17 resultados para Creole Petroleum Corporation.
em Aston University Research Archive
Resumo:
The Indian petroleum industry is passing through a very dynamic business environment due to the liberalisation of many government policies, vertical integration among organisations and the presence of multinational companies. This caused a competitive environment among the organisations in the Indian petroleum industry in the public sector. Effective project management for developing new infrastructures and maintaining the existing facilities has been considered one of the means for remaining competitive in this business environment. However, present project management practices suffer from many shortcomings, as time, cost and quality non-achievements are part and parcel of almost every project. This study focuses on identifying the issues in managing projects of the organisation in the Indian petroleum sector with the involvement of the executives in a workshop environment. This also suggests some remedial measures for resolving those issues through identifying critical success factors and enablers. The enablers not only resolve the present issues but also ensure superior performance. These are analysed in a quantitative framework to derive improvement measures in project management practices.
Resumo:
The existing method of pipeline health monitoring, which requires an entire pipeline to be inspected periodically, is both time-wasting and expensive. A risk-based model that reduces the amount of time spent on inspection has been presented. This model not only reduces the cost of maintaining petroleum pipelines, but also suggests efficient design and operation philosophy, construction methodology and logical insurance plans. The risk-based model uses Analytic Hierarchy Process (AHP), a multiple attribute decision-making technique, to identify the factors that influence failure on specific segments and analyzes their effects by determining probability of risk factors. The severity of failure is determined through consequence analysis. From this, the effect of a failure caused by each risk factor can be established in terms of cost, and the cumulative effect of failure is determined through probability analysis. The technique does not totally eliminate subjectivity, but it is an improvement over the existing inspection method.
Resumo:
Petroleum pipelines are the nervous system of the oil industry, as this transports crude oil from sources to refineries and petroleum products from refineries to demand points. Therefore, the efficient operation of these pipelines determines the effectiveness of the entire business. Pipeline route selection plays a major role when designing an effective pipeline system, as the health of the pipeline depends on its terrain. The present practice of route selection for petroleum pipelines is governed by factors such as the shortest distance, constructability, minimal effects on the environment, and approachability. Although this reduces capital expenditure, it often proves to be uneconomical when life cycle costing is considered. This study presents a route selection model with the application of an Analytic Hierarchy Process (AHP), a multiple attribute decision making technique. AHP considers all the above factors along with the operability and maintainability factors interactively. This system has been demonstrated here through a case study of pipeline route selection, from an Indian perspective. A cost-benefit comparison of the shortest route (conventionally selected) and optimal route establishes the effectiveness of the model.
Resumo:
The aim of this research is to improve the planning methodology of Dunlop via an analysis of their annual planning system. This was approached via an investigation of how the plans were developed; extensive interviews, which analysed divisional attitudes and approaches to planning; an analysis of forecast accuracy; and participation in the planning system itself. These investigations revealed certain deficiencies in the operating of the system. In particular, little evidence of formal planning could be found, and some divisions were reacting ex post to the market, rather than planning ex ante. The resulting plans tended to lack resilience and were generally unrealistic, partly because of imposed targets. Similarly, because the links between the elements of the system were often inefficient, previously agreed strategies were not always implemented. The analysis of forecast accuracy in the plans revealed divisions to be poor at most aspects of forecasting. Simple naive models often outperformed divisional forecasts, and much of the error was attributed to systematic, and therefore eliminable factors. These analyses suggested the need for a new system which is proposed in the form of Budgetary Planning. This system involves conceptual changes within the current planning framework. Such changes aim to revise tactical planning in order to meet the needs placed on it by. in particular, strategic planning. Budgetary Planning is an innovation in terms of the current planning literature. It is a total system of annual planning aimed at implementing and controlling the iteratively agreed strategies within the current environment. This is achieved by the generation of tactical alternatives, variable funding and concentration of forecast credibility, all of which aid both the realism and the resilience of planning.
