4 resultados para Drop Test Equipment.

em Aston University Research Archive


Relevância:

80.00% 80.00%

Publicador:

Resumo:

This thesis describes an investigation into methods for controlling the mode distribution in multimode optical fibres. The major contributions presented in this thesis are summarised below. Emerging standards for Gigabit Ethernet transmission over multimode optical fibre have led to a resurgence of interest in the precise control, and specification, of modal launch conditions. In particular, commercial LED and OTDR test equipment does not, in general, comply with these standards. There is therefore a need for mode control devices, which can ensure compliance with the standards. A novel device consisting of a point-load mode-scrambler in tandem with a mode-filter is described in this thesis. The device, which has been patented, may be tuned to achieve a wide range of mode distributions and has been implemented in a ruggedised package for field use. Various other techniques for mode control have been described in this work, including the use of Long Period Gratings and air-gap mode-filters. Some of the methods have been applied to other applications, such as speckle suppression and in sensor technology. A novel, self-referencing, sensor comprising two modal groups in the Mode Power Distribution has been designed and tested. The feasibility of a two-channel Mode Group Diversity Multiplexed system has been demonstrated over 985m. A test apparatus for measuring mode distribution has been designed and constructed. The apparatus consists of a purpose-built video microscope, and comprehensive control and analysis software written in Visual Basic. The system may be fitted with a Silicon camera or an InGaAs camera, for measurement in the 850nm and 130nm transmission windows respectively. A limitation of the measurement method, when applied to well-filled fibres, has been identified and an improvement to the method has been proposed, based on modelled Laguerre Gauss field solutions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This work follows a feasibility study (187) which suggested that a process for purifying wet-process phosphoric acid by solvent extraction should be economically viable. The work was divided into two main areas, (i) chemical and physical measurements on the three-phase system, with or without impurities; (ii) process simulation and optimization. The object was to test the process technically and economically and to optimise the type of solvent. The chemical equilibria and distribution curves for the system water - phosphoric acid - solvent for the solvents n-amyl alcohol, tri-n-butyl phosphate, di-isopropyl ether and methyl isobutyl ketone have been determined. Both pure phosphoric acid and acid containing known amounts of naturally occurring impurities (Fe P0 4 , A1P0 4 , Ca3(P04)Z and Mg 3(P0 4 )Z) were examined. The hydrodynamic characteristics of the systems were also studied. The experimental results obtained for drop size distribution were compared with those obtainable from Hinze's equation (32) and it was found that they deviated by an amount related to the turbulence. A comprehensive literature survey on the purification of wet-process phosphoric acid by organic solvents has been made. The literature regarding solvent extraction fundamentals and equipment and optimization methods for the envisaged process was also reviewed. A modified form of the Kremser-Brown and Souders equation to calculate the number of contact stages was derived. The modification takes into account the special nature of phosphoric acid distribution curves in the studied systems. The process flow-sheet was developed and simulated. Powell's direct search optimization method was selected in conjunction with the linear search algorithm of Davies, Swann and Campey. The objective function was defined as the total annual manufacturing cost and the program was employed to find the optimum operating conditions for anyone of the chosen solvents. The final results demonstrated the following order of feasibility to purify wet-process acid: di-isopropyl ether, methylisobutyl ketone, n-amyl alcohol and tri-n-butyl phosphate.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis describes the design and engineering of a pressurised biomass gasification test facility. A detailed examination of the major elements within the plant has been undertaken in relation to specification of equipment, evaluation of options and final construction. The retrospective project assessment was developed from consideration of relevant literature and theoretical principles. The literature review includes a discussion on legislation and applicable design codes. From this analysis, each of the necessary equipment units was reviewed and important design decisions and procedures highlighted and explored. Particular emphasis was placed on examination of the stringent demands of the ASME VIII design codes. The inter-relationship of functional units was investigated and areas of deficiency, such as biomass feeders and gas cleaning, have been commented upon. Finally, plant costing was summarized in relation to the plant design and proposed experimental programme. The main conclusion drawn from the study is that pressurised gasification of biomass is far more difficult and expensive to support than atmospheric gasification. A number of recommendations have been made regarding future work in this area.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background - The PELICAN Multidisciplinary Team Total Mesorectal Excision (MDT-TME) Development Programme aimed to improve clinical outcomes for rectal cancer by educating colorectal cancer teams in precision surgery and related aspects of multidisciplinary care. The Programme reached almost all colorectal cancer teams across England. We took the opportunity to assess the impact of participating in this novel team-based Development Programme on the working lives of colorectal cancer team members. Methods - The impact of participating in the programme on team members' self-reported job stress, job satisfaction and team performance was assessed in a pre-post course study. 333/568 (59%) team members, from the 75 multidisciplinary teams who attended the final year of the Programme, completed questionnaires pre-course, and 6-8 weeks post-course. Results - Across all team members, the main sources of job satisfaction related to working in multidisciplinary teams; whilst feeling overloaded was the main source of job stress. Surgeons and clinical nurse specialists reported higher levels of job satisfaction than team members who do not provide direct patient care, whilst MDT coordinators reported the lowest levels of job satisfaction and job stress. Both job stress and satisfaction decreased after participating in the Programme for all team members. There was a small improvement in team performance. Conclusions - Participation in the Development Programme had a mixed impact on the working lives of team members in the immediate aftermath of attending. The decrease in team members' job stress may reflect the improved knowledge and skills conferred by the Programme. The decrease in job satisfaction may be the consequence of being unable to apply these skills immediately in clinical practice because of a lack of required infrastructure and/or equipment. In addition, whilst the Programme raised awareness of the challenges of teamworking, a greater focus on tackling these issues may have improved working lives further.