deterministic. This increase in the range of possible causes of dynamic behaviour indicates that our understanding of the phenomenon is far from complete. One possible, yet previously unexplored, factor that may influence dynamic behaviour in supply chains is the application and operation of supply chain performance measures. Organisations monitoring and responding to their adopted key performance metrics will make operational changes and this action may influence the level of dynamics within the supply chain, possibly degrading the performance of the very system they were intended to measure. In order to explore this a plausible abstraction of the operational responses to the Supply Chain Council’s SCOR® (Supply Chain Operations Reference) model was incorporated into a classic Beer Game distribution representation, using the dynamic discrete event simulation software Simul8. During the simulation the five SCOR Supply Chain Performance Attributes: Reliability, Responsiveness, Flexibility, Cost and Utilisation were continuously monitored and compared to established targets. Operational adjustments to the; reorder point, transportation modes and production capacity (where appropriate) for three independent supply chain roles were made and the degree of dynamic behaviour in the Supply Chain measured, using the ratio of the standard deviation of upstream demand relative to the standard deviation of the downstream demand. Factors employed to build the detailed model include: variable retail demand, order transmission, transportation delays, production delays, capacity constraints demand multipliers and demand averaging periods. Five dimensions of supply chain performance were monitored independently in three autonomous supply chain roles and operational settings adjusted accordingly. Uniqueness of this research stems from the application of the five SCOR performance attributes with modelled operational responses in a dynamic discrete event simulation model. This project makes its primary contribution to knowledge by measuring the impact, on supply chain dynamics, of applying a representative performance measurement system.
Resumo:
The application of any e-Solution promises significant returns. In particular, using internet technologies both within enterprises and across the supply (value) chain provides real opportunity, not only for operational improvement but also for innovative strategic positioning. However, significant questions obscure potential investment; how any value will actually be created and, importantly, how this value will be shared across the value chain is not clear. This paper will describe a programme of research that is developing an enterprise simulator that will provide a more fundamental understanding of the impact of e-Solutions across operational supply chains, in terms of both standard operational and financial measures of performance. An efficient supply chain reduces total costs of operations by sharing accurate real-time information and coordinating inter-organizational business processes. This form of electronic link between organizations is known as business-to-business (B2B) e-Business. The financial measures go beyond simple cost calculations to real bottom-line performance by modelling the financial transactions that business processes generate. The paper will show how this enterprise simulator allows for a complete supply chain to be modelled in this way across four key applications: control system design, virtual enterprises, pan-supply-chain performance metrics and supporting e-Supply-chain design methodology.
Resumo:
Singapore's electronics manufacturers are facing many questions. In the computer hard-drive industry, where the problem of obsolescence is common and where a product's lifecycle may be only six months, manufacturers are anxious to know what the next order-winning criteria will be. Since low labour costs are no longer a key factor, many organisations are developing their competencies in research and development, sales and marketing, logistics and supply chain management in order to maintain competitiveness. This paper illustrates how Seagate has envisaged a climate of cooperation and collaboration to better serve its customers in the areas of technology, cost and delivery. The paper is based on observations and findings following a longitudinal case study approach at the Seagate Storage Product Group (SPG) in Singapore. The seven-stage implementation framework adopted by Seagate in their SCM project is discussed, together with the process of how Seagate has created a paradigm shift towards a new culture of teamwork-based collaboration.
Resumo:
This paper reports on the development of elements of an e-supply chain management system for managing maintenance, repair and overhaul (MRO) relationships in the aerospace industry. A standard systems development methodology has been followed to produce a process model (i.e. the AMSCR model); an information model (i.e. business rules) and a computerised information management capability (i.e. automated optimisation). The proof of concept for this web-based MRO supply chain system has been established through the collaboration with a sample of the different types of supply chain members. The proven benefit is a reduction in the stock-holding costs for the whole supply chain whilst also minimising non-flying time of the aircraft that the supply chain supports. This type of system is now vital in an industry that has continuously decreasing profit margins, which in turn means pressure to reduce servicing times and increase the interval between maintenance actions.
Resumo:
The Small and Medium-sized construction Enterprises (construction SMEs) in Thailand face challenges like high fragmented structure and low productivity. Many industries improved their business performance using the supply chain integration. This research was conducted by interviewing 14 small and medium Thai building contractors to understand the features and relationship characteristics of the supply chain of construction SMEs. The study reveals that the linkages between the small and medium general contractors and other supply chain members are based on personal trust rather than contract laws, there is no systematic procedure to manage the relationship with clients during the project execution, and social connections help to maintain long-term relationship with clients. Based on the working behaviour and commitment to long-term relationship, six forms of relationship with supply side members are proposed. Finally, improvement measures for the supply chain integration of the construction SMEs in Thailand are presented.
Resumo:
This paper develops and applies an integrated multiple criteria decision making approach to optimize the facility location-allocation problem in the contemporary customer-driven supply chain. Unlike the traditional optimization techniques, the proposed approach, combining the analytic hierarchy process (AHP) and the goal programming (GP) model, considers both quantitative and qualitative factors, and also aims at maximizing the benefits of deliverer and customers. In the integrated approach, the AHP is used first to determine the relative importance weightings or priorities of alternative locations with respect to both deliverer oriented and customer oriented criteria. Then, the GP model, incorporating the constraints of system, resource, and AHP priority is formulated to select the best locations for setting up the warehouses without exceeding the limited available resources. In this paper, a real case study is used to demonstrate how the integrated approach can be applied to deal with the facility location-allocation problem, and it is proved that the integrated approach outperforms the traditional costbased approach.
Resumo:
Supply chains are advocated widely as being the new units for commercial competition and developments have made the sharing of supply chain wide information increasingly common. Most organisations however still make operational decisions intended to maximise local organisational performance. With improved information sharing a holistic focus for operational decisions should now be possible. The development of a pan supply chain performance framework requires an examination of the conditions under which holistic-decisions provide benefits to either the individual enterprise or the complete supply chain. This paper presents the background and supporting methodology for a study of the impact of an overall supply chain performance metric framework upon local logistics decisions and the conditions under which such a framework would improve overall supply chain performance. The methodology concludes a simulation approach using a functionally extended Gensym's e-SCOR model, together with case based triangulation, to be optimum. Copyright © 2007 Inderscience Enterprises Ltd.