5 resultados para Health Planning and Evaluation

em Aston University Research Archive


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this thesis, I view the historical background of Zimbabwe to show the patterns of traditional life that existed prior to settlerism. The form, nature, pace and impact of settlerism and colonialism up to the time of independence are also discussed to show how they affected the health of the population and the pace of development of the country. The political, social and economic underdevelopment of the African people that occurred in Zimbabwe prior to independence was a result of deliberate, politically motivated and controlled policy initiatives. These led to inequatable, inadequate, inappropriate and inaccessible health care provision. It is submitted that since it was the politics that determined the pace of underdevelopment, it must be the politics that must be at the forefront of the development strategy adopted. In the face of the amed conflict that existed in Zimbabwe, existing frameworks of analyses are shown to be inadequate for planning purposes because of their inability to provide indications about the stability of future outcomes. The Metagame technique of analysis of options is proposed as a methology that can be applied in such situations. It rejects deterministic predicative models as misleading and advocates an interactive model based on objective and subjective valuation of human behaviour. In conclusion, the search for stable outcomes rather than optimal and best solutions strategies is advocated in decision making in organisations of all sizes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The present work describes the development of a proton induced X-ray emission (PIXE) analysis system, especially designed and builtfor routine quantitative multi-elemental analysis of a large number of samples. The historical and general developments of the analytical technique and the physical processes involved are discussed. The philosophy, design, constructional details and evaluation of a versatile vacuum chamber, an automatic multi-sample changer, an on-demand beam pulsing system and ion beam current monitoring facility are described.The system calibration using thin standard foils of Si, P, S,Cl, K, Ca, Ti, V, Fe, Cu, Ga, Ge, Rb, Y and Mo was undertaken at proton beam energies of 1 to 3 MeV in steps of 0.5 MeV energy and compared with theoretical calculations. An independent calibration check using bovine liver Standard Reference Material was performed.  The minimum detectable limits have been experimentally determined at detector positions of 90° and 135° with respect to the incident beam for the above range of proton energies as a function of atomic number Z. The system has detection limits of typically 10- 7 to 10- 9 g for elements 14and calculations of areal density of thin foils using Rutherford backscattering data.  Amniotic fluid samples supplied by South Sefton Health Authority were successfully analysed for their low base line elemental concentrations. In conclusion the findings of this work are discussed with suggestions for further work .

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis describes a study of the content and applicability of BS8800:1996 Guide to occupational health and safety management systems. The research is presented chronologically, with literature review and content analysis of SMS related guides and standards interwoven with two elements of qualitative empirical work. The first of these was carried out shortly after publication of BS8800 in 1996, a 'before-the-event' investigation of how organisations were intending to approach SMS implementation. The challenges faced by these organisations are reviewed against standard management theory, suggesting that the initial motivation for SMS implementation governs the approach organisations will adopt to guidance such as BS8800. The second phase of empirical work was undertaken in the context of OHSAS 18001, an auditable protocol based on BS8800, which allows organisations to certify their safety management systems. A discussion of the evolution of certifiable safety management system is presented, highlighting the similarities and differences between this, BS8800, SMS and wider management system standards. A case study then reviews the experiences of a catering company that implemented 18001, motivated by the opportunity for certification as a business benefit. The empirical work is used to comment on the guidance provided by BS8800, within its evolved role as guidance organisations may use for implementation of a SMS to be certified according to the specifications of OHSAS 18001. It is suggested that optimal implementation is facilitated by initial status review, continual improvement and the use of annexes, where there are used to make changes to the existing safety management system. This thesis concludes with a discussion of these elements, highlighting pertinent areas within BS8800 where revision or amendment may be appropriate.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Biomass is projected to account for approximately half of the new energy production required to achieve the 2020 primary energy target in the UK. Combined heat and power (CHP) bioenergy systems are not only a highly efficient method of energy conversion, at smaller-scales a significant proportion of the heat produced can be effectively utilised for hot water, space heating or industrial heating purposes. However, there are many barriers to project development and this has greatly inhibited deployment in the UK. Project viability is highly subjective to changes in policy, regulation, the finance market and the low cost incumbent; a high carbon centralised energy system. Unidentified or unmitigated barriers occurring during the project lifecycle may not only negatively impact on the project but could ultimately lead to project failure. The research develops a decision support system (DSS) for small-scale (500 kWe to 10 MWe) biomass combustion CHP project development and risk management in the early stages of a potential project’s lifecycle. By supporting developers in the early stages of project development with financial, scheduling and risk management analysis, the research aims to reduce the barriers identified and streamline decision-making. A fuzzy methodology is also applied throughout the developed DSS to support developers in handling the uncertain or approximate information often held at the early stages of the project lifecycle. The DSS is applied to a case study of a recently failed (2011) small-scale biomass CHP project to demonstrate its applicability and benefits. The application highlights that the proposed development within the case study was not viable. Moreover, further analysis of the possible barriers with the DSS confirmed that some possible modifications to be project could have improved this, such as a possible change of feedstock to a waste or residue, addressing the unnecessary land lease cost or by increasing heat utilisation onsite. This analysis is further supported by a practitioner evaluation survey that confirms the research contribution and objectives are achieved.