20 resultados para Implementation of ERP-system
em Aston University Research Archive
Resumo:
Database systems have a user interface one of the components of which will normally be a query language which is based on a particular data model. Typically data models provide primitives to define, manipulate and query databases. Often these primitives are designed to form self-contained query languages. This thesis describes a prototype implementation of a system which allows users to specify queries against the database in a query language whose primitives are not those provided by the actual model on which the database system is based, but those provided by a different data model. The implementation chosen is the Functional Query Language Front End (FQLFE). This uses the Daplex functional data model and query language. Using FQLFE, users can specify the underlying database (based on the relational model) in terms of Daplex. Queries against this specified view can then be made in Daplex. FQLFE transforms these queries into the query language (Quel) of the underlying target database system (Ingres). The automation of part of the Daplex function definition phase is also described and its implementation discussed.
Resumo:
Conventional project management techniques are not always sufficient to ensure time, cost and quality achievement of large-scale construction projects due to complexity in planning, design and implementation processes. The main reasons for project non-achievement are changes in scope and design, changes in government policies and regulations, unforeseen inflation, underestimation and improper estimation. Projects that are exposed to such an uncertain environment can be effectively managed with the application of risk management throughout the project's life cycle. However, the effectiveness of risk management depends on the technique through which the effects of risk factors are analysed/quantified. This study proposes the Analytic Hierarchy Process (AHP), a multiple attribute decision making technique, as a tool for risk analysis because it can handle subjective as well as objective factors in a decision model that are conflicting in nature. This provides a decision support system (DSS) to project management for making the right decision at the right time for ensuring project success in line with organisation policy, project objectives and a competitive business environment. The whole methodology is explained through a case application of a cross-country petroleum pipeline project in India and its effectiveness in project management is demonstrated.
Resumo:
Communication and portability are the two main problems facing the user. An operating system, called PORTOS, was developed to solve these problems for users on dedicated microcomputer systems. Firstly, an interface language was defined, according to the anticipated requirements and behaviour of its potential users. Secondly, the PORTOS operating system was developed as a processor for this language. The system is currently running on two minicomputers of highly different architectures. PORTOS achieves its portability through its high-level design, and implementation in CORAL66. The interface language consists of a set of user cotnmands and system responses. Although only a subset has been implemented, owing to time and manpower constraints, promising results were achieved regarding the usability of the language, and its portability.
Resumo:
A prominent theme emerging in Occupational Health and Safety (OSH) is the development of management systems. A range of interventions, according to a prescribed route detailed by one of the management systems, can be introduced into an organisation with some expectation of improved OSH performance. This thesis attempts to identify the key influencing factors that may impact upon the process of introducing interventions, (according to B88800: 1996, Guide to Implementing Occupational Health and Safety Management Systems) into an organisation. To help identify these influencing factors a review of possible models from the sphere of Total Quality Management (TQM) was undertaken and the most suitable TQM model selected for development and use in aSH. By anchoring the aSH model's development in the reviewed literature a range ofeare, medium and low level influencing factors were identified. This model was developed in conjunction with the research data generated within the case study organisation (rubber manufacturer) and applied to the organisation. The key finding was that the implementation of an OSH intervention was dependant upon three broad vectors of influence. These are the Incentive to introduce change within an organisation which refers to the drivers or motivators for OSH. Secondly the Ability within the management team to actually implement the changes refers to aspects, amongst others, such as leadership, commitment and perceptions of OSH. Ability is in turn itself influenced by the environment within which change is being introduced. TItis aspect of Receptivity refers to the history of the plant and characteristics of the workforce. Aspects within Receptivity include workforce profile and organisational policies amongst others. It was found that the TQM model selected and developed for an OSH management system intervention did explain the core influencing factors and their impact upon OSH performance. It was found that within the organisation the results that may have been expected from implementation of BS8800:1996 were not realised. The OSH model highlighted that given the organisation's starting point, a poor appreciation of the human factors of OSH, gave little reward for implementation of an OSH management system. In addition it was found that general organisational culture can effectively suffocate any attempts to generate a proactive safety culture.
