5 resultados para Environmental Constraints

em Aston University Research Archive


Relevância:

60.00% 60.00%

Publicador:

Resumo:

Brewers spent grain (BSG) is a widely available feedstock representing approximately 85% of the total by-products generated in the brewing industry. This is currently either disposed of to landfill or used as cattle feed due to its high protein content. BSG has received little or no attention as a potential energy resource, but increasing disposal costs and environmental constraints are now prompting the consideration of this. One possibility for the utilisation of BSG for energy is via intermediate pyrolysis to produce gases, vapours and chars. Intermediate pyrolysis is characterised by indirect heating in the absence of oxygen for short solids residence times of a few minutes, at temperatures of 350-450 °C. In the present work BSG has been characterised by chemical, proximate, ultimate and thermo-gravimetric analysis. Intermediate pyrolysis of BSG at 450 °C was carried out using a twin coaxial screw reactor known as Pyroformer to give yields of char 29%, 51% of bio-oil and 19% of permanent gases. The bio-oil liquid was found to separate in to an aqueous phase and organic phase. The organic phase contained viscous compounds that could age over time leading to solid tars that can present problems in CHP application. The quality of the pyrolysis vapour products before quenching can be upgraded to achieve much improved suitability as a fuel by downstream catalytic reforming. A Bench Scale batch pyrolysis reactor has then been used to pyrolyse small samples of BSG under a range of conditions of heating rate and temperature simulating the Pyroformer. A small catalytic reformer has been added downstream of the reactor in which the pyrolysis vapours can be further cracked and reformed. A commercial reforming nickel catalyst was used at 500, 750 and 850 °C at a space velocity about 10,000 L/h with and without the addition of steam. Results are presented for the properties of BSG, and the products of the pyrolysis process both with and without catalytic post-processing. Results indicate that catalytic reforming produced a significant increase in permanent gases mainly (H2 and CO) with H2 content exceeding 50 vol% at higher reforming temperatures. Bio-oil yield decreased significantly as reforming temperature increased with char remaining the same as pyrolysis condition remained unchanged. The process shows an increase in heating value for the product gas ranging between 10.8-25.2 MJ/m as reforming temperature increased. © 2012 Elsevier B.V. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Investment in transport infrastructure can be highly sensitive to uncertainty. The scale and lead time of strategic transport programmes are such that they require continuing policy support and accurate forecasting. Delay, cost escalation and abandonment of projects often result if these conditions are not present. In Part One the physical characteristics of infrastructure are identified as a major constraint on planning processes. The extent to which strategies and techniques acknowledge these constraints is examined. A simple simulation model is developed to evaluate the effects on system development of variations in the scale and lead time of investments. In Part Two, two case studies of strategic infrastructure investment are analysed. The absence of a policy consensus for airport location was an important factor in the delayed resolution of the Third London Airport issue. In London itself, the traffic and environmental effects of major highway investment ultimately resulted in the abandonment of plans to construct urban motorways. In both cases, the infrastructure implications of alternative strategies are reviewed with reference to the problems of uncertainty. In conclusion, the scale of infrastructure investment is considered the most important of the constraints on the processes of transport planning. Adequate appraisal of such constraints may best be achieved by evaluation more closely aligned to policy objectives.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents an empirical study based on a survey of 399 owners of small and medium size companies in Lithuania. Applying bivariate and ordered probit estimators, we investigate why some business owners expect their firms to expand, while others do not. Our main findings provide evidence that SME owner's generic and specific human capital matter. Those with higher education and 'learning by doing' attributes, either through previous job experience or additional entrepreneurial experience, expect their businesses to expand. The expectations of growth are positively related to exporting and non-monotonically to enterprise size. In addition, we analyse the link between the perceptions of constraints to business activities and growth expectations and find that the factors, which are perceived as main business barriers, are not necessary those which are associated with reduced growth expectations. In particular, perceptions of both corruption and of inadequate tax systems seem to affect growth expectations the most.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Building's construction activities, operation and demolition are increasingly recognised as a major source of environmental impact. One strategy for reducing such impacts is most widely known by the term Building Environmental Assessment (BEA). The research is an attempt to develop a new BEA scheme for residential buildings in Brunei which focussing on identifying BEA indicators that best suit for Brunei environment, social and economy. Studies show that Brunei residential sector needs urgent attention to transform its current consumption rate in more sustainable way. Recent launch of Brunei Green Building Council, mandatory energy efficiency guidelines and declaration of ambitious energy intensity reduction target, a new BEA scheme will help contribute sustainability target in residential sector. However the issues of developing a new BEA schemes using existing methods may face constraints in their effectiveness. In this regard, a consensus-forming technique-Delphi method-helps improve greater communication and gain consensus from experts in the construction industry through series of questionnaires. As a result, the final framework is produced comprises of 7 key categories and 37 applicable criteria that achieved high degree of consensus and importance.