14 resultados para International construction

em Aston University Research Archive


Relevância:

70.00% 70.00%

Publicador:

Resumo:

The construction industry is susceptible to extreme weather events (EWEs) due to most of its activities being conducted by manual workers outdoors. Although research has been conducted on the effects of EWEs, such as flooding and snowfall, limited research has been conducted on the effects of heatwaves and hot weather conditions. Heatwaves present a somewhat different risk profile to construction, unlike EWEs such as flooding and heavy snowfall that present physical obstacles to work onsite. However, heatwaves have affected the construction industry in the UK, and construction claims have been made due to adverse weather conditions. With heatwaves being expected to occur more frequently in the coming years, the construction industry may suffer unlike any other industry during the summer months. This creates the need to investigate methods that would allow construction activities to progress during hot summer months with minimal effect on construction projects. Hence, the purpose of this paper. Regions such as the Middle East and the UAE in particular flourish with mega projects, although temperatures soar to above 40̊C in the summer months. Lessons could be learnt from such countries and adapted in the UK. Interviews have been conducted with a lead representative of a client, a consultant and a contractor, all of which currently operate on UAE projects. The key findings include one of the preliminary steps taken by international construction companies operating in the UAE. This involves restructuring their entire regional team by employing management staff from countries such as Lebanon, Palestine, Iraq, and their labour force from the sub-continent such as India and Pakistan. This is not only due to the cheap wage rate but also to the ability to cope and work in such extreme hot weather conditions. The experience of individuals working in the region allows for future planning, where the difference in labour productivity during the extreme hot weather conditions is known, allowing precautionary measures to be put in place.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