Resumo:
This paper reconceptualises a classic theory (Kanter 1993[1977]) on gender and leadership in order to provide fresh insights for both sociolinguistic and management thinking. Kanter claimed that there are four approved ‘role traps’ for women leaders in male-dominated organisations: Mother, Pet, Seductress and Iron Maiden, based on familiar historical archetypes of women in power. This paper reinterprets Kanter's construct of role traps in sociolinguistic terms as gendered, discursive resources that senior women utilise proactively to interact with their predominantly male colleagues. Based on a Research Council funded1 study of 14 senior leaders (seven female and seven male) each conducting at least one senior management meeting in the U.K., the paper finds that individual speakers can transform stereotyped subject positions into powerful discursive resources to accomplish the goals of leadership, albeit marked by gender.
Resumo:
With the growth of the multi-national corporation (MNCs) has come the need to understand how parent companies transfer knowledge to, and manage the operations of, their subsidiaries. This is of particular interest to manufacturing companies transferring their operations overseas. Japanese companies in particular have been pioneering in the development of techniques such as Kaizen, and elements of the Toyota Production System (TPS) such as Kanban, which can be useful tools for transferring the ethos of Japanese manufacturing and maintaining quality and control in overseas subsidiaries. Much has been written about the process of transferring Japanese manufacturing techniques but much less is understood about how the subsidiaries themselves – which are required to make use of such techniques – actually acquire and incorporate them into their operations. This research therefore takes the perspective of the subsidiary in examining how knowledge of manufacturing techniques is transferred from the parent company within its surrounding (subsidiary). There is clearly a need to take a practice-based view to understanding how the local managers and operatives incorporate this knowledge into their working practices. A particularly relevant theme is how subsidiaries both replicate and adapt knowledge from parents and the circumstances in which replication or adaptation occurs. However, it is shown that there is a lack of research which takes an in-depth look at these processes from the perspective of the participants themselves. This is particularly important as much knowledge literature argues that knowledge is best viewed as enacted and learned in practice – and therefore transferred in person – rather than by the transfer of abstract and de-contextualised information. What is needed, therefore, is further research which makes an in-depth examination of what happens at the subsidiary level for this transfer process to occur. There is clearly a need to take a practice-based view to understanding how the local managers and operatives incorporate knowledge about manufacturing techniques into their working practices. In depth qualitative research was, therefore, conducted in the subsidiary of a Japanese multinational, Gambatte Corporation, involving three main manufacturing initiatives (or philosophies), namely 'TPS‘, 'TPM‘ and 'TS‘. The case data were derived from 52 in-depth interviews with project members, moderate-participant observations, and documentations and presented and analysed in episodes format. This study contributes to our understanding of knowledge transfer in relation to the approaches and circumstances of adaptation and replication of knowledge within the subsidiary, how the whole process is developed, and also how 'innovation‘ takes place. This study further understood that the process of knowledge transfer could be explained as a process of Reciprocal Provider-Learner Exchange that can be linked to the Experiential Learning Theory.
Resumo:
The existing method of pipeline health monitoring, which requires an entire pipeline to be inspected periodically, is both time-wasting and expensive. A risk-based model that reduces the amount of time spent on inspection has been presented. This model not only reduces the cost of maintaining petroleum pipelines, but also suggests an efficient design and operation philosophy, construction methodology, and logical insurance plans. The risk-based model uses the analytic hierarchy process (AHP), a multiple-attribute decision-making technique, to identify the factors that influence failure on specific segments and to analyze their effects by determining probability of risk factors. The severity of failure is determined through consequence analysis. From this, the effect of a failure caused by each risk factor can be established in terms of cost, and the cumulative effect of failure is determined through probability analysis. The technique does not totally eliminate subjectivity, but it is an improvement over the existing inspection method.
Resumo:
The Indian Petroleum Industry is passing through a very dynamic business environment due to liberalization. Effective project management for developing new infrastructures and maintaining the existing facilities has been considered as one of the means for remaining competitive but these practices suffer from many shortcomings, as time, cost and quality non-achievements are part and parcel of almost every project. This study focuses on identifying the specific causes of project failure by demonstrating first the characteristics of projects in Indian Petroleum industry and suggests some remedial measures for resolving these issues. The suggested project management model is integrated through information management system and demonstrated through a case study.
