10 resultados para Industry projects

em Aston University Research Archive


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Conventionally, oil pipeline projects are evaluated thoroughly by the owner before investment decision is made using market, technical and financial analysis sequentially. The market analysis determines pipelines throughput and supply and demand points. Subsequent, technical analysis identifies technological options and economic and financial analysis then derives the least cost option among all technically feasible options. The subsequent impact assessment tries to justify the selected option by addressing environmental and social issues. The impact assessment often suggests alternative sites, technologies, and/or implementation methodology, necessitating revision of technical and financial analysis. This study addresses these issues via an integrated project evaluation and selection model. The model uses analytic hierarchy process, a multiple-attribute decision-making technique. The effectiveness of the model has been demonstrated through a case application on cross-country petroleum pipeline project in India.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Indian petroleum industry is passing through a very dynamic business environment due to the liberalisation of many government policies, vertical integration among organisations and the presence of multinational companies. This caused a competitive environment among the organisations in the Indian petroleum industry in the public sector. Effective project management for developing new infrastructures and maintaining the existing facilities has been considered one of the means for remaining competitive in this business environment. However, present project management practices suffer from many shortcomings, as time, cost and quality non-achievements are part and parcel of almost every project. This study focuses on identifying the issues in managing projects of the organisation in the Indian petroleum sector with the involvement of the executives in a workshop environment. This also suggests some remedial measures for resolving those issues through identifying critical success factors and enablers. The enablers not only resolve the present issues but also ensure superior performance. These are analysed in a quantitative framework to derive improvement measures in project management practices.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose - The purpose of the paper is to the identify risk factors, which affect oil and gas construction projects in Vietnam and derive risk responses. Design/methodology/approach - Questionnaire survey was conducted with the involvement of project executives of PetroVietnam and statistical analysis was carried out in order to identify the major project risks. Subsequently, mitigating measures were derived using informal interviews with the various levels of management of PetroVietnam. Findings - Bureaucratic government system and long project approval procedures, poor design, incompetence of project team, inadequate tendering practices, and late internal approval processes from the owner were identified as major risks. The executives suggested various strategies to mitigate the identified risks. Reforming the government system, effective partnership with foreign collaborators, training project executives, implementing contractor evaluation using multiple criteria decision-making technique, and enhancing authorities of project people were suggested as viable approaches. Practical implications - The improvement measures as derived in this study would improve chances of project success in the oil and gas industry in Vietnam. Originality/value - There are several risk management studies on managing projects in developing countries. However, as risk factors vary considerably across industry and countries, the study of risk management for successful projects in the oil and gas industry in Vietnam is unique and has tremendous importance for effective project management.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Operating oil pipelines in an optimum capacity through out its life, effective construction management and failure free operations are considered as critical success factors in oil transportation business. Operating oil pipelines in derated capacity due to deteriorating pipeline health or lack of demand, non-ability of augmenting pipeline capacity despite of demand, non-achievement of time, cost, and quality of pipeline construction projects, and many failures of pipelines despite of huge expenditure in inspection and maintenance are the common phenomena in oil pipelines industry. These not only cause business loss, but also increase stakeholders' concerns for sustainable development. This study addresses the above issues using an analytical framework through stakeholders' involvement. Copyright © 2006 Inderscience Enterprises Ltd.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to help managers to successfully plan, implement, and operate enterprise resource planning (ERP) projects using a risk management framework. Design/methodology/approach – This paper adopted a combined literature review and case study method. Using literature review, the paper first identified major issues of managing ERP projects and develops a risk management framework for managing those issues. The proposed risk management framework was then applied to a ERP implementation project of a UK-based energy services group and its effectiveness for managing ERP projects implementation had been demonstrated. Additionally, the risk factors as identified from the case application are compared with the risk factors from the previous researches so as to suggest mitigating measures. Findings – All the risk factors are categorized into planning, implementation and operations phases along with project processes, organizational transformation and information technology (IT) perspectives. Project implementation phase is the most vulnerable to failure. The case study results reveal that the effect of other projects on on-going ERP project, management of overall IT architecture and non-availability of resources for organizational transformation are most critical from likelihood and impact perspectives. Managing risk across various phases of project and equal emphasize to effective project management, organizational transformation and IT adoption are the key to success in ERP implementation. Practical implications – The risk factors, which were identified using literature review and the case study, have great significance as mitigating measures of those risks may result successful implementation of ERP projects in the industry. Additionally, proposed risk management framework could be customized to implement ERP projects elsewhere. Originality/value – ERP projects are risky as they are capital intensive, technically complex, and call for organizational transformation. There are both success and failure stories. However, both researchers and practitioners agree, that if it can be implemented and operated successfully and benefits should be achievable. Although there are many studies on ERP implementation, little has been discussed on managing risks of ERP projects. Therefore, this paper bridges the gap.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

