8 resultados para Construction management and engineering - China
em Aston University Research Archive
Resumo:
Undergraduate programmes on construction management and other closely related built environment disciplines are currently taught and assessed on a modular basis. This is the case in the UK and in many other countries globally. However, it can be argued that professionally oriented programmes like these are better assessed on a non-modular basis, in order to produce graduates who can apply knowledge on different subject contents in cohesion to solve complex practical scenarios in their work environments. The examples of medical programmes where students are assessed on a non-modular basis can be cited as areas where this is already being done. A preliminary study was undertaken to explore the applicability of non-modular assessment within construction management undergraduate education. A selected sample of university academics was interviewed to gather their perspectives on applicability of non-modular assessment. General acceptance was observed among the academics involved that integrating non-modular assessment is applicable and will be beneficial. All academics stated that at least some form of non-modular assessment as being currently used in their programmes. Examples where cross-modular knowledge is assessed included comprehensive/multi-disciplinary project modules and creating larger modules to amalgamate a number of related subject areas. As opposed to a complete shift from modular to non-modular, an approach where non-modular assessment is integrated and its use further expanded within the current system is therefore suggested. This is due to the potential benefits associated with this form of assessment to professionally aligned built environment programmes
Resumo:
Purpose - The idea that knowledge needs to be codified is central to many claims that knowledge can be managed. However, there appear to be no empirical studies in the knowledge management context that examine the process of knowledge codification. This paper therefore seeks to explore codification as a knowledge management process. Design/methodology/approach - The paper draws on findings from research conducted around a knowledge management project in a section of the UK Post Office, using a methodology of participant-observation. Data were collected through observations of project meetings, correspondence between project participants, and individual interviews. Findings - The principal findings about the nature of knowledge codification are first, that the process of knowledge codification also involves the process of defining the codes needed to codify knowledge, and second, that people who participate in the construction of these codes are able to interpret and use the codes more similarly. From this it can be seen that the ability of people to decodify codes similarly places restrictions on the transferability of knowledge between them. Research limitations/implications - The paper therefore argues that a new conceptual approach is needed for the role of knowledge codification in knowledge management that emphasizes the importance of knowledge decodification. Such an approach would start with one's ability to decodify rather than codify knowledge as a prerequisite for knowledge management. Originality/value - The paper provides a conceptual basis for explaining limitations to the management and transferability of knowledge. © Emerald Group Publishing Limited.
Resumo:
This thesis describes the design and engineering of a pressurised biomass gasification test facility. A detailed examination of the major elements within the plant has been undertaken in relation to specification of equipment, evaluation of options and final construction. The retrospective project assessment was developed from consideration of relevant literature and theoretical principles. The literature review includes a discussion on legislation and applicable design codes. From this analysis, each of the necessary equipment units was reviewed and important design decisions and procedures highlighted and explored. Particular emphasis was placed on examination of the stringent demands of the ASME VIII design codes. The inter-relationship of functional units was investigated and areas of deficiency, such as biomass feeders and gas cleaning, have been commented upon. Finally, plant costing was summarized in relation to the plant design and proposed experimental programme. The main conclusion drawn from the study is that pressurised gasification of biomass is far more difficult and expensive to support than atmospheric gasification. A number of recommendations have been made regarding future work in this area.
Resumo:
Service-based systems that are dynamically composed at run time to provide complex, adaptive functionality are currently one of the main development paradigms in software engineering. However, the Quality of Service (QoS) delivered by these systems remains an important concern, and needs to be managed in an equally adaptive and predictable way. To address this need, we introduce a novel, tool-supported framework for the development of adaptive service-based systems called QoSMOS (QoS Management and Optimisation of Service-based systems). QoSMOS can be used to develop service-based systems that achieve their QoS requirements through dynamically adapting to changes in the system state, environment and workload. QoSMOS service-based systems translate high-level QoS requirements specified by their administrators into probabilistic temporal logic formulae, which are then formally and automatically analysed to identify and enforce optimal system configurations. The QoSMOS self-adaptation mechanism can handle reliability- and performance-related QoS requirements, and can be integrated into newly developed solutions or legacy systems. The effectiveness and scalability of the approach are validated using simulations and a set of experiments based on an implementation of an adaptive service-based system for remote medical assistance.
Resumo:
Despite the availability of various control techniques and project control software many construction projects still do not achieve their cost and time objectives. Research in this area so far has mainly been devoted to identifying causes of cost and time overruns. There is limited research geared towards studying factors inhibiting the ability of practitioners to effectively control their projects. To fill this gap, a survey was conducted on 250 construction project organizations in the UK, which was followed by face-to-face interviews with experienced practitioners from 15 of these organizations. The common factors that inhibit both time and cost control during construction projects were first identified. Subsequently 90 mitigating measures have been developed for the top five leading inhibiting factors—design changes, risks/uncertainties, inaccurate evaluation of project time/duration, complexities and non-performance of subcontractors were recommended. These mitigating measures were classified as: preventive, predictive, corrective and organizational measures. They can be used as a checklist of good practice and help project managers to improve the effectiveness of control of their projects.
Resumo:
In this chapter, we discuss performance management systems (PMSs) and high performance work systems (HPWSs) in emerging economies. We start by discussing PMSs, with specific emphasis on PMSs in global organizations. We follow this up with an introduction of HPWSs, and then discuss PMSs and HPWSs in emerging economies. While the list of emerging economies keeps changing, and is rather long, as one might expect, in this chapter we have concentrated on five key emerging economies – China, India, Mexico, South Korea, and Turkey. Performance management is the process through which organizations set goals, determine standards, assign and evaluate work, coach and give feedback, and distribute rewards (Fletcher, 2001). In this connection, organizations all over the world face the challenge of how best to manage performance, including finding ways to motivate employees to sustain high levels of performance. In other words, organizations must develop and implement PMSs that are appropriate for their environment in such a way that high levels of performance can be achieved and sustained over time (DeNisi, Varma and Budhwar, 2008). While all organizations need to address these issues, the way a firm decides to go about addressing these issues is dependent on its location and context. In other words, differences in local norms, culture, law, and technology, make it critical that organizations develop and/or adapt techniques, policies and practices that are appropriate to the setting (see for example, Hofstede, 1993).