Resumo:
This paper builds on a Strategic Activity Framework (Jarzabkowski, 2005) and activity based theories of development (Vygotsky, 1978) to model how Enterprise Systems are used to support emerging strategy. It makes three contributions. Firstly, it links fluidity and extensiveness of system use to patterns of strategising. Fluidity - the ability to change system use as needs change - is supported by interactive strategising, where top managers communicate directly with the organisation. Extensiveness requires procedural strategising, embedding system use in structures and routines. Secondly, it relates interactive and procedural strategising to the importance of the system - procedural strategising is more likely to occur if the system is strategically important. Thirdly, using a scaffolding metaphor it identifies patterns in the activities of top managers and Enterprise System custodians, who identify process champions within the organisational community, orient them towards system goals, provide guided support, and encourage fluidity through pacing implementation with learning.© 2013 Published by Elsevier B.V. All rights reserved.
Resumo:
DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT
Resumo:
DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT
Resumo:
Five axis machine tools are increasing and becoming more popular as customers demand more complex machined parts. In high value manufacturing, the importance of machine tools in producing high accuracy products is essential. High accuracy manufacturing requires producing parts in a repeatable manner and precision in compliance to the defined design specifications. The performance of the machine tools is often affected by geometrical errors due to a variety of causes including incorrect tool offsets, errors in the centres of rotation and thermal growth. As a consequence, it can be difficult to produce highly accurate parts consistently. It is, therefore, essential to ensure that machine tools are verified in terms of their geometric and positioning accuracy. When machine tools are verified in terms of their accuracy, the resulting numerical values of positional accuracy and process capability can be used to define design for verification rules and algorithms so that machined parts can be easily produced without scrap and little or no after process measurement. In this paper the benefits of machine tool verification are listed and a case study is used to demonstrate the implementation of robust machine tool performance measurement and diagnostics using a ballbar system.
Resumo:
Purpose – The purpose of the paper is to use a case study setting involving the implementation of an enterprise resource planning (ERP) system to expose and analyze the conflicts in the characterizations of the post bureaucratic organisation (PBO) in the literature. ERP implementations are often accompanied by increasing levels of stress in organizations that place pressures on organizational relationships and structures. Additionally, ERPs are regarded as introducing their own techno-logic of centralization, standardization and formalization that provides an apparent contrast to the exhortations about employee empowerment. Design/methodology/approach – A case study of ERP implementation in a medium-sized entity is presented. The paper explores aspects of ERP and PBO from the context of postmodern organization theory. Findings – Some concerns about PBO identified in the literature are reflected in the case situation. For example, there is a commitment to give up private time and work flexibly by some employees. The paper also provides evidence of the way the management team substitute their reliance on a key individual knowledge worker for that of an ERP system and external vendor support. Paradoxically, trust in that same knowledge worker and between core users of the system is essential to enable the implementation of the system. Originality/value – This paper adds empirical insight to a predominantly theoretical literature. The case evidence indicates some conflicting implications in the concurrent adoption of PBO and ERP.
Resumo:
As the backbone of e-business, Enterprise Resource Planning (ERP)system plays an important role in today's competitive business environment. Few publications discuss the application of ERP systems in a virtual enterprise (VE). A VE is defined as a dynamic partnership among enterprises that can bring together complementary core competencies needed to achieve a business task. Since VE strongly emphasises partner cooperation, specific issues exist relative to the implementation of ERP systems in a VE. This paper discusses the use of VE Performance Measurement System(VEPMS) to coordinate ERP systems of VE partners. It also defines the framework of a `Virtual Enterprise Resource Planning (VERP) system', and identifies research avenues in this field.