For many decades, the Kingdom of Saudi Arabia has been widely known for being a reliable oil exporter. This fact, however, has not exempted it from facing significant domestic energy challenges. One of the most pressing of these challenges involves bridging the widening electricity supply-demand gap where, currently, the demand is growing at a very fast rate. One crucial means to address this challenge is through delivering power supply projects with maximum efficiency. Project delivery delay, however, is not uncommon in this highly capital-intensive industry, indicating electricity supplies are not coping with the demand increases. To provide a deeper insight into the challenges of project implementation and efficient practice, this research adopts a pragmatic approach by triangulating literature, questionnaires and semi-structured interviews. The research was conducted in the Saudi Arabian power supply industry – Western Operating Area. A total of 105 usable questionnaires were collected, and 28 recorded, semi-structured interviews were conducted, analysed and synthesised to produce a conceptual model of what constitutes the project implementation challenges in the investigated industry. This was achieved by conducting a comprehensive ranking analysis applied to all 58 identified and surveyed factors which, according to project practitioners in the investigated industry, contribute to project delay. 28 of these project delay factors were selected as the "most important" ones. Factor Analysis was employed to structure these 28 most important project delay factors into the following meaningful set of 7 project implementation challenges: Saudi Electricity Company's contractual commitments, Saudi Electricity Company's communication and coordination effectiveness, contractors' project planning and project control effectiveness, consultant-related aspects, manpower challenges and material uncertainties, Saudi Electricity Company's tendering system, and lack of project requirements clarity. The study has implications for industry policy in that it provides a coherent assessment of the key project stakeholders' central problems. From this analysis, pragmatic recommendations are proposed that, if enacted, will minimise the significance of the identified problems on future project outcomes, thus helping to ensure the electricity supply-demand gap is diminished.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The thesis addresses the economic impacts of construction safety in Greece. The research involved the development of a methodology for determining the overall costs of safety, namely the sum of the costs of accidents and the costs of safety management failures (with or without accident) including image cost. Hitherto, very little work has been published on the cost of accidents in practical case studies. Moreover, to the author’s belief, no research has been published that seeks to determine in real cases the costs of prevention. The methodology developed is new, transparent, and capable of being replicated and adapted to other employment sectors and to other countries. The methodology was applied to three construction projects in Greece to test the safety costing methodology and to offer some preliminary evidence on the business case for safety. The survey work took place between 1999 and 2001 and involved 27 months of costing work on site. The study focuses on the overall costs of safety that apply to the main (principal) contractor. The methodology is supported by 120 discrete cost categories, and systematic criteria for determining which costs are included (counted) in the overall cost of safety. A quality system (in compliance with ISO9000 series) was developed to support the work and ensure accuracy of data gathering. The results of the study offer some support for the business case for safety. Though they offer good support for the economics of safety as they demonstrate need for cost effectiveness. Subject to important caveats, those projects that appeared to manage safety more cost-effectively achieved the lowest overall safety cost. Nevertheless, results are significantly lower than of other published works for two main reasons; first costs due to damages with no potential to injury were not included and second only costs to main constructor were considered. Study’s results are discussed and compared with other publish works.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Many planning and control tools, especially network analysis, have been developed in the last four decades. The majority of them were created in military organization to solve the problem of planning and controlling research and development projects. The original version of the network model (i.e. C.P.M/PERT) was transplanted to the construction industry without the consideration of the special nature and environment of construction projects. It suited the purpose of setting up targets and defining objectives, but it failed in satisfying the requirement of detailed planning and control at the site level. Several analytical and heuristic rules based methods were designed and combined with the structure of C.P.M. to eliminate its deficiencies. None of them provides a complete solution to the problem of resource, time and cost control. VERT was designed to deal with new ventures. It is suitable for project evaluation at the development stage. CYCLONE, on the other hand, is concerned with the design and micro-analysis of the production process. This work introduces an extensive critical review of the available planning techniques and addresses the problem of planning for site operation and control. Based on the outline of the nature of site control, this research developed a simulation based network model which combines part of the logics of both VERT and CYCLONE. Several new nodes were designed to model the availability and flow of resources, the overhead and operating cost and special nodes for evaluating time and cost. A large software package is written to handle the input, the simulation process and the output of the model. This package is designed to be used on any microcomputer using MS-DOS operating system. Data from real life projects were used to demonstrate the capability of the technique. Finally, a set of conclusions are drawn regarding the features and limitations of the proposed model, and recommendations for future work are outlined at the end of this thesis.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Indian Petroleum Industry is passing through a very dynamic business environment due to liberalization. Effective project management for developing new infrastructures and maintaining the existing facilities has been considered as one of the means for remaining competitive but these practices suffer from many shortcomings, as time, cost and quality non-achievements are part and parcel of almost every project. This study focuses on identifying the specific causes of project failure by demonstrating first the characteristics of projects in Indian Petroleum industry and suggests some remedial measures for resolving these issues. The suggested project management model is integrated through information management system and demonstrated through a case study.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The construction industry is susceptible to extreme weather events (EWEs) due to most of its activities being conducted by manual workers outdoors. Although research has been conducted on the effects of EWEs, such as flooding and snowfall, limited research has been conducted on the effects of heatwaves and hot weather conditions. Heatwaves present a somewhat different risk profile to construction, unlike EWEs such as flooding and heavy snowfall that present physical obstacles to work onsite. However, heatwaves have affected the construction industry in the UK, and construction claims have been made due to adverse weather conditions. With heatwaves being expected to occur more frequently in the coming years, the construction industry may suffer unlike any other industry during the summer months. This creates the need to investigate methods that would allow construction activities to progress during hot summer months with minimal effect on construction projects. Hence, the purpose of this paper. Regions such as the Middle East and the UAE in particular flourish with mega projects, although temperatures soar to above 40̊C in the summer months. Lessons could be learnt from such countries and adapted in the UK. Interviews have been conducted with a lead representative of a client, a consultant and a contractor, all of which currently operate on UAE projects. The key findings include one of the preliminary steps taken by international construction companies operating in the UAE. This involves restructuring their entire regional team by employing management staff from countries such as Lebanon, Palestine, Iraq, and their labour force from the sub-continent such as India and Pakistan. This is not only due to the cheap wage rate but also to the ability to cope and work in such extreme hot weather conditions. The experience of individuals working in the region allows for future planning, where the difference in labour productivity during the extreme hot weather conditions is known, allowing precautionary measures to be put in place.