8 resultados para Contractor

em Aston University Research Archive


Relevância:

10.00% 10.00%

Publicador:

Resumo:

This report investigates why a nationally important and internationally funded infrastructural project within the Caribbean island of Barbados — The South Coast Sewerage Project — spurned a substantial level of negative socio-economic externalities. Primary and secondary research evaluated the presence or effectiveness of social impact assessment as a mitigation tool. The mitigation measures suggested within the appraisal report appear to have been considered by the Project Execution Unit (PEU) of Government of Barbados. The primary obstacle seems to have been the implementation of the mitigation process by the contractor. This highlights the need to foster an interconnected and symbiotic relationship between appraisal and implementation, if an initiative is to be conducted efficiently and effectively. Additionally, the South Coast Sewerage Project exemplifies the importance of establishing and sustaining a monitoring/control mechanism as an integral part of project construction.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose - The purpose of the paper is to the identify risk factors, which affect oil and gas construction projects in Vietnam and derive risk responses. Design/methodology/approach - Questionnaire survey was conducted with the involvement of project executives of PetroVietnam and statistical analysis was carried out in order to identify the major project risks. Subsequently, mitigating measures were derived using informal interviews with the various levels of management of PetroVietnam. Findings - Bureaucratic government system and long project approval procedures, poor design, incompetence of project team, inadequate tendering practices, and late internal approval processes from the owner were identified as major risks. The executives suggested various strategies to mitigate the identified risks. Reforming the government system, effective partnership with foreign collaborators, training project executives, implementing contractor evaluation using multiple criteria decision-making technique, and enhancing authorities of project people were suggested as viable approaches. Practical implications - The improvement measures as derived in this study would improve chances of project success in the oil and gas industry in Vietnam. Originality/value - There are several risk management studies on managing projects in developing countries. However, as risk factors vary considerably across industry and countries, the study of risk management for successful projects in the oil and gas industry in Vietnam is unique and has tremendous importance for effective project management.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Whole life costing (WLC) has become the best practice in construction procurement and it is likely to be a major issue in predicting whole life costs of a construction project accurately. However, different expectations from different organizations throughout a project's life and the lack of data, monitoring targets, and long-term interest for many key players are obstacles to be overcome if WLC is to be implemented. A questionnaire survey was undertaken to investigate a set of ten common factors and 188 individual factors. These were grouped into eight critical categories (project scope, time, cost, quality, contract/administration, human resource, risk, and health and safety) by project phase, as perceived by the clients, contractors and subcontractors in order to identify critical success factors for whole life performance assessment (WLPA). Using a relative importance index, the top ten critical factors for each category, from the perspective of project participants, were analyzed and ranked. Their agreement on those categories and factors were analyzed using Spearman's rank correlation. All participants identify “Type of Project” as the most common critical factor in the eight categories for WLPA. Using the relative index ranking technique and weighted average methods, it was found that the most critical individual factors in each category were: “clarity of contract” (scope); “fixed construction period” (time); “precise project budget estimate” (cost); “material quality” (quality); “mutual/trusting relationships” (contract/administration); “leadership/team management” (human resource); and “management of work safety on site” (health and safety). There was relatively a high agreement on these categories among all participants. Obviously, with 80 critical factors of WLPA, there is a stronger positive relationship between client and contactor rather than contractor and subcontractor, client and subcontractor. Putting these critical factors into a criteria matrix can facilitate an initial framework of WLPA in order to aid decision making in the public sector in South Korea for evaluation/selection process of a construction project at the bid stage.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This thesis describes the procedure and results from four years research undertaken through the IHD (Interdisciplinary Higher Degrees) Scheme at Aston University in Birmingham, sponsored by the SERC (Science and Engineering Research Council) and Monk Dunstone Associates, Chartered Quantity Surveyors. A stochastic networking technique VERT (Venture Evaluation and Review Technique) was used to model the pre-tender costs of public health, heating ventilating, air-conditioning, fire protection, lifts and electrical installations within office developments. The model enabled the quantity surveyor to analyse, manipulate and explore complex scenarios which previously had defied ready mathematical analysis. The process involved the examination of historical material costs, labour factors and design performance data. Components and installation types were defined and formatted. Data was updated and adjusted using mechanical and electrical pre-tender cost indices and location, selection of contractor, contract sum, height and site condition factors. Ranges of cost, time and performance data were represented by probability density functions and defined by constant, uniform, normal and beta distributions. These variables and a network of the interrelationships between services components provided the framework for analysis. The VERT program, in this particular study, relied upon Monte Carlo simulation to model the uncertainties associated with pre-tender estimates of all possible installations. The computer generated output in the form of relative and cumulative frequency distributions of current element and total services costs, critical path analyses and details of statistical parameters. From this data alternative design solutions were compared, the degree of risk associated with estimates was determined, heuristics were tested and redeveloped, and cost significant items were isolated for closer examination. The resultant models successfully combined cost, time and performance factors and provided the quantity surveyor with an appreciation of the cost ranges associated with the various engineering services design options.