Resumo:
The development of increasingly powerful computers, which has enabled the use of windowing software, has also opened the way for the computer study, via simulation, of very complex physical systems. In this study, the main issues related to the implementation of interactive simulations of complex systems are identified and discussed. Most existing simulators are closed in the sense that there is no access to the source code and, even if it were available, adaptation to interaction with other systems would require extensive code re-writing. This work aims to increase the flexibility of such software by developing a set of object-oriented simulation classes, which can be extended, by subclassing, at any level, i.e., at the problem domain, presentation or interaction levels. A strategy, which involves the use of an object-oriented framework, concurrent execution of several simulation modules, use of a networked windowing system and the re-use of existing software written in procedural languages, is proposed. A prototype tool which combines these techniques has been implemented and is presented. It allows the on-line definition of the configuration of the physical system and generates the appropriate graphical user interface. Simulation routines have been developed for the chemical recovery cycle of a paper pulp mill. The application, by creation of new classes, of the prototype to the interactive simulation of this physical system is described. Besides providing visual feedback, the resulting graphical user interface greatly simplifies the interaction with this set of simulation modules. This study shows that considerable benefits can be obtained by application of computer science concepts to the engineering domain, by helping domain experts to tailor interactive tools to suit their needs.
Resumo:
This thesis considers management decision making at the ward level in hospitals especially by ward sisters, and the effectiveness of the intervention of a decision support system. Nursing practice theories were related to organisation and management theories in order to conceptualise a decision making framework for nurse manpower planning and deployment at the ward level. Decision and systems theories were explored to understand the concepts of decision making and the realities of power in an organisation. In essence, the hypothesis was concerned with changes in patterns of decision making that could occur with the intervention of a decision support system and that the degree of change would be governed by a set of `difficulty' factors within wards in a hospital. During the course of the study, a classification of ward management decision making was created, together with the development and validation of measuring instruments to test the research hypothesis. The decision support system used was rigorously evaluated to test whether benefits did accrue from its implementation. Quantitative results from sample wards together with qualitative information collected, were used to test this hypothesis and the outcomes postulated were supported by these findings. The main conclusion from this research is that a more rational approach to management decision making is feasible, using information from a decision support system. However, wards and ward sisters that need the most assistance, where the `difficulty' factors in the organisation are highest, benefit the least from this type of system. Organisational reviews are needed on these identified wards, involving managers and doctors, to reduce the levels of un-coordinated activities and disruption.
Resumo:
Image segmentation is one of the most computationally intensive operations in image processing and computer vision. This is because a large volume of data is involved and many different features have to be extracted from the image data. This thesis is concerned with the investigation of practical issues related to the implementation of several classes of image segmentation algorithms on parallel architectures. The Transputer is used as the basic building block of hardware architectures and Occam is used as the programming language. The segmentation methods chosen for implementation are convolution, for edge-based segmentation; the Split and Merge algorithm for segmenting non-textured regions; and the Granlund method for segmentation of textured images. Three different convolution methods have been implemented. The direct method of convolution, carried out in the spatial domain, uses the array architecture. The other two methods, based on convolution in the frequency domain, require the use of the two-dimensional Fourier transform. Parallel implementations of two different Fast Fourier Transform algorithms have been developed, incorporating original solutions. For the Row-Column method the array architecture has been adopted, and for the Vector-Radix method, the pyramid architecture. The texture segmentation algorithm, for which a system-level design is given, demonstrates a further application of the Vector-Radix Fourier transform. A novel concurrent version of the quad-tree based Split and Merge algorithm has been implemented on the pyramid architecture. The performance of the developed parallel implementations is analysed. Many of the obtained speed-up and efficiency measures show values close to their respective theoretical maxima. Where appropriate comparisons are drawn between different implementations. The thesis concludes with comments on general issues related to the use of the Transputer system as a development tool for image processing applications; and on the issues related to the engineering of concurrent image processing applications.