6 resultados para Industrial sites

em Aston University Research Archive


Relevância:

70.00% 70.00%

Publicador:

Resumo:

World and UK energy resources and use are reviewed and the role of energy conservation in energy policy identified. In considering various energy conservation measures, a distinction is made between energy intensive and non-intensive industries and also between direct and indirect uses of energy. Particular attention is given to the non-intensive user of energy. Energy use on one such industrial site has been studied to determine the most effective energy saving measures in the short term. Here it is estimated that over 65% of energy is consumed for indirect purposes, mainly for heating and lighting buildings. Emphasis is placed on energy auditing techniques and those energy saving measures requiring greater technical, economic and organisational resources to secure their implementation. Energy auditing techniques include the use of aerial thermography and snow formation surveys to detect heat losses. Qualitative and quantitative interpretations are carried out, but restricted mainly to evaluating building roof heat losses. From the energy auditing exercise, it is confirmed that the intermittent heating of buildings is the largest and most cost effective fuel saving measure. This was implemented on the site and a heat monitoring programme established to verify results. Industrial combined heat and power generation is investigated. A proposal for the site demonstrates that there are several obstacles to its successful implementation. By adopting an alternative financial rationale, a way of overcoming these obstacles is suggested. A useful by-product of the study is the classification of industrial sites according to the nature of industrial energy demand patterns. Finally, energy saving measures implemented on the site are quantlfied using comparative verification methods. Overall fuel savings of 13% are indicated. Cumulative savings in heating fuel amount to 26% over four years although heated area increased by approximately 25%.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A comprehensive survey of industrial sites and heat recovery products revealed gaps between equipment that was required and that which was available. Two heat recovery products were developed to fill those gaps: a gas-to-gas modular heat recovery unit; a gas-to-liquid exhaust gas heat exchanger. The former provided an entire heat recovery system in one unit. It was specifically designed to overcome the problems associated with existing component system of large design commitment, extensive installation and incompatibility between parts. The unit was intended to recover heat from multiple waste gas sources and, in particular, from baking ovens. A survey of the baking industry defined typical waste gas temperatures and flow rates, around which the unit was designed. The second unit was designed to recover heat from the exhaust gases of small diesel engines. The developed unit differed from existing designs by having a negligible effect on engine performance. In marketing terms these products are conceptual opposites. The first, a 'product-push' product generated from site and product surveys, required marketing following design. The second, a 'market-pull' product, resulted from a specific user need; this had a captive market and did not require marketing. Here marketing was replaced by commercial aspects including the protection of ideas, contracting, tendering and insurance requirements. These two product development routes are compared and contrasted. As a general conclusion this work suggests that it can be beneficial for small companies (as was the sponsor of this project) to undertake projects of the market-pull type. Generally they have a higher probability of success and are less capital intensive than their product-push counterparts. Development revealed shortcomings in three other fields: British Standards governing heat exchangers; financial assessment of energy saving schemes; degree day procedure of calculating energy savings. Methods are proposed to overcome these shortcomings.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Site selection is a key activity for quarry expansion to support cement production, and is governed by factors such as resource availability, logistics, costs, and socio-environmental factors. Adequate consideration of all factors facilitates both industrial productivity and sustainable economic growth. This study illustrates the site selection process that was undertaken for the expansion of limestone quarry operations to support cement production in Barbados. First, alternate sites with adequate resources to support a 25-year development horizon were identified. Second, socio-environmental conditions were described and potential impacts identified. Third, a comparative matrix was constructed to evaluate relative site characteristics with respect to physical, ecological, socio-cultural and economic factors. The study shows that environmental factors were essential to the final site recommendation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Faced with a future of rising energy costs there is a need for industry to manage energy more carefully in order to meet its economic objectives. A problem besetting the growth of energy conservation in the UK is that a large proportion of energy consumption is used in a low intensive manner in organisations where they would be responsibility for energy efficiency is spread over a large number of personnel who each see only small energy costs. In relation to this problem in the non-energy intensive industrial sector, an application of an energy management technique known as monitoring and targeting (M & T) has been installed at the Whetstone site of the General Electric Company Limited in an attempt to prove it as a means for motivating line management and personnel to save energy. The objective energy saving for which the M & T was devised is very specific. During early energy conservation work at the site there had been a change from continuous to intermittent heating but the maintenance of the strategy was receiving a poor level of commitment from line management and performance was some 5% - 10% less than expected. The M & T is concerned therefore with heat for space heating for which a heat metering system was required. Metering of the site high pressure hot water system posed technical difficulties and expenditure was also limited. This led to a ‘tin-house' design being installed for a price less than the commercial equivalent. The timespan of work to achieve an operational heat metering system was 3 years which meant that energy saving results from the scheme were not observed during the study. If successful the replication potential is the larger non energy intensive sites from which some 30 PT savings could be expected in the UK.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The research examines the deposition of airborne particles which contain heavy metals and investigates the methods that can be used to identify their sources. The research focuses on lead and cadmium because these two metals are of growing public and scientific concern on environmental health grounds. The research consists of three distinct parts. The first is the development and evaluation of a new deposition measurement instrument - the deposit cannister - designed specifically for large-scale surveys in urban areas. The deposit cannister is specifically designed to be cheap, robust, and versatile and therefore to permit comprehensive high-density urban surveys. The siting policy reduces contamination from locally resuspended surface-dust. The second part of the research has involved detailed surveys of heavy metal deposition in Walsall, West Midlands, using the new high-density measurement method. The main survey, conducted over a six-week period in November - December 1982, provided 30-day samples of deposition at 250 different sites. The results have been used to examine the magnitude and spatial variability of deposition rates in the case-study area, and to evaluate the performance of the measurement method. The third part of the research has been to conduct a 'source-identification' exercise. The methods used have been Receptor Models - Factor Analysis and Cluster Analysis - and a predictive source-based deposition model. The results indicate that there are six main source processes contributing to deposition of metals in the Walsall area: coal combustion, vehicle emissions, ironfounding, copper refining and two general industrial/urban processes. |A source-based deposition model has been calibrated using facctorscores for one source factor as the dependent variable, rather than metal deposition rates, thus avoiding problems traditionally encountered in calibrating models in complex multi-source areas. Empirical evidence supports the hypothesised associatlon of this factor with emissions of metals from the ironfoundry industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Site selection is a key activity for quarry expansion to support cement production, and is governed by factors such as resource availability, logistics, costs, and socio-environmental factors. Adequate consideration of all factors facilitates both industrial productivity and sustainable economic growth. This study illustrates the site selection process that was undertaken for the expansion of limestone quarry operations to support cement production in Barbados. First, alternate sites with adequate resources to support a 25-year development horizon were identified. Second, socio-environmental conditions were described and potential impacts identified. Third, a comparative matrix was constructed to evaluate relative site characteristics with respect to physical, ecological, socio-cultural and economic factors. The study shows that environmental factors were essential to the final site recommendation.