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The thesis addresses the economic impacts of construction safety in Greece. The research involved the development of a methodology for determining the overall costs of safety, namely the sum of the costs of accidents and the costs of safety management failures (with or without accident) including image cost. Hitherto, very little work has been published on the cost of accidents in practical case studies. Moreover, to the author’s belief, no research has been published that seeks to determine in real cases the costs of prevention. The methodology developed is new, transparent, and capable of being replicated and adapted to other employment sectors and to other countries. The methodology was applied to three construction projects in Greece to test the safety costing methodology and to offer some preliminary evidence on the business case for safety. The survey work took place between 1999 and 2001 and involved 27 months of costing work on site. The study focuses on the overall costs of safety that apply to the main (principal) contractor. The methodology is supported by 120 discrete cost categories, and systematic criteria for determining which costs are included (counted) in the overall cost of safety. A quality system (in compliance with ISO9000 series) was developed to support the work and ensure accuracy of data gathering. The results of the study offer some support for the business case for safety. Though they offer good support for the economics of safety as they demonstrate need for cost effectiveness. Subject to important caveats, those projects that appeared to manage safety more cost-effectively achieved the lowest overall safety cost. Nevertheless, results are significantly lower than of other published works for two main reasons; first costs due to damages with no potential to injury were not included and second only costs to main constructor were considered. Study’s results are discussed and compared with other publish works.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Despite having been described by the then (2003) Chief Pharmaceutical Officer for England as ·probably the biggest untapped resource for health improvement", the development of the public health function of community pharmacists has been limited. However, devolution of healthcare budgets has led 10 differential rates of development of the public health function in each administration of the UK (England, Scotland, Wales and Northern Ireland). This is measured and reflected upon in this thesis. Two large-scale surveys were conducted, one of key strategic personnel (Directors of Public Health and Chief Pharmacists) in Primary Care Organisations (PCOs) and one of practicing community pharmacists. This research highlights the fact that community pharmacists have developed an individualistic, service-based approach to their engagement with public health that is contrary to the more collective approach adopted by the wider public health movement. The study measures the scope and level of health-improving services through community pharmacy across the UK and shows that the nature of the pharmacy contractor (independent, multiple etc.) may impact on the range and nature of services provided. Survey data also suggest that attitudes towards pharmacy involvement in the public health agenda vary markedly between Directors of Public Health, PCO Chief Pharmacists, and community pharmacists. Furthermore, within the community pharmacist population, attitudes are affected by a wide range of factors including the nature of employment (owner, employee, self-employed) and the type of employing pharmacy (independent, multiple etc.). Implications for policy and areas for further research aimed at maximising the public health function of community pharmacists are suggested.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The construction industry is susceptible to extreme weather events (EWEs) due to most of its activities being conducted by manual workers outdoors. Although research has been conducted on the effects of EWEs, such as flooding and snowfall, limited research has been conducted on the effects of heatwaves and hot weather conditions. Heatwaves present a somewhat different risk profile to construction, unlike EWEs such as flooding and heavy snowfall that present physical obstacles to work onsite. However, heatwaves have affected the construction industry in the UK, and construction claims have been made due to adverse weather conditions. With heatwaves being expected to occur more frequently in the coming years, the construction industry may suffer unlike any other industry during the summer months. This creates the need to investigate methods that would allow construction activities to progress during hot summer months with minimal effect on construction projects. Hence, the purpose of this paper. Regions such as the Middle East and the UAE in particular flourish with mega projects, although temperatures soar to above 40̊C in the summer months. Lessons could be learnt from such countries and adapted in the UK. Interviews have been conducted with a lead representative of a client, a consultant and a contractor, all of which currently operate on UAE projects. The key findings include one of the preliminary steps taken by international construction companies operating in the UAE. This involves restructuring their entire regional team by employing management staff from countries such as Lebanon, Palestine, Iraq, and their labour force from the sub-continent such as India and Pakistan. This is not only due to the cheap wage rate but also to the ability to cope and work in such extreme hot weather conditions. The experience of individuals working in the region allows for future planning, where the difference in labour productivity during the extreme hot weather conditions is known, allowing precautionary measures to be put in place.