42 resultados para Indian Construction Industry
em Aston University Research Archive
Resumo:
The Indian Petroleum Industry is passing through a very dynamic business environment due to liberalization. Effective project management for developing new infrastructures and maintaining the existing facilities has been considered as one of the means for remaining competitive but these practices suffer from many shortcomings, as time, cost and quality non-achievements are part and parcel of almost every project. This study focuses on identifying the specific causes of project failure by demonstrating first the characteristics of projects in Indian Petroleum industry and suggests some remedial measures for resolving these issues. The suggested project management model is integrated through information management system and demonstrated through a case study.
Resumo:
This article explores the notion that the workplace is a learning environment, and that the line manager is a key player determining its effectiveness. The work discusses how performance management systems may be used to clarify expectations made of line managers with regard to employee development. The work, in addition, suggests that line manager people management expertise may be a factor inhibiting workplace development for subordinates, and makes a number of suggestions about how to prepare the line manager for effective employee development. Key issues are illustrated by reference to a case study example. The case demonstrates that a high profile management development programme within a major international organisation failed to meet all objectives because of the unwillingness of the line management team to participate in the development of subordinates back in the workplace.
Resumo:
The thesis addresses the economic impacts of construction safety in Greece. The research involved the development of a methodology for determining the overall costs of safety, namely the sum of the costs of accidents and the costs of safety management failures (with or without accident) including image cost. Hitherto, very little work has been published on the cost of accidents in practical case studies. Moreover, to the author’s belief, no research has been published that seeks to determine in real cases the costs of prevention. The methodology developed is new, transparent, and capable of being replicated and adapted to other employment sectors and to other countries. The methodology was applied to three construction projects in Greece to test the safety costing methodology and to offer some preliminary evidence on the business case for safety. The survey work took place between 1999 and 2001 and involved 27 months of costing work on site. The study focuses on the overall costs of safety that apply to the main (principal) contractor. The methodology is supported by 120 discrete cost categories, and systematic criteria for determining which costs are included (counted) in the overall cost of safety. A quality system (in compliance with ISO9000 series) was developed to support the work and ensure accuracy of data gathering. The results of the study offer some support for the business case for safety. Though they offer good support for the economics of safety as they demonstrate need for cost effectiveness. Subject to important caveats, those projects that appeared to manage safety more cost-effectively achieved the lowest overall safety cost. Nevertheless, results are significantly lower than of other published works for two main reasons; first costs due to damages with no potential to injury were not included and second only costs to main constructor were considered. Study’s results are discussed and compared with other publish works.
Resumo:
DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY WITH PRIOR ARRANGEMENT
Resumo:
DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT
Resumo:
This thesis examines the ways that libraries have employed computers to assist with housekeeping operations. It considers the relevance of such applications to company libraries in the construction industry, and describes more specifically the development of an integrated cataloguing and loan system. A review of the main features in the development of computerised ordering, cataloguing and circulation control systems shows that fully integrated packages are beginning to be completed, and that some libraries are introducing second generation programs. Cataloguing is the most common activity to be computerised, both at national and company level. Results from a sample of libraries in the construction industry suggest that the only computerised housekeeping system is at Taylor Woodrow. Most of the firms have access to an in-house computer, and some of the libraries, particularly those in firms of consulting engineers, might benefit from computerisation, but there are differing attitudes amongst the librarians towards the computer. A detailed study of the library at Taylor Woodrow resulted in a feasibility report covering all the areas of its activities. One of the main suggestions was the possible use of a computerised loans and cataloguing system. An integrated system to cover these two areas was programmed in Fortran and implemented. This new system provides certain benefits and saves staff time, but at the cost of time on the computer. Some improvements could be made by reprogramming, but it provides a general system for small technical libraries. A general equation comparing costs for manual and computerised operations is progressively simplified to a form where the annual saving from the computerised system is expressed in terms of staff and computer costs and the size of the library. This equation gives any library an indication of the savings or extra cost which would result from using the computerised system.
Resumo:
Existing empirical evidence on the ownership-performance issue is weighted towards the property rights hypothesis that private enterprises are superior to public enterprises. However, very few studies examine a developing country in which the strong link between the market for corporate control and the efficiency of private enterprises assumed by the property rights hypothesis may not be satisfied. Our study of the Indian banking industry confirms our expectation that, in the absence of well-functioning capital markets, there may not be significant differences in the performance of private and public enterprises. Our analysis highlights the importance of creating appropriate institutions prior to pursuing privatization in developing countries.
Resumo:
Eight steps for projectizing continuous improvement to deliver desired change
Resumo:
DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT
Servitization and enterprization in the construction industry:the case of a specialist subcontractor
Resumo:
The current economic climate and a continuing fall in output of the UK construction industry has led to falling prices and margins particularly affecting those lower down in the supply chain such as specialist subcontractors. Coen Ltd. is one such company based in the West Midlands. Faced with a need to up its game it has embarked on a business improvement programme concentrating on better operational efficiency, building stronger client relationships and delivering value added services. Lacking appropriate internal resources Coen has joined with Aston Business School in a 2 year ERDF sponsored project to fulfil the transformation programme. The paper will describe the evolution of product- service offerings in construction and link this with the work being carried out at Coen with Aston and outline the anticipated outcomes.
Resumo:
The construction industry is susceptible to extreme weather events (EWEs) due to most of its activities being conducted by manual workers outdoors. Although research has been conducted on the effects of EWEs, such as flooding and snowfall, limited research has been conducted on the effects of heatwaves and hot weather conditions. Heatwaves present a somewhat different risk profile to construction, unlike EWEs such as flooding and heavy snowfall that present physical obstacles to work onsite. However, heatwaves have affected the construction industry in the UK, and construction claims have been made due to adverse weather conditions. With heatwaves being expected to occur more frequently in the coming years, the construction industry may suffer unlike any other industry during the summer months. This creates the need to investigate methods that would allow construction activities to progress during hot summer months with minimal effect on construction projects. Hence, the purpose of this paper. Regions such as the Middle East and the UAE in particular flourish with mega projects, although temperatures soar to above 40̊C in the summer months. Lessons could be learnt from such countries and adapted in the UK. Interviews have been conducted with a lead representative of a client, a consultant and a contractor, all of which currently operate on UAE projects. The key findings include one of the preliminary steps taken by international construction companies operating in the UAE. This involves restructuring their entire regional team by employing management staff from countries such as Lebanon, Palestine, Iraq, and their labour force from the sub-continent such as India and Pakistan. This is not only due to the cheap wage rate but also to the ability to cope and work in such extreme hot weather conditions. The experience of individuals working in the region allows for future planning, where the difference in labour productivity during the extreme hot weather conditions is known, allowing precautionary measures to be put in place.
Resumo:
The Indian petroleum industry is passing through a very dynamic business environment due to the liberalisation of many government policies, vertical integration among organisations and the presence of multinational companies. This caused a competitive environment among the organisations in the Indian petroleum industry in the public sector. Effective project management for developing new infrastructures and maintaining the existing facilities has been considered one of the means for remaining competitive in this business environment. However, present project management practices suffer from many shortcomings, as time, cost and quality non-achievements are part and parcel of almost every project. This study focuses on identifying the issues in managing projects of the organisation in the Indian petroleum sector with the involvement of the executives in a workshop environment. This also suggests some remedial measures for resolving those issues through identifying critical success factors and enablers. The enablers not only resolve the present issues but also ensure superior performance. These are analysed in a quantitative framework to derive improvement measures in project management practices.