6 resultados para Industrial cost

em Aston University Research Archive


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The objective of the thesis was to analyse several process configurations for the production of electricity from biomass. Process simulation models using AspenPlus aimed at calculating the industrial performance of power plant concepts were built, tested, and used for analysis. The criteria used in analysis were performance and cost. All of the advanced systems appear to have higher efficiencies than the commercial reference, the Rankine cycle. However, advanced systems typically have a higher cost of electricity (COE) than the Rankine power plant. High efficiencies do not reduce fuel costs enough to compensate for the high capital costs of advanced concepts. The successful reduction of capital costs would appear to be the key to the introduction of the new systems. Capital costs account for a considerable, often dominant, part of the cost of electricity in these concepts. All of the systems have higher specific investment costs than the conventional industrial alternative, i.e. the Rankine power plant; Combined beat and power production (CUP) is currently the only industrial area of application in which bio-power costs can be considerably reduced to make them competitive. Based on the results of this work, AsperiPlus is an appropriate simulation platform. How-ever, the usefulness of the models could be improved if a number of unit operations were modelled in greater detail. The dryer, gasifier, fast pyrolysis, gas engine and gas turbine models could be improved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The work described in the following pages was carried out at various sites in the Rod Division of the Delta Metal Company. Extensive variation in the level of activity in the industry during the years 1974 to I975 had led to certain inadequacies being observed 1n the traditional cost control procedure. In an attempt to remedy this situation it was suggested that a method be found of constructing a system to improve the flexibility of cost control procedures. The work involved an assimilation of the industrial and financial environment via pilot studies which would later prove invaluable to home in on the really interesting and important areas. Weaknesses in the current systems which came to light made the methodology of data collection and the improvement of cost control and profit planning procedures easier to adopt. Because of the requirements of the project to investigate the implications of Cost behaviour for profit planning and control, the next stage of the research work was to utilise the on-site experience to examine at a detailed level the nature of cost behaviour. The analysis of factory costs then showed that certain costs, which were the most significant exhibited a stable relationship with respect to some known variable, usually a specific measure of Output. These costs were then formulated in a cost model, to establish accurate standards in a complex industrial setting in order to provide a meaningful comparison against which to judge actual performance. The necessity of a cost model was •reinforced by the fact that the cost behaviour found to exist was, in the main, a step function, and this complex cost behaviour, the traditional cost and profit planning procedures could not possibly incorporate. Already implemented from this work is the establishment of the post of information officer to co-ordinate data collection and information provision.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

World and UK energy resources and use are reviewed and the role of energy conservation in energy policy identified. In considering various energy conservation measures, a distinction is made between energy intensive and non-intensive industries and also between direct and indirect uses of energy. Particular attention is given to the non-intensive user of energy. Energy use on one such industrial site has been studied to determine the most effective energy saving measures in the short term. Here it is estimated that over 65% of energy is consumed for indirect purposes, mainly for heating and lighting buildings. Emphasis is placed on energy auditing techniques and those energy saving measures requiring greater technical, economic and organisational resources to secure their implementation. Energy auditing techniques include the use of aerial thermography and snow formation surveys to detect heat losses. Qualitative and quantitative interpretations are carried out, but restricted mainly to evaluating building roof heat losses. From the energy auditing exercise, it is confirmed that the intermittent heating of buildings is the largest and most cost effective fuel saving measure. This was implemented on the site and a heat monitoring programme established to verify results. Industrial combined heat and power generation is investigated. A proposal for the site demonstrates that there are several obstacles to its successful implementation. By adopting an alternative financial rationale, a way of overcoming these obstacles is suggested. A useful by-product of the study is the classification of industrial sites according to the nature of industrial energy demand patterns. Finally, energy saving measures implemented on the site are quantlfied using comparative verification methods. Overall fuel savings of 13% are indicated. Cumulative savings in heating fuel amount to 26% over four years although heated area increased by approximately 25%.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The economic effects of road building (beyond those accounted for in cost-benefit analysis) are not well understood. This thesis examines the issues surrounding those effects and attempts to clarify the relationship between road building and industrial location and to identify the effect on employment of that location. The literature reviewed leads to some doubt as to the efficacy of roads as an economic tool. A scries of interviews with representatives of business and property professionals in three areas adjacent to motorways is carried out. These covered the firms' location or relocation decisions, their production costs, transport needs and employment. The conclusions drawn echo the above statements based on reviewed literature: 1. There was a general lack of knowledge of transport within a firm despite subjects' very good understanding of the rest of the firms' operations. 2. The importance of major roads to the business location decision and its perceived importance to the operations of the firms was low. Property professionals sec roads as an effective marketing tool. 3. Firms have a tendency to shed labour upon relocation although this does not necessarily constitute a net loss of employment but a redistribution. Recommendations are made for further research.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Desalination is a costly means of providing freshwater. Most desalination plants use either reverse osmosis (RO) or thermal distillation. Both processes have drawbacks: RO is efficient but uses expensive electrical energy; thermal distillation is inefficient but uses less expensive thermal energy. This work aims to provide an efficient RO plant that uses thermal energy. A steam-Rankine cycle has been designed to drive mechanically a batch-RO system that achieves high recovery, without the high energy penalty typically incurred in a continuous-RO system. The steam may be generated by solar panels, biomass boilers, or as an industrial by-product. A novel mechanical arrangement has been designed for low cost, and a steam-jacketed arrangement has been designed for isothermal expansion and improved thermodynamic efficiency. Based on detailed heat transfer and cost calculations, a gain output ratio of 69-162 is predicted, enabling water to be treated at a cost of 71 Indian Rupees/m3 at small scale. Costs will reduce with scale-up. Plants may be designed for a wide range of outputs, from 5 m3/day, up to commercial versions producing 300 m3/day of clean water from brackish groundwater.