Resumo:
Projects exposed to an uncertain environment must be adapted to deal with the effective integration of various planning elements and the optimization of project parameters. Time, cost, and quality are the prime objectives of a project that need to be optimized to fulfill the owner's goal. In an uncertain environment, there exist many other conflicting objectives that may also need to be optimized. These objectives are characterized by varying degrees of conflict. Moreover, an uncertain environment also causes several changes in the project plan throughout its life, demanding that the project plan be totally flexible. Goal programming (GP), a multiple criteria decision making technique, offers a good solution for this project planning problem. There the planning problem is considered from the owner's perspective, which leads to classifying the project up to the activity level. GP is applied separately at each level, and the formulated models are integrated through information flow. The flexibility and adaptability of the models lies in the ease of updating the model parameters at the required level through changing priorities and/or constraints and transmitting the information to other levels. The hierarchical model automatically provides integration among various element of planning. The proposed methodology is applied in this paper to plan a petroleum pipeline construction project, and its effectiveness is demonstrated.
Resumo:
A cross-country pipeline construction project is exposed to an uncertain environment due to its enormous size (physical, manpower requirement and financial value), complexity in design technology and involvement of external factors. These uncertainties can lead to several changes in project scope during the process of project execution. Unless the changes are properly controlled, the time, cost and quality goals of the project may never be achieved. A methodology is proposed for project control through risk analysis, contingency allocation and hierarchical planning models. Risk analysis is carried out through the analytic hierarchy process (AHP) due to the subjective nature of risks in construction projects. The results of risk analysis are used to determine the logical contingency for project control with the application of probability theory. Ultimate project control is carried out by hierarchical planning model which enables decision makers to take vital decisions during the changing environment of the construction period. Goal programming (GP), a multiple criteria decision-making technique, is proposed for model formulation because of its flexibility and priority-base structure. The project is planned hierarchically in three levels—project, work package and activity. GP is applied separately at each level. Decision variables of each model are different planning parameters of the project. In this study, models are formulated from the owner's perspective and its effectiveness in project control is demonstrated.
Resumo:
Projects that are exposed to uncertain environments can be effectively controlled with the application of risk analysis during the planning stage. The Analytic Hierarchy Process, a multiattribute decision-making technique, can be used to analyse and assess project risks which are objective or subjective in nature. Among other advantages, the process logically integrates the various elements in the planning process. The results from risk analysis and activity analysis are then used to develop a logical contingency allowance for the project through the application of probability theory. The contingency allowance is created in two parts: (a) a technical contingency, and (b) a management contingency. This provides a basis for decision making in a changing project environment. Effective control of the project is made possible by the limitation of the changes within the monetary contingency allowance for the work package concerned, and the utilization of the contingency through proper appropriation. The whole methodology is applied to a pipeline-laying project in India, and its effectiveness in project control is demonstrated.
Resumo:
In this paper we analyse rigidities in the behaviour of the mark-up on regular, midgrade and premium varieties of petrol in the New York area using a set of weekly frequency data and a methodology that analyses the pricing process using deterministic and stochastic techniques. The results are consistent across methodologies and indicate that the speeds of adjustment to the long-run equilibrium mark-up differ across varieties of petrol with margins of the premium variety falling faster than they rise, contrary to the popular claim of welfare-decreasing asymmetries in price transmission. © 2012 The Authors. The Manchester School © 2012 Blackwell Publishing Ltd and The University of Manchester.
Resumo:
This article employs nonlinear smooth transition models to analyze the relationship between upstream and midstream prices of petroleum products. We test for the presence of nonlinearities in price linkages using both weekly series constructed using official EU procedures and also daily industry series applied for the first time. Our results show that the estimated shape of the transition function and equilibrium reversion path depend on the frequency of the price dataset. Our analysis of the crude oil to wholesale price transmission provides evidence of nonlinearities when prices are observed with daily frequency. The nature of the nonlinearities provides evidence in support of the existence of menu costs or, more generally, frictions in the markets rather than supply adjustment costs. This result differs from that found for the U.S. petroleum markets. © 2012 American Statistical Association.