Faced with a future of rising energy costs there is a need for industry to manage energy more carefully in order to meet its economic objectives. A problem besetting the growth of energy conservation in the UK is that a large proportion of energy consumption is used in a low intensive manner in organisations where they would be responsibility for energy efficiency is spread over a large number of personnel who each see only small energy costs. In relation to this problem in the non-energy intensive industrial sector, an application of an energy management technique known as monitoring and targeting (M & T) has been installed at the Whetstone site of the General Electric Company Limited in an attempt to prove it as a means for motivating line management and personnel to save energy. The objective energy saving for which the M & T was devised is very specific. During early energy conservation work at the site there had been a change from continuous to intermittent heating but the maintenance of the strategy was receiving a poor level of commitment from line management and performance was some 5% - 10% less than expected. The M & T is concerned therefore with heat for space heating for which a heat metering system was required. Metering of the site high pressure hot water system posed technical difficulties and expenditure was also limited. This led to a ‘tin-house' design being installed for a price less than the commercial equivalent. The timespan of work to achieve an operational heat metering system was 3 years which meant that energy saving results from the scheme were not observed during the study. If successful the replication potential is the larger non energy intensive sites from which some 30 PT savings could be expected in the UK.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The need for an adequate information system for the Highways Departments in the United Kingdom has been recognised by the report of a committee presented to the Minister of Transport in 1970, (The Marshall Report). This research aims to present a comprehensive information system on a sound theoretical basis which should enable the different levels of management to execute their work adequately. The suggested system presented in this research covers the different functions of the Highways Department, and presents a suggested solution for problems which may occur during the planning and controlling of work in the different locations of the Highways Department. The information system consists of:- 1. A coding system covering the cost units, cost centres and cost elements. 2. Cost accounting records for the cost units and cost centres. 3. A budgeting and budgetary control system covering, the different planning methods and procedures which are required for preparing the capital expenditure budget, the improvement and maintenance operation flexible budgets and programme of work, the plant budget, the administration budget, and the purchasing budget. 4. A reporting system which ensures that the different levels of management are receiving relevant and timely information. 5. The flow of documents which covers the relationship between the prime documents, the cost accounting records, budgets, reports and their relation to the different sections and offices within the department. A comprehensive cost units, cost centres, and cost elements codes together with a number of examples demonstrating the results of the survey, and examples of the application and procedures of the suggested information system have been illustrated separately as appendices. The emphasis is on the information required for internal control by management personnel within the County Council.