We have recently developed a principled approach to interactive non-linear hierarchical visualization [8] based on the Generative Topographic Mapping (GTM). Hierarchical plots are needed when a single visualization plot is not sufficient (e.g. when dealing with large quantities of data). In this paper we extend our system by giving the user a choice of initializing the child plots of the current plot in either interactive, or automatic mode. In the interactive mode the user interactively selects ``regions of interest'' as in [8], whereas in the automatic mode an unsupervised minimum message length (MML)-driven construction of a mixture of GTMs is used. The latter is particularly useful when the plots are covered with dense clusters of highly overlapping data projections, making it difficult to use the interactive mode. Such a situation often arises when visualizing large data sets. We illustrate our approach on a data set of 2300 18-dimensional points and mention extension of our system to accommodate discrete data types.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Several parties (stakeholders) are involved in a construction project. The conventional Risk Management Process (RMP) manages risks from a single party perspective, which does not give adequate consideration to the needs of others. The objective of multi-party risk management is to assist decision-makers in managing risk systematically and most efficiently in a multi-party environment. Multi-party Risk Management Processes (MRMP) consist of risk identification, structuring, analysis and developing responses from all party perspectives. The MRMP has been applied to a cement plant construction project in Thailand to demonstrate its effectiveness.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose - The purpose of the paper is to the identify risk factors, which affect oil and gas construction projects in Vietnam and derive risk responses. Design/methodology/approach - Questionnaire survey was conducted with the involvement of project executives of PetroVietnam and statistical analysis was carried out in order to identify the major project risks. Subsequently, mitigating measures were derived using informal interviews with the various levels of management of PetroVietnam. Findings - Bureaucratic government system and long project approval procedures, poor design, incompetence of project team, inadequate tendering practices, and late internal approval processes from the owner were identified as major risks. The executives suggested various strategies to mitigate the identified risks. Reforming the government system, effective partnership with foreign collaborators, training project executives, implementing contractor evaluation using multiple criteria decision-making technique, and enhancing authorities of project people were suggested as viable approaches. Practical implications - The improvement measures as derived in this study would improve chances of project success in the oil and gas industry in Vietnam. Originality/value - There are several risk management studies on managing projects in developing countries. However, as risk factors vary considerably across industry and countries, the study of risk management for successful projects in the oil and gas industry in Vietnam is unique and has tremendous importance for effective project management.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Small and Medium-sized construction Enterprises (construction SMEs) in Thailand face challenges like high fragmented structure and low productivity. Many industries improved their business performance using the supply chain integration. This research was conducted by interviewing 14 small and medium Thai building contractors to understand the features and relationship characteristics of the supply chain of construction SMEs. The study reveals that the linkages between the small and medium general contractors and other supply chain members are based on personal trust rather than contract laws, there is no systematic procedure to manage the relationship with clients during the project execution, and social connections help to maintain long-term relationship with clients. Based on the working behaviour and commitment to long-term relationship, six forms of relationship with supply side members are proposed. Finally, improvement measures for the supply chain integration of the construction SMEs in Thailand are presented.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This article explores the notion that the workplace is a learning environment, and that the line manager is a key player determining its effectiveness. The work discusses how performance management systems may be used to clarify expectations made of line managers with regard to employee development. The work, in addition, suggests that line manager people management expertise may be a factor inhibiting workplace development for subordinates, and makes a number of suggestions about how to prepare the line manager for effective employee development. Key issues are illustrated by reference to a case study example. The case demonstrates that a high profile management development programme within a major international organisation failed to meet all objectives because of the unwillingness of the line management team to participate in the development of subordinates back in the workplace.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Wider scientific community now accept that the threat of climate change as real and thus acknowledge the importance of implementing adaptation measures in a global context. In the UK , the physical effects of climate change are likely to be directly felt in the form of extreme weather events, which are predicted to escalate in number and severity in future under the changing climatic conditions. Construction industry; which consists of supply chains running across various other industries, economies and regions, will also be affected due to these events. Thus, it is important that the construction organisations are well prepared to withstand the effects of extreme weather events not only directly affecting their organisations but also affecting their supply chains which in turn might affect the organisation concerned. Given the fact that more than 99% of construction sector businesses are SMEs, the area can benefit significantly from policy making to improve SME resilience and coping capacity. This paper presents the literature review and synthesis of a doctoral research study undertaken to address the issue of extreme weather resilience of construction sector SMEs and their supply chains. The main contribution of the paper to both academia and practitioners is a synthesis model that conceptualises the factors that enhances resilience of SMEs and their supply chains against extreme weather events. This synthesis model forms the basis of a decision making framework that will enable SMEs to both reduce their vulnerability and enhance their coping capacity against extreme weather. The value of this paper is further extended by the overall research design that is set forth as the way forward.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Determining an appropriate research methodology is considered as an important element in a research study; especially in a doctoral research study. It involves approach to the entire process of a research study, starting from theoretical underpinnings and spanning to data collection and analysis, and extending to developing the solutions for the problems investigated. Research methodology in essence is focused around the problems to be investigated in a research study and therefore varies according to the problems investigated. Thus, identifying the research methodology that best suits a research in hand is important, not only as it will benefit achieving the set objectives of a research, but also as it will serve establishing the credibility of the work. Research philosophy, approach, strategy, choice, and techniques are inherent components of the methodology. Research strategy provides the overall direction of the research including the process by which the research is conducted. Case study, experiment, survey, action research, grounded theory and ethnography are examples for such research strategies. Case study is documented as an empirical inquiry that investigates a contemporary phenomenon within its real-life context, especially when the boundaries between phenomenon and context are not clearly evident. Case study was adopted as the overarching research strategy, in a doctoral study developed to investigate the resilience of construction Small and Medium-sized Enterprises (SMEs) in the UK to extreme weather events. The research sought to investigate how construction SMEs are affected by EWEs, respond to the risk of EWEs, and means of enhancing their resilience to future EWEs. It is argued that utilising case study strategy will benefit the research study, in achieving the set objectives of the research and answering the research questions raised, by comparing and contrasting with the alternative strategies available. It is also claimed that the selected strategy will contribute towards addressing the call for improved methodological pluralism in construction management research, enhancing the understanding of complex network of relationships pertinent to the industry and the phenomenon being studied.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A cross-country pipeline construction project is exposed to an uncertain environment due to its enormous size (physical, manpower requirement and financial value), complexity in design technology and involvement of external factors. These uncertainties can lead to several changes in project scope during the process of project execution. Unless the changes are properly controlled, the time, cost and quality goals of the project may never be achieved. A methodology is proposed for project control through risk analysis, contingency allocation and hierarchical planning models. Risk analysis is carried out through the analytic hierarchy process (AHP) due to the subjective nature of risks in construction projects. The results of risk analysis are used to determine the logical contingency for project control with the application of probability theory. Ultimate project control is carried out by hierarchical planning model which enables decision makers to take vital decisions during the changing environment of the construction period. Goal programming (GP), a multiple criteria decision-making technique, is proposed for model formulation because of its flexibility and priority-base structure. The project is planned hierarchically in three levels—project, work package and activity. GP is applied separately at each level. Decision variables of each model are different planning parameters of the project. In this study, models are formulated from the owner's perspective and its effectiveness in project control is demonstrated.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Intranet technologies accessible through a web based platform are used to share and build knowledge bases in many industries. Previous research suggests that intranets are capable of providing a useful means to share, collaborate and transact information within an organization. To compete and survive successfully, business organisations are required to effectively manage various risks affecting their businesses. In the construction industry too this is increasingly becoming an important element in business planning. The ability of businesses, especially of SMEs which represent a significant portion in most economies, to manage various risks is often hindered by fragmented knowledge across a large number of businesses. As a solution, this paper argues that Intranet technologies can be used as an effective means of building and sharing knowledge and building up effective knowledge bases for risk management in SMEs, by specifically considering the risks of extreme weather events. The paper discusses and evaluates relevant literature in this regard and identifies the potential for further research to explore this concept.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Determining an appropriate research methodology is considered as an important element in a research study; especially in a doctoral research study. It involves approach to the entire process of a research study, starting from theoretical underpinnings and spanning to data collection and analysis, and extending to developing the solutions for the problems investigated. Research methodology in essence is focused around the problems to be investigated in a research study and therefore varies according to the problems investigated. Thus, identifying the research methodology that best suits a research in hand is important, not only as it will benefit achieving the set objectives of a research, but also as it will serve establishing the credibility of the work. Research philosophy, approach, strategy, choice, and techniques are inherent components of the methodology. Research strategy provides the overall direction of the research including the process by which the research is conducted. Case study, experiment, survey, action research, grounded theory and ethnography are examples for such research strategies. Case study is documented as an empirical inquiry that investigates a contemporary phenomenon within its real-life context, especially when the boundaries between phenomenon and context are not clearly evident. Case study was adopted as the overarching research strategy, in a doctoral study developed to investigate the resilience of construction Small and Medium-sized Enterprises (SMEs) in the UK to extreme weather events. The research sought to investigate how construction SMEs are affected by EWEs, respond to the risk of EWEs, and means of enhancing their resilience to future EWEs. It is argued that utilising case study strategy will benefit the research study, in achieving the set objectives of the research and answering the research questions raised, by comparing and contrasting with the alternative strategies available. It is also claimed that the selected strategy will contribute towards addressing the call for improved methodological pluralism in construction management research, enhancing the understanding of complex network of relationships pertinent to the industry and the phenomenon being studied.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Weather extremes have created a considerable impact on Small and Medium-sized Enterprises (SMEs) in the UK during the recent years, especially on SMEs in the construction sector. Evidence in relation to the recent weather extremes have demonstrated that SMEs are some of the worst impacted by the Extreme Weather Events (EWEs) and have confirmed them as a highly vulnerable section of the UK economy to the impact of extreme weather. This is of particular importance to the construction industry, as an overarching majority of construction companies are SMEs who account for the majority of employment and income generation within the industry. Whilst construction has been perceived as a sector significantly vulnerable to the impacts of EWEs, there is scant evidence of how construction SMEs respond to such events and cope with their impact. Based on the evidence emerged from case studies of construction SMEs, current coping strategies of construction SMEs were identified. Some of the strategies identified were focused at organisational level whereas others were focused at project level. Further, some of the strategies were general risk management / business continuity strategies whereas others have been specifically developed to address the risk of EWEs. Accordingly, coping strategies can be broadly categorised based on their focus; i.e. those focused at project or organisational level, and based on the risks that they seek to address; i.e. business / continuity risks in general or EWE risk specifically. By overlapping these two aspects; their focus and risks that they seek to address, four categories of coping strategies can be devised. There are; general risk management strategies focused at business level, general risk management strategies focused at project level, EWE specific strategies focused at business level, and EWE specific strategies focused at project level. It is proposed that for a construction SME to effectively cope with the impact of EWEs and develop their resilience against EWEs a rich mix of these coping strategies are required to suite the particular requirements of the business.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Mobile technology has not yet achieved widespread acceptance in the Architectural, Engineering, and Construction (AEC) industry. This paper presents work that is part of an ongoing research project focusing on the development of multimodal mobile applications for use in the AEC industry. This paper focuses specifically on a context-relevant lab-based evaluation of two input modalities – stylus and soft-keyboard v. speech-based input – for use with a mobile data collection application for concrete test technicians. The manner in which the evaluation was conducted as well as the results obtained are discussed in detail.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The aim of this study is to address the main deficiencies with the prevailing project cost and time control practices for construction projects in the UK. A questionnaire survey was carried out with 250 top companies followed by in-depth interviews with 15 experienced practitioners from these companies in order to gain further insights of the identified problems, and their experience of good practice on how these problems can be tackled. On the basis of these interviews and syntheses with literature, a list of 65 good practice recommendations have been developed for the key project control tasks: planning, monitoring, reporting and analysing. The Delphi method was then used, with the participation of a panel of 8 practitioner experts, to evaluate these improvement recommendations and to establish their degree of relevance. After two rounds of Delphi, these recommendations are put forward as "critical", "important", or "helpful" measures for improving